Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹3.5 L+₹87,764.13 (25.0%)Accepted-AOC | ₹3.5 L+₹87,764.13 (25.0%) Quoted ₹4.4 L | 2 | Accepted-AOC AOC |
| 2 | 1₹3.5 LRejected-Finance | ₹3.5 L | 1 | Rejected-Finance withdraw of tender by letter |
| 3 | 3₹5.0 L+₹1.5 L (42.3%)Rejected-Finance | ₹5.0 L+₹1.5 L (42.3%) | 3 | Rejected-Finance L3 |
| 4 | 4₹5.0 L+₹1.5 L (43.8%)Rejected-Finance | ₹5.0 L+₹1.5 L (43.8%) | 4 | Rejected-Finance L4 |
| 5 | 5₹5.5 L+₹2.0 L (57.8%)Rejected-Finance | ₹5.5 L+₹2.0 L (57.8%) | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | VIJAY ARUN BANSUDE L1 | SHREE VITTHAL INFRASTRUCTURE L4 | BHARANE INFRASTRUCTURE L5 | M D PATIL CONSTRUCTION L3 | SHAMBHURAJE MAJUR SAHKARI SANSTHA L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for foundation / pipe trenches in
earth, soils of all types, sand, gravel and
soft murum, including removing the excavat
ed material upto a distance of 50 metres
and lifts as below, stacking and spreading
as directed normal dewatering preparing
thebed for foundation and excluding
bacfilling etc. complete.
MJP SSR 2023-2024 PAGE 37 ITEM NO.1
Basic Rate : 165.00
Add 5% For Sugarcane Area :8.25
Total Rate :173.25 | 1 | cum | 173.25 ₹173.25 | 183.65 ₹183.65 | 190 ₹190 | 185 ₹185 | 169.3 ₹169.3 Lowest |
| 2.00 | Excavation for foundation / pipe trenches in
hard murum, including removing the excavated
material upto a distance of 50 metres
and lifts as below, stacking and spreading
as directed normal dewatering preparing
thebed for foundation and excluding
bacfilling etc. complete.
MJP SSR 2023-2024 PAGE 37 ITEM NO.2
Basic Rate : 187.00
Add 5% For Sugarcane Area :9.35
Total Rate :196.35 | 1 | cum | 196.35 ₹196.35 | 208.13 ₹208.13 | 189.9 ₹189.9 Lowest | 205 ₹205 | 189.9 ₹189.9 Lowest |
| 3.00 | Excavation for foundation / pipe trenches in
hard murum and bulders,W.B.M. road
including removing the excavated material
upto a distance of 50 metres
and lifts as below, stacking and spreading
as directed normal dewatering preparing
thebed for foundation and excluding
backfilling etc. complete.
MJP SSR 2023-2024 PAGE 37 ITEM NO.3
Basic Rate : 211.00
Add 5% For Sugarcane Area :10.55
Total Rate :221.55 | 1 | cum | 221.55 ₹221.55 | 234.84 ₹234.84 | 350 ₹350 | 231 ₹231 | 212.9 ₹212.9 Lowest |
| 4.00 | Conveying materials obtained from road cutting including all lifts,laying in layers of 20cm. to 30cm. breaking clods, dressing to therequired lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of 300m. to 500m. inclusive, from the site of excavation to the site of deposition as directed.
PWD SSR 2023-24 PAGE 28 ITEM NO.2.26
Basic Rate : 393
Add 5% For Sugarcane Area :19.65
Total Rate :412.65 | 1 | cum | 412.65 ₹412.65 | 437.41 ₹437.41 | 450 ₹450 | 450 ₹450 | 399.2 ₹399.2 Lowest |
| 5.00 | Filling in plinth and floors/trenches murum bedding in trenches with approved murum from excavated material from foundation in 15 cm to 20cm layers including watering and compaction complete. MJP SSR 2023-2024 PAGE 41 ITEM NO.16 Basic Rate : 92 Add 5% For Sugarcane Area : =4.6 Total Rate :96.6 | 1 | cum | 96.6 ₹96.6 | 102.4 ₹102.4 | 102 ₹102 | 100 ₹100 | 96.1 ₹96.1 Lowest |
| 6.00Providing ISI standerd R.C.C. Pipes in standard lengths of following class & diameter suitbale for either coller joints or rubber ring joints, including all statuary duties and taxes such as GST stacking etc. complete. (IS 458-1988)leived by GOI and GOM in all respect, ,inspectioncharges, transport to departmental stores/site, unloading and stacking, etc.completeIS -458/1988Notes1)One collar should be supplied with eachfull length plain ended RCC pipe,cost includedin rates below.2)One rubber ring should be supplied with each full length plain ended RCC pipe,cost included in rates below. | ||||||||
| 7.00 | For class of N.P.II 300 mm dia.(2. m lentgh) MJP SSR 2023-2024 PAGE 115 ITEM NO.D vii Basic Rate : 650 | 1 | rmt | 650 ₹650 | 689 ₹689 | 950 ₹950 | 680 ₹680 | 635 ₹635 Lowest |
| 8.00 | For class of N.P.II 450 mm dia.(2.50 m lentgh).MJP SSR2023-2024 PAGE 115 Itemno. 1.D.X Basic Rate : 1232 | 1 | rmt | 1,232 ₹1,232 | 1,305 ₹1,305 | 1,400 ₹1,400 | 1,285 ₹1,285 | 1,209 ₹1,209 Lowest |
| 9.00 | For class of N.P.II 600 mm dia.(2.50 m lentgh) MJP SSR 2023-2024 PAGE 115 Itemno. 1.D.XII Basic Rate : 1666 | 1 | rmt | 1,500 ₹1,500 Lowest | 1,766 ₹1,766 | 1,900 ₹1,900 | 1,750 ₹1,750 | 1,612 ₹1,612 |
| 10.00 | For class of N.P.II 900 mm dia.(2.5 m lentgh)MJP SSR2023-2024 PAGE 115 Itemno.1.D.XV Basic Rate : 3194 | 1 | rmt | 2,800 ₹2,800 Lowest | 3,386 ₹3,386 | 3,500 ₹3,500 | 3,350 ₹3,350 | 3,099 ₹3,099 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
12 Mar 2026, 5:00 pmClosed
Chief Officer
Indapur Municipal Council
Proposed Annual Tender for Yr. 2026-27 For Drainage Repairing work For Indapur Municipal Council Indapur Dist Pune
2026_DMA_1284207_1
IMC/Health/1/2026-27
Open Tender
Sanitory Works
Item Rate
365 days
Indapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
₹25,000
29 Jul 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation / pipe trenches in
earth, soils of all types, sand, gravel and
soft murum, including removing the excavat
ed material upto a distance of 50 metres
and lifts as below, stacking and spreading
as directed normal dewatering preparing
thebed for foundation and excluding
bacfilling etc. complete.
MJP SSR 2023-2024 PAGE 37 ITEM NO.1
Basic Rate : 165.00
Add 5% For Sugarcane Area :8.25
Total Rate :173.25 | - | cum | 173.25 | - |
| 2 | Excavation for foundation / pipe trenches in
hard murum, including removing the excavated
material upto a distance of 50 metres
and lifts as below, stacking and spreading
as directed normal dewatering preparing
thebed for foundation and excluding
bacfilling etc. complete.
MJP SSR 2023-2024 PAGE 37 ITEM NO.2
Basic Rate : 187.00
Add 5% For Sugarcane Area :9.35
Total Rate :196.35 | - | cum | 196.35 | - |
| 3 | Excavation for foundation / pipe trenches in
hard murum and bulders,W.B.M. road
including removing the excavated material
upto a distance of 50 metres
and lifts as below, stacking and spreading
as directed normal dewatering preparing
thebed for foundation and excluding
backfilling etc. complete.
MJP SSR 2023-2024 PAGE 37 ITEM NO.3
Basic Rate : 211.00
Add 5% For Sugarcane Area :10.55
Total Rate :221.55 | - | cum | 221.55 | - |
| 4 | Conveying materials obtained from road cutting including all lifts,laying in layers of 20cm. to 30cm. breaking clods, dressing to therequired lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of 300m. to 500m. inclusive, from the site of excavation to the site of deposition as directed.
PWD SSR 2023-24 PAGE 28 ITEM NO.2.26
Basic Rate : 393
Add 5% For Sugarcane Area :19.65
Total Rate :412.65 | - | cum | 412.65 | - |
| 5 | Filling in plinth and floors/trenches murum bedding in trenches with approved murum from excavated material from foundation in 15 cm to 20cm layers including watering and compaction complete. MJP SSR 2023-2024 PAGE 41 ITEM NO.16 Basic Rate : 92 Add 5% For Sugarcane Area : =4.6 Total Rate :96.6 | - | cum | 96.6 | - |
| 6 | Providing ISI standerd R.C.C. Pipes in standard lengths of following class & diameter suitbale for either coller joints or rubber ring joints, including all statuary duties and taxes such as GST stacking etc. complete. (IS 458-1988)leived by GOI and GOM in all respect, ,inspectioncharges, transport to departmental stores/site, unloading and stacking, etc.completeIS -458/1988Notes1)One collar should be supplied with eachfull length plain ended RCC pipe,cost includedin rates below.2)One rubber ring should be supplied with each full length plain ended RCC pipe,cost included in rates below. | - | - | - | - |
| 7 | For class of N.P.II 300 mm dia.(2. m lentgh) MJP SSR 2023-2024 PAGE 115 ITEM NO.D vii Basic Rate : 650 | - | rmt | 650 | - |
| 8 | For class of N.P.II 450 mm dia.(2.50 m lentgh).MJP SSR2023-2024 PAGE 115 Itemno. 1.D.X Basic Rate : 1232 | - | rmt | 1,232 | - |
| 9 | For class of N.P.II 600 mm dia.(2.50 m lentgh) MJP SSR 2023-2024 PAGE 115 Itemno. 1.D.XII Basic Rate : 1666 | - | rmt | 1,666 | - |
| 10 | For class of N.P.II 900 mm dia.(2.5 m lentgh)MJP SSR2023-2024 PAGE 115 Itemno.1.D.XV Basic Rate : 3194 | - | rmt | 3,194 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
TenderDocDRAINAGE.pdf
Tender Documents • 1.62 MB
BOQ_2208514.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .