| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | ₹4.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.9 L+₹13,590 (2.87%)Rejected-Finance | ₹4.9 L+₹13,590 (2.87%) | L2 | Rejected-Finance L2 |
Tender Value
₹4.7 L
EMD Value
₹9,400
Closing Date
14 Aug 2026, 5:00 pmClosed
Executive Engineer
Electrical Division No.II, HPPWD, U.S. Club, Shimla-01.
Running and operation of PSA plant by providing manpower Civil Hospital Theog District Shimla for one year.
2026_PWD_140576_4
ED.II.TA.NIT.26-2046 dt. 03-08-2026
Open Tender
Electrical Works
Percentage
365 days
Theog
Please refer to tender documents. Eligibility criteria is mentioned at page No. 6-7, 9-10 of GCC. Documents mentioned in eligibility criteria must be uploaded to qualify the bid.
7 documents required · 7 mandatory
₹350
₹9,400
27 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1The work comprises engagement of 04 (four) Oxygen Plant Drivers/Operators for operation, routine maintenance, monitoring, and upkeep of the PSA Oxygen Generation Plant along with the manifold system and associated oxygen pipeline network installed at Civil Hospital, Rohru. The contractor shall ensure smooth, efficient, and uninterrupted functioning of the complete oxygen supply system on a round-the-clock (24×7) basis, strictly as per the requirements of the SMO, Civil Hospital Theog, and directions of the Engineer-in-Charge. . | |||||
| 1.01 | The contractor shall be responsible for operation of the PSA oxygen plant, manifold system, control panels, and all associated equipment, including starting, stopping, regulating pressure, monitoring purity levels, and ensuring continuous oxygen supply to all designated points within the hospital. The scope also includes assembling, installing, testing, and maintaining oxygen pipelines, manifolds, equipment, appliances, fixtures, and related systems using appropriate tools and equipment. The contractor shall carry out laying, fixing, and routing of oxygen pipelines/conduits within walls, ceilings, trenches, or other concealed or open areas as required. | - | - | - | - |
| 1.02 | The contractor shall conduct regular inspection of the entire oxygen system, including PSA plant machinery, compressors, dryers, valves, gauges, pipelines, manifolds, and electrical/control components, to identify any defects, leakages, hazards, or deterioration. Preventive maintenance shall be carried out periodically to ensure optimal performance and safety of the system. The contractor shall also test the functioning of oxygen plant systems, pipeline continuity, and all associated equipment using appropriate testing devices and instruments. | - | - | - | - |
| 1.03 | In case of any fault or breakdown, the contractor shall promptly diagnose the problem using standard testing equipment and carry out necessary repairs or replacement of defective parts, including pipelines, valves, fittings, electrical wiring, control systems, or any other component. The contractor shall maintain adequate tools, tackles, and essential spares for timely rectification of faults. The maximum permissible breakdown period shall not exceed 06 (six) hours from the time of reporting, and all efforts shall be made to restore the system in the shortest possible time | - | - | - | - |
| 1.04 | The contractor shall also perform all ancillary and physically demanding tasks associated with the work, including trenching for pipeline laying, handling, shifting, loading and unloading of oxygen cylinders, and working at heights using ladders, scaffolding, or other arrangements wherever required. All safety precautions and standard practices as per CPWD norms and relevant safety codes shall be strictly followed. | - | - | - | - |
| 1.05 | The contractor shall provide immediate support during emergencies and critical situations by ensuring prompt and efficient operation of the oxygen plant and manifold system. The deployed staff shall remain available on duty as per shift requirements and shall attend to all emergency calls without delay, including during night hours, holidays, or unforeseen situations. | - | - | - | - |
| 1.06 | The contractor shall be fully responsible for maintaining the entire oxygen generation and distribution system in functional condition at all times and shall ensure deployment of adequately trained, skilled, and experienced personnel. Proper records/logbooks of plant operation, maintenance activities, breakdowns, and repairs shall be maintained and produced for inspection by the Engineer-in-Charge or hospital authorities as and when required. | - | - | - | - |
| 1.07 | The contract shall be valid for a period of 24 months, and the contractor shall execute all works in accordance with CPWD specifications, standard operating procedures, and instructions issued by the Engineer-in-Charge from time to time. Any other work incidental to operation and maintenance of the oxygen plant system, though not specifically mentioned above but necessary for proper functioning, shall also be deemed to be included in the scope of work. | 12 | Per/Month | 39,050.84 | ₹4,68,610.08 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
GCC.pdf
Tender Documents • 4.86 MB
BOQ_208534.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .