| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.9 L+₹4,752.81 (1.66%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RATHINAM BALAMURUGAN L2 | MANIKANDAN N L1 |
|---|---|---|---|---|---|
| 1.00Name Of Work :Special Repair of NH 208 to A.Paraipatti Road (Via Jariusilampatti )Road km 0/0-1/540(R76) VPR | |||||
| 2.00 | Clearing the Light jungle including all labour charges for burying and burning etc., complete. | 554.4 | sqm | 6.36 ₹3,525.98 Lowest | 6.36 ₹3,525.98 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B | 277.2 | cum | 140.45 ₹38,932.74 Lowest | 140.45 ₹38,932.74 Lowest |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 4.48 | cum | 2,591.87 ₹11,611.58 Lowest | 2,591.87 ₹11,611.58 Lowest |
| 5.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 36.55 | sqm | 4,010.04 ₹1,46,566.96 Lowest | 4,010.04 ₹1,46,566.96 Lowest |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10sqm over the WMM surface preparatory to another bituminous construction over it | 44.8 | sqm | 84.47 ₹3,784.26 Lowest | 84.47 ₹3,784.26 Lowest |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 44.8 | sqm | 19.44 ₹870.91 Lowest | 19.44 ₹870.91 Lowest |
| 8.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 731 | sqm | 38 ₹27,778 | 32.49 ₹23,750.19 Lowest |
| 9.00 | Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects | 1.12 | cum | 11,502.21 ₹12,882.48 Lowest | 11,502.21 ₹12,882.48 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 44,272 ₹44,272 | 43,547 ₹43,547 Lowest |
Tender Value
₹2.9 L
Closing Date
29 Oct 2025, 3:00 pmClosed
BDO
T.Kallupatti
NH 208 to A.Paraipatti Road (via jariusilampatti ) Km 0/0-1/540 R- 76 at T.Kallupatti Block
2025_RDTN_617449_1
09/ TKPY / SPECIAL REPAIR - BP ( 2025-2026 )
Open Tender
Civil Works - Roads
Item Rate
t.kallupatti
Class III
2 documents required · 2 mandatory
₹0
Exempted
31 Oct 2025
26 Oct 2025
29 Oct 2025
26 Oct 2025
29 Oct 2025
26 Oct 2025
Amount
Clearing the Light jungle including all labour charges for burying and burning etc., complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10sqm over the WMM surface preparatory to another bituminous construction over it
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RATHINAM BALAMURUGAN (BID ID -1498862)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_737895.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .