GEMC-511687783804540
Awarded to PAB ENGINEERING WORKS PRIVATE LIMITED
₹50.4 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| 2nd intermediate shaft part No42_55 | BTL EPC / 55 KW | 84313910 | 2 Nos | 25,969.44 | 51,938.88 |
| Plummer block with bushing for drive drum part NoG 07A_800 | BTL EPC / 55 KW | 84313910 | 2 Nos | 355,289.45 | 710,578.9 |
| Output shaft part No55_55 | BTL EPC / 55 KW | 84313910 | 2 Nos | 52,208.98 | 104,417.96 |
| 2nd stage pinion and gear in set part No35 and36 | BTL EPC / 55 KW | 84313910 | 2 Set | 458,415.13 | 916,830.26 |
| Input shaft with integrated pinion and 1st stage gear part No61 and 26 | BTL EPC / 55 KW | 84313910 | 4 Nos | 286,844.61 | 1,147,378.44 |
| 3rd stage pinion and gear in set part No46 and47 | BTL EPC / 55 KW | 84313910 | 1 Set | 796,981.79 | 796,981.79 |
| 2nd stage intermediate shaft bushing part No41 | BTL EPC / 55 KW | 84313910 | 2 Nos | 99,136.11 | 198,272.22 |
| Equalising gear in set of 2 nos part NoG_06 | BTL EPC / 55 KW | 84313910 | 2 Set | 553,447.67 | 1,106,895.34 |
| 2nd Intermediate shaft bearing cover part No38 | BTL EPC / 55 KW | 84313910 | 2 Nos | 3,963.56 | 7,927.12 |