Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹21.6 L
Closing Date
11 Nov 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
Worley on behalf of Ms Hindustan Petroleum Corporation Limited (HPCL) invites bids through e-tendering
20000300-HD-10120
20000300-HD-10120
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
₹21.6 L
11 Nov 2020
21 Oct 2020
11 Nov 2020
11 Nov 2020
21 Oct 2020 - 29 Oct 2020
28 Oct 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | PIDS System-Karnataka State | PIDS System-Karnataka State — Project management, Design, Engineering, Manufacturing, Supply of all related goods and material, Inspection, Factory Acceptance Testing, Packaging, forwarding, Insurance, Transit Insurance, Shipping, Port Handling, Custom Clearance, Inland Transportation to store, Supply of Commissioning Spares, Loading, Unloading & Handling, Storage & Safe custody, Transportation from store to site, Supply of all types of Erection Items,3 year warranty, Documentation of "PIDS Controller" as per Specification of PIDS system Doc no.15963-000-TE-SPC-0004.(Karnataka State)Single or Dual Channel PIDS Controller with maximum 40Km on each channel of controller to cover 191.372Km (From Pipeline Chainage 0.00 Km to 191.372 Km) throughout Hassan Cherlapalli Pipeline along with Air-conditioned Cabinet (600 (W) x 800 (D) x 15RU (H)), Redundant Servers, Routers, Data Management Software along with licenses for PIDS Monitoring, pigtails, and patch cords. 1.The PIDS architecture shall be server-client based or distributed type.2.The Controller/Workstation/Server shall be provided with 8 Port 10/100/1000 Mbps Switch.No Additional cost shall be provided for the same3.PIDS System shall be interfaced with SDH back bone system for exchange of communication. No Additional cost shall be provided for the same4.PIDS shall also be interfaced with third-party system like SCADA, STS, SMS, Email/SMS Gateway/SMTP Server and Large Video Wall.No Additional cost shall be provided for the same5. Bidder shall include the cost of commissioning spare in this line item. 6. Bidder to consider Floor mount cabinets as necessary to install switches and routers if the same is not in controller locations. | - | Lump Sum |
| 2 | PIDS System-Andhra State | PIDS System-Andhra State — Project management, Design, Engineering, Manufacturing, Supply of all related goods and material, Inspection, Factory Acceptance Testing, Packaging, forwarding, Insurance, Transit Insurance, Shipping, Port Handling, Custom Clearance, Inland Transportation to store, Supply of Commissioning Spares, Loading, Unloading & Handling, Storage & Safe custody, Transportation from store to site, Supply of all types of Erection Items,3 year warranty, Documentation of "PIDS Controller" as per Specification pf PIDS system Doc no. 15963-000-TE-SPC-0004. (Andhra Pradesh State)Single or Dual Channel PIDS Controller with maximum 40Km on each channel of controller to cover 237.748 Km (From Pipeline Chainage 191.372 Km to 429.120 KM) throughout Hassan Cherlapalli Pipeline along with Air-conditioned Cabinet (600 (W) x 800 (D) x 15RU (H)), Redundant Servers, Routers, Data Management Software along with licenses for PIDS Monitoring, pigtails, and patch cords. 1.The PIDS architecture shall be server-client based or distributed type.2.The Controller/Workstation/Server shall be provided with 8 Port 10/100/1000 Mbps Switch. No Additional cost shall be provided for the same3.PIDS System shall be interfaced with SDH back bone system for exchange of communication. No Additional cost shall be provided for the same4.PIDS shall also be interfaced with third-party system like SCADA, STS, SMS, Email/SMS Gateway/SMTP Server and Large Video Wall. No Additional cost shall be provided for the same5. Bidder shall include the cost of commissioning spare in this line item. 6. Bidder to consider Floor mount cabinets as necessary to install switches and routers if the same is not in controller locations. | - | Lump Sum |
| 3 | PIDS System- Telangana State | PIDS System- Telangana State — Project management, Design, Engineering, Manufacturing, Supply of all related goods and material, Inspection, Factory Acceptance Testing, Packaging, forwarding, Insurance, Transit Insurance, Shipping, Port Handling, Custom Clearance, Inland Transportation to store, Supply of Commissioning Spares, Loading, Unloading & Handling, Storage & Safe custody, Transportation from store to site, Supply of all types of Erection Items,3 year warranty, Documentation of "PIDS Controller" as per Specification pf PIDS system Doc no. 15963-000-TE-SPC-0004. (Telangana State)Single or Dual Channel PIDS Controller with maximum 40Km on each channel of controller to cover 223.17 Km (From Pipeline Chainage 429.120 Km to 652.290 Km) throughout Hassan Cherlapalli Pipeline along with Air-conditioned Cabinet (600 (W) x 800 (D) x 15RU (H)), Redundant Servers, Routers, Data Management Software along with licenses for PIDS Monitoring, pigtails, and patch cords. 1.The PIDS architecture shall be server-client based or distributed type.2.The Controller/Workstation/Server shall be provided with 8 Port 10/100/1000 Mbps Switch. No Additional cost shall be provided for the same3.PIDS System shall be interfaced with SDH back bone system for exchange of communication. No Additional cost shall be provided for the same4.PIDS shall also be interfaced with third-party system like SCADA, STS, SMS, Email/SMS Gateway/SMTP Server and Large Video Wall. No Additional cost shall be provided for the same5. Bidder shall include the cost of commissioning spare in this line item. 6. Bidder to consider Floor mount cabinets as necessary to install switches and routers if the same is not in controller locations. 4 PIDS Client 12800-HASSAN CHERLAPALLY Each 4 29AAACH1 Yes PIPELINE 118B1Z8 Project management, Design, Engineering, Manufacturing, Supply of all related goods and material, Inspection, Factory Acceptance Testing, Packaging, forwarding, Insurance, Transit Insurance, Shipping, Port Handling, Custom Clearance, Inland Transportation to store, Supply of Commissioning Spares, Loading, Unloading & Handling, Storage & Safe custody, Transportation from store to site, Supply of all types of Erection Items,3 year warranty, Documentation of "PIDS Client" as per Specification pf PIDS system Doc no. 15963-000-TE-SPC-0004.Client Workstation with hardware and software (Windows and application) along with 55" Monitor and Client License.Note:1. Client workstation at Mangalore shall be able to monitor entire section of HCPL along with alarms. | - | Lump Sum |
| 5 | Install &Comm-Karnataka State | Install &Comm-Karnataka State — Site work, installation, panel erection, shifting to site, integration, OTDR/Fiber testing & Fiber selection of OFC for the given stretch, site testing, trial run commissioning, handover, minor civil works, training, supply of all accessories, racks, interfacings, installation materials, connectors, cables, trenching & backfilling as required, cable trays, SPD, double pole MCBs, power supply converters, OFC connectors, patch cords, pigtails, cable management, Cable tails, earthing, junction boxes, mounting arrangements for PIDS modules complete in all aspects, integration of all services and cross connections with pipeline telecommunication system, Installation, commissioning, integration with SCADA,,STS, Email/SMS gateway/SMTP, identification of the fault, rectification, final testing, customization & Tuning of the system after commissioning of complete system, system Stabilization for 60 days, Trial Run for 30 days, maintenance with Site Resident Support Service Engineer till handing over of the project, free maintenance services of system during warranty period, minor civil works, documentation, and all other items / work not indicated here but required for completion of the scope of work. The scope also includes providing 60 months post warranty Comprehensive AMC of the installed system with services of one Resident Engineer apart from emergency and remote support complete in all respect and shall be executed as Turnkey individual work contract basis as per job specification mentioned in this document.All site work, installation, commissioning, integration of installed services, SAT and handover, stabilization, trial run, warranty, as defined above for HCPL, Pumping and Pigging stations, Pigging cum Tap-off stations, Intermediate Pigging Stations, SV Stations and Receiving Station., manned and unmanned stations complete in all respect for PIDS Controllers, NMS, Servers, Client Workstations, switches, Routers, converters, etc. and all other related activities as mentioned above for all locations in HCPL.(Karnataka State)Note 1 : Bidder to quote installation and commissioning as per specification for Mangalore, Neriya, Hassan SV-1 to SV-9 and Hiriyur in this line item. (From Pipeline Chainage 0 Km to 191.372 Km) | - | Lump Sum |
| 6 | Install &Comm-Andhra State | Install &Comm-Andhra State — Site work, installation, panel erection, shifting to site, integration, OTDR/Fiber testing & Fiber selection of OFC for the given stretch, site testing, trial run commissioning, handover, minor civil works, training, supply of all accessories, racks, interfacings, installation materials, connectors, cables, trenching & backfilling as required, cable trays, SPD, double pole MCBs, power supply converters, OFC connectors, patch cords, pigtails, cable management, Cable tails, earthing, junction boxes, mounting arrangements for PIDS modules complete in all aspects, integration of all services and cross connections with pipeline telecommunication system, Installation, commissioning, integration with SCADA,,STS, Email/SMS gateway/SMTP, identification of the fault, rectification, final testing, customization & Tuning of the system after commissioning of complete system, system Stabilization for 60 days, Trial Run for 30 days, maintenance with Site Resident Support Service Engineer till handing over of the project, free maintenance services of system during warranty period, minor civil works, documentation, and all other items / work not indicated here but required for completion of the scope of work. The scope also includes providing 60 months post warranty Comprehensive AMC of the installed system with services of one Resident Engineer apart from emergency and remote support complete in all respect and shall be executed as Turnkey individual work contract basis as per job specification mentioned in this document.All site work, installation, commissioning, integration of installed services, SAT and handover, stabilization, trial run, warranty, as defined above for HCPL, Pumping and Pigging stations, Pigging cum Tap-off stations, Intermediate Pigging Stations, SV Stations and Receiving Station., manned and unmanned stations complete in all respect for PIDS Controllers, NMS, Servers, Client Workstations, switches, Routers, converters, etc. and all other related activities as mentioned above for all locations in HCPL.(Andhra Pradesh State)Note 1 : Bidder to quote installation and commissioning as per specification for SV-10 to SV-21 including Anantapur and Kurnool in this line item.(From Pipeline Chainage 191.372 Km to 429.120 KM) | - | Lump Sum |
| 7 | Install &Comm-Telangana State | Install &Comm-Telangana State — Site work, installation, panel erection, shifting to site, integration, OTDR/Fiber testing & Fiber selection of OFC for the given stretch, site testing, trial run commissioning, handover, minor civil works, training, supply of all accessories, racks, interfacings, installation materials, connectors, cables, trenching & backfilling as required, cable trays, SPD, double pole MCBs, power supply converters, OFC connectors, patch cords, pigtails, cable management, Cable tails, earthing, junction boxes, mounting arrangements for PIDS modules complete in all aspects, integration of all services and cross connections with pipeline telecommunication system, Installation, commissioning, integration with SCADA,,STS, Email/SMS gateway/SMTP, identification of the fault, rectification, final testing, customization & Tuning of the system after commissioning of complete system, system Stabilization for 60 days, Trial Run for 30 days, maintenance with Site Resident Support Service Engineer till handing over of the project, free maintenance services of system during warranty period, minor civil works, documentation, and all other items / work not indicated here but required for completion of the scope of work. The scope also includes providing 60 months post warranty Comprehensive AMC of the installed system with services of one Resident Engineer apart from emergency and remote support complete in all respect and shall be executed as Turnkey individual work contract basis as per job specification mentioned in this document.All site work, installation, commissioning, integration of installed services, SAT and handover, stabilization, trial run, warranty, as defined above for HCPL, Pumping and Pigging stations, Pigging cum Tap-off stations, Intermediate Pigging Stations, SV Stations and Receiving Station., manned and unmanned stations complete in all respect for PIDS Controllers, NMS, Servers, Client Workstations, switches, Routers, converters, etc. and all other related activities as mentioned above for all locations in HCPL.(Telangana State)Note 1 : Bidder to quote installation and commissioning as per specification for SV-22 to SV- 35 including Wanaparthy, Thimmapur TOP and Cherlapally in this line item. (From Pipeline Chainage 429.120 Km to 652.290 Km) | - | Lump Sum |
| 8 | Training-Karnataka State | Training-Karnataka State — Training for PIDS system for HPCL personnel as per specification (Karnataka State) | - | Lump Sum |
| 9 | Training-Andhra Pradesh State | Training-Andhra Pradesh State — Training for PIDS system for HPCL personnel as per specification.(Andhra Pradesh State) | - | Lump Sum |
| 10 | Training- Telangana State | Training- Telangana State — Training for PIDS system for HPCL personnel as per specification(Telangana State) | - | Lump Sum |
| 11 | PWMC-1st Year-Karnataka State 12801-HCPL HASSAN | PWMC-1st Year-Karnataka State 12801-HCPL HASSAN — Post warranty maintenance contract (comprehensive) as per specification. (Price shall be valid for the duration of 05 years post warranty and limited to newly supplied and installed system HCPL PIDS system. If bidder is not OEM then OEM along with bidder shall jointly provide signed and stamped agreements for post warranty maintenance). (Karnataka State)Comprehensive PWMC for first year after completion of warranty. (Karnataka State)Note 1 : Bidder to PWMC charges per specification for Mangalore, Neriya, Hassan SV-1 to SV-9 and Hiriyur in this line item. | - | Lump Sum |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000300-HD-10120.pdf
TENDER_DOCUMENT • 40.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .