Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹8.0 L+₹14,086.72 (1.79%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹8.1 L+₹22,625.98 (2.87%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI VALLAM CONSTRUCTION L3 | K THAMIZHMANI L2 | GSS CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of Community Hall at Thadavamooorthy in Kameswaram Panchayt | ||||||
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 21.18 | M2 | 250.59 ₹5,307.5 | 247.95 ₹5,251.58 Lowest | 250 ₹5,295 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specifica | 4.75 | M3 | 2,666.58 ₹12,666.26 | 2,638.51 ₹12,532.92 Lowest | 2,800 ₹13,300 |
| 4.00 | Cement concrete in 1 : 4: 8 mix using ISS HBG Metal including and all labour charges | 5.4 | M3 | 6,408.84 ₹34,607.74 | 6,341.38 ₹34,243.45 Lowest | 6,500 ₹35,100 |
| 5.00 | Brick work in CM 1 : 5 mixusing country s sizeof 9" x 43/8" x 23/4 " c brick inclduing all labour chrges cost and conveyance of etc., complete up basement | 4.43 | M3 | 6,031.03 ₹26,717.46 | 5,967.54 ₹26,436.2 Lowest | 6,250 ₹27,687.5 |
| 6.00 | Brick work in CM 1 : 5 mixusing country s sizeof 9" x 43/8" x 23/4 " c brick inclduing all labour chrges cost and conveyance of etc., complete Ground floor | 14.69 | M3 | 6,031.03 ₹88,595.83 | 5,967.54 ₹87,663.16 Lowest | 6,400 ₹94,016 |
| 7.00 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | 89.37 | M3 | 938.03 ₹83,831.74 | 928.16 ₹82,949.66 | 490 ₹43,791.3 Lowest |
| 8.00 | Cost and supply of steel including fabrication charges such as cutting bending and tying with binding wire and placing in position | 1.45 | MT | 87,300.25 ₹1,26,585.36 | 86,381.3 ₹1,25,252.89 Lowest | 90,000 ₹1,30,500 |
| 9.00 | R C C 1:1 1/2:3 mix using 20mm ISS HBG Metal Including cost and conveyance of labour charges etc., complete | 13.21 | M3 | 9,953.85 ₹1,31,490.36 | 9,849.08 ₹1,30,106.35 Lowest | 10,000 ₹1,32,100 |
| 10.00 | Supplying and applying of two coats of Putty of 3mm thic over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing. | 24 | M2 | 57 ₹1,368 | 56.4 ₹1,353.6 Lowest | 300 ₹7,200 |
Tender Value
₹8.6 L
EMD Value
₹8,630
Closing Date
20 Jul 2026, 4:00 pmClosed
The Block Development Officer, Keelaiyur
The Block Development Office, Keelaiyur
Construction of Community Hall at Thadavamooorthy in Kameswaram Panchayt
2026_RDTN_682742_1
310/2026/B2/Dt.23.06.2026
Open Tender
Civil Works
Item Rate
Keelaiyur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8,630
14 Aug 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Community Hall at Thadavamooorthy in Kameswaram Panchayt | - | - | - | - |
| 2 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 21.18 | M2 | - | - |
| 3 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specifica | - | M3 | - | - |
| 4 | Cement concrete in 1 : 4: 8 mix using ISS HBG Metal including and all labour charges | 5.4 | M3 | - | - |
| 5 | Brick work in CM 1 : 5 mixusing country s sizeof 9" x 43/8" x 23/4 " c brick inclduing all labour chrges cost and conveyance of etc., complete up basement | 1 | M3 | - | - |
| 6 | Brick work in CM 1 : 5 mixusing country s sizeof 9" x 43/8" x 23/4 " c brick inclduing all labour chrges cost and conveyance of etc., complete Ground floor | 14.69 | M3 | - | - |
| 7 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | - | M3 | - | - |
| 8 | Cost and supply of steel including fabrication charges such as cutting bending and tying with binding wire and placing in position | - | MT | - | - |
| 9 | R C C 1:1 1/2:3 mix using 20mm ISS HBG Metal Including cost and conveyance of labour charges etc., complete | 13.21 | M3 | - | - |
| 10 | Supplying and applying of two coats of Putty of 3mm thic over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing. | - | M2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
BOQ_820722.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .