Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | -46.66% | ₹4.2 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 L+₹28,098.83 (6.62%)Admitted-Finance | -43.13% | ₹4.5 L+₹28,098.83 (6.62%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 L+₹36,138.43 (8.51%)Admitted-Finance | -42.12% | ₹4.6 L+₹36,138.43 (8.51%) | L3 | Admitted-Finance |
| 4 | L4₹5.2 L+₹98,067.28 (23.1%)Admitted-Finance | -34.34% | ₹5.2 L+₹98,067.28 (23.1%) | L4 | Admitted-Finance |
| 5 | L5₹5.6 L+₹1.3 L (31.2%)Admitted-Finance | -30.00% | ₹5.6 L+₹1.3 L (31.2%) | L5 | Admitted-Finance |
Tender Value
₹8.0 L
EMD Value
₹15,920
Closing Date
20 Aug 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_320339_7
e-NIT No. 61 of REW Poonch 2026-27 Dated 10-08-2026
Open Tender
Civil Works
Percentage
40 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer REW Division Poonch
₹15,920
16 Sept 2026
10 Aug 2026
21 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge.
All kinds of soil : 50%
Ordinary Rock 30%
Hard Rock 20% | - | cum | 437.24 | - |
| 2 | Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm | - | cum | 1,204.15 | - |
| 3 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3
wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | - | cum | 768.15 | - |
| 4 | Supplying and stacking at site Good Earth | - | cum | 281.3 | - |
| 5 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe | - | Rmt | 2,415.8 | - |
| 6 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 900 mm dia. R.C.C. pipe | - | Rmt | 3,951.65 | - |
| 7 | Carriage of HP Pipe 600 mm dia by 90 km by mt | - | Rmt | 430 | - |
| 8 | Carriage of HP Pipe 900 mm dia by 90 km by mt | - | Rmt | 646.15 | - |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | - | cum | 479.3 | - |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.25 | cum | 4,826.5 | ₹10,859.63 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_1064702.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .