Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
6 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
SIG WORKS
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less, where: V= Advertised value of thetenderincrores of Rupees N=Number of years prescribed for completion of work for which bids have been invited. The averageannualcontractualturnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as pertheauditedbalance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet ofthefourthprevious year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisiteinformationasper Annexure VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ CertificatefromCharteredAccountant duly supported by Audited Balance Sheet As per Clause No. 10.2 of Tender Form (second Sheet) of Annex. I of Part-IofGCC-2022,with up to date correction slip.
The tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last07(seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than theamount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of theadvertised value of the tender, or (iii) One similar work each costing not less than the amount equal to 60% of the advertised value ofthetenderWork experience certificate from private individual shall not be considered. However, in addition to work experience certificatesissuedbyany Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 croreandabovein last 3 financial years excluding the current financial year, listed on National Stock Exchange or BombayStockExchange,incorporated/registered at least 5 years prior to the date of closing of tender,shall also be considered provided the workexperiencecertificate has been issued by a person authorized by thePublic listed company to issue such certificates. In case tenderer submitsworkexperience certificate issued by public listed company, thetenderer shall also submit along with work experience certificate, the relevantcopy ofwork order, bill of quantities, bill wise details of paymentreceived duly certified by Chartered Accountant, TDS certificates for allpaymentsreceived and copy of final/last bill paid by company insupport of above work experience certificate. As per Clause No. 10.1 of TenderFormsecond Sheet of Annex. I of Part-I of GCC 2022, with up-todatecorrection slip.
Definition of similar work: "Any Signalling Work "
62 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer should note that tender will be dealt as per GCC 2022 and latest amendments to it.
Rates in the schedule items of work are inclusive of all taxes as per clause 37 of GCC-2022
Wherever there is any ambiguity in SOR Item Description, that particular item description in latest RDSO Specification to be considered as FINAL.
Telecom Circular No. 09/2023 (copy attached) shall be religiously followed for undertaking digging work in the vicinity of Signalling, Electrical and Telecommunication Cables. Zonal Railways issued local instructions/JPO for protection of cables while undertaking works in the vicinity of Railway Tracks in line with Telecom Circular 09/2023.
Provision for reliability improvement of various components/parts of MSDAC and HASSDAC in section of DSTE-I/JP.
SNT-JP-22-2026-27~NWR
SNT-JP-22-2026-27
Open
Works - General
8 Months
Jaipur, Rajasthan
₹0
₹2.4 L
11 Sept 2026
11 Sept 2026
22 Sept 2026
96 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 16,16,424.34 | ||
| — | 18.00 | — | — | ||
| Supply of DC to DC Converter, 110V DC/24V DC, 10 Amp suitable to SMPS based IPS systems.Inspection: RDSOInspection Charges: Borne by Railways Payment Terms: 100% on Supply | — | — | — | 3,50,098.74 | |
| — | 100.00 | — | — | ||
| Supply of Cartridge Fuse Block made of PBT and as per RDSO Drg. No. SA-23748 (Alt. 4) or latest and RDSO Specn.No.IRS:S-75/2006 (Rev.2) or latest.Inspection: RDSO.Inspection Charges: Borne by Railways.Payment Terms: 100% on supply. | — | — | — | 18,411 | |
| — | 100.00 | — | — | ||
| Supply of round head type non-deteriorating type low voltage cartridge fuse as per RDSO Specn.No.IRS:S-78/92 or latest and Capacity - 2/4/6/10A/16A/20A Amp. (material will be supplied only from approved vendors of RDSO).Inspection: ConsigneeInspection Charges: Borne by Railways.Payment Terms: 100% on supply. | — | — | — | 6,576 | |
| — | 400.00 | — | — | ||
| Fixing of ARA(M-6) Terminals /Screw less connectors / modular disconnect terminal blocks and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry. (Supply of all above terminals have been covered separately in Chapter 4 of SOR)Inspection: ConsigneeInspection Charges: NonePayment Terms: 100% after installation. | — | — | — | 6,028 | |
| — | 400.00 | — | — | ||
| Supply of ARA Terminal Block (M-6) made of PBT/Poly Carbonate as per RDSO Specn.No.IRS:S-75/2006 (Rev.2) or latest and RDSO Drg. No. SA-23741A (Alt. 4) or latest.Inspection: RDSO.Inspection Charges: Borne by Railways.Payment Terms: 100% on supply. | — | — | — | 42,080 | |
| — | 400.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables) at both ends in location boxes, cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc under supervision and instructions issued by Engr. incharge of the work. Inspection: ConsigneeInspection Charges: NonePayment Terms: 100% after execution | — | — | — | 4,072 | |
| — | 3000.00 | — | — | ||
| Supplying and placing of one layer of standard size of 'B' grade quality bricks of the local make spreading on cables laid. (minimum size of brick 200mm X 100mm X 70mm)Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Installation. Length wise (up to 2 cables). | — | — | — | 53,430 | |
| — | 300.00 | — | — | ||
| Horizontal direction drilling/boring without damage of surface road /track using Auger Machine (HDD machine) or by Closed trench Method. The bore shall be upto 200 mm Dia & shall be done at the depth of minimum 1200 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. The length of the bore shall be minimum 4 Mtrs long. This includes insertion of different Dia DWC-HDPE pipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note: - Pipe Supply is not covered under this item. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution | — | — | — | 4,34,331 | |
| — | 1000.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003 or latest alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on North Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m. (cum is Cubic Meter)Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution | — | — | — | 3,30,100 | |
| — | 6000.00 | — | — | ||
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometer post. (Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes.Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution | — | — | — | 65,700 | |
| — | 10.00 | — | — | ||
| Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No. RDSO/SPN/197 Version 1.0 dtd. 04.07.2016 or latest and conforming to RDSO Drg. No. SDO/ RDSO/E&B/001. It consist of following:(a) Copper bonded steel electrode of 3.0 m long, 17 mm Dia with copper bonding thickness of minimum macrons and UL listed and marked = 1 no.(b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 nos.(c) Copper strip of 150x25x6 mm, to terminate earth rod = 1 no.(d) Copper strip of 300x25x6 mm (MEEB) = 1 no.(e) Copper strip of 150x25x6mm (SEEB) = 1 no.(ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate.(minimum 10 meter)(iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter )(iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB(v) Supply of copper lug sleeve for 3/16 cableInspection: RDSOInspection Charges: Borne by RailwaysPayment Terms: 100% after Supply | — | — | — | 2,10,982.3 | |
| — | 10.00 | — | — | ||
| Installation of Unit Maintenance Free Earth as supplied under item no. 13010300 above It includes:( i ) Digging the earth to the required depth.(ii) Insertion of electrode.(iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor.(v) This also includes CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3-inch thickness.Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm Dia and 3.00 meter long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 microns to made requirement of under writer's laboratories (UL) 467-2007 or latest.Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equip- potential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip-potential busbar in relay room, power room and panel room.GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits.Note: The installation of this item shall be carried out by the contractor as per RDSO/SPN/197 Version 1.0 dtd. 04.07.2016 or latest and conforming to RDSO Drg. No. S DO/RDSO/E&B/001 or latest.Inspection: ConsigneeInspection Charges: NonePayment Terms: 100% after execution and testing. | — | — | — | 94,615.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TelecomCircularNo.09_1.pdf
ATTACHMENT
MakeInIndiaPolicy2017.pdf
ATTACHMENT
GCC202210NosCorrectionSlipsofGCC_compressed.pdf GCC and 10 Nos Correction Slip
ATTACHMENT
GCCACS-11dated13.03.26_compressed.pdf
ATTACHMENT
GCC Corection Slip No 12
ATTACHMENT
TeenderDocofTenderNoSNT-JP-22-2026-27.pdf
ATTACHMENT
GCC202210NosCorrectionSlipsofGCC_compressed.pdf
ATTACHMENT
ACSNo12ofIndianRailwayStandardGCCApril-2022issuedon12-08-2026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .