Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹2,716
Closing Date
5 Aug 2026, 6:00 pm
xen rew udhampur
xen rew udhampur
BOQ
2026_RDPR_316868_8
e-NIT No. 65 REW UDHAMPUR of 2026-27 Dated 20-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
NIT
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹2,716
21 Jul 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 7 | cum | 479.3 | ₹3,355.1 |
| 2 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 2.82 | cum | 4,826.5 | ₹13,610.73 |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 8.43 | cum | 2,793.5 | ₹23,549.2 |
| 4 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 5.18 | cum | 5,402.9 | ₹27,987.02 |
| 5 | Providing and laying in position cement concrete of specified grade with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) | 4.8 | cum | 5,733.6 | ₹27,521.28 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns | 55 | Sqm | 286.35 | ₹15,749.25 |
| 7 | P/L Dry stone Soling laid horizontally. | 8.5 | Sqm | 1,255.35 | ₹10,670.47 |
| 8 | Carriage of Sand 75km mt | 5.5 | Cum | 961.94 | ₹5,290.67 |
| 9 | Carriage of Aggregates 12km mt | 9.8 | Cum | 305.22 | ₹2,991.16 |
| 10 | Carriage of stones 8km | 14.2 | no. | 291.45 | ₹4,138.59 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1035742.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].