Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC TIRUPPUR | KALLAKURICHI | TAMIL NADU | 605702 | 1 | Accepted-AOC Bidder Quoted value Less than the estimate rate | |
| 2 | 2₹4.9 L+₹17,069 (3.62%)Rejected-Finance TIRUPPUR | PUDUKKOTTAI | TAMIL NADU | 621308 | 2 | Rejected-Finance Bidder Quoted value more than the estimate rate | |
| 3 | 3₹4.9 L+₹14,476 (3.07%)Rejected-Finance 68A MOOLAKKOUNDANPUTHUR KANGEYAM TALUK TIRUPPUR 638 105 | TIRUPPUR | TAMIL NADU | 638105 | 3 | Rejected-Finance Bidder Quoted value more than the estimate rate | |
| 4 | 4₹4.9 L+₹19,352 (4.11%)Rejected-Finance 2 914 A9 8 641 687 | TIRUPPUR | TAMIL NADU | 641687 | 4 | Rejected-Finance Bidder Quoted value more than the estimate rate |
| Sl No | Description | Qty | Unit | K.VIJAYAKUMAR L2 | A Rajesh Kumar L4 | S.R.P AND CO L3 | Meena Construction L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 64 | 1 M³ | 92 ₹5,888 | 95 ₹6,080 | 95 ₹6,080 | 75 ₹4,800 Lowest |
| 2.00 | Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 32 | 1 M³ | 5,411 ₹1,73,152 | 5,500 ₹1,76,000 | 5,450 ₹1,74,400 | 5,125 ₹1,64,000 Lowest |
| 3.00 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | 32 | 1 M³ | 7,029 ₹2,24,928 | 7,050 ₹2,25,600 | 7,050 ₹2,25,600 | 7,000 ₹2,24,000 Lowest |
| 4.00 | Conveyance of excavated earth from work site to 0-5 km distance as per standard specification | 39 | 1 M³ | 103 ₹4,017 | 110 ₹4,290 | 105 ₹4,095 | 80 ₹3,120 Lowest |
| 5.00 | Supply and fixing of bitumen pad of 12mm thick, cost includes loading, unloading, transportation, cutting, fixing in position etc, complete as per standard specification. | 7 | 1 M² | 479 ₹3,353 | 500 ₹3,500 | 480 ₹3,360 | 450 ₹3,150 Lowest |
| 6.00Add G.S.T. @ 18% | |||||||
Tender Value
₹5.0 L
EMD Value
₹9,900
Closing Date
6 Feb 2026, 3:00 pmClosed
Commissioner
Tiruppur City Municipal Corporation Office, Tiruppur
Providing of CC Pavement at NGR nagar 2nd street in ward no.35
2026_MAWS_645651_1
E1/2413/2025
Open Tender
Civil Works - Roads
Works
90 days
Tiruppur City Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,900
21 Feb 2026
22 Jan 2026
6 Feb 2026
22 Jan 2026
6 Feb 2026
22 Jan 2026
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement
Conveyance of excavated earth from work site to 0-5 km distance as per standard specification
Supply and fixing of bitumen pad of 12mm thick, cost includes loading, unloading, transportation, cutting, fixing in position etc, complete as per standard specification.
Add G.S.T. @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
01_Conditions.pdf
Tender Documents • 1.04 MB
BOQ_773860.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .