| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance | ₹1.4 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.6 CrAccepted-Finance | ₹1.6 Cr | L2 | Accepted-Finance Accepted |
| 3 | L3₹1.9 CrAccepted-Finance | ₹1.9 Cr | L3 | Accepted-Finance Accepted |
| 4 | Not Admitted-Fee/PreQual/Technical 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Matching |
| Sl No | Description | Qty | Unit | GOLDEN CONSTRUCTIONS L2 | TRadhakrishnanandco L3 | M/s A.Chelladurai & Co L1 |
|---|---|---|---|---|---|---|
| 1.00 | CONTROL ROOM BUILDING - Clearing juliflora jungle with uprooting including all labour lead lift etc., complete. | 280 | sqm | 1 ₹280 | 7 ₹1,960 | 5 ₹1,400 |
| 2.00 | Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. | 140.69 | cum | 200 ₹28,138 | 250 ₹35,172.50 | 150 ₹21,103.50 |
| 3.00 | Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. | 105.51 | cum | 300 ₹31,653 | 350 ₹36,928.50 | 300 ₹31,653 |
| 4.00 | Earthwork excavation in medium rock and dense medium rock requiring blasting. (As instructed by the Engineer at site) | 105.51 | cum | 300 ₹31,653 | 750 ₹79,132.50 | 300 ₹31,653 |
| 5.00 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. (As instructed by the Engineer at site) | 42.09 | cum | 1,500 ₹63,135 | 1,800 ₹75,762 | 1,300 ₹54,717 |
| 6.00 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing, etc., complete. | 30 | cum | 5,100 ₹1.5 L | 6,000 ₹1.8 L | 5,000 ₹1.5 L |
| 7.00 | PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing, etc., complete. | 3 | cum | 5,500 ₹16,500 | 7,000 ₹21,000 | 5,000 ₹15,000 |
| 8.00 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete | 68 | cum | 7,900 ₹5.4 L | 9,500 ₹6.5 L | 7,000 ₹4.8 L |
| 9.00 | RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Column up to Basement | 5 | cum | 24,000 ₹1.2 L | 16,000 ₹80,000 | 16,000 ₹80,000 |
| 10.00 | RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Grade Beam | 14 | cum | 15,000 ₹2.1 L | 16,000 ₹2.2 L | 13,000 ₹1.8 L |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
13 Oct 2025, 2:00 pmClosed
CE/D/Coimbatore
O/O Chief Engineer/ Distribution/Tatabad/ Coimbatore - 641 012
Construction of control room and other allied civil works for the proposed Kathankanni 33/11 KV SS in Palladam EDC on total turnkey basis.
2025_EB_607918_1
CE/D/CBE/C-03/2025-26
Open Tender
Civil Works
270 days
Kathankanni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.7 L
Yes
Coimbatore
23 Dec 2025
26 Sept 2025
14 Oct 2025
26 Sept 2025
13 Oct 2025
4 Oct 2025
26 Sept 2025 - 29 Sept 2025
30 Sept 2025
Amount
CONTROL ROOM BUILDING - Clearing juliflora jungle with uprooting including all labour lead lift etc., complete.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete.
Earthwork excavation in medium rock and dense medium rock requiring blasting. (As instructed by the Engineer at site)
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. (As instructed by the Engineer at site)
PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing, etc., complete.
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete
RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Column up to Basement
RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Grade Beam
RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Column Above Basement
RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Plinth Beam
RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Lintel Beam
RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Sun Shade
RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete with centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. Roof Beam
Brickwork in CM 1:5 mix using II class chamber bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete. Basement
Brickwork in CM 1:5 mix using II class chamber bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete. Super Structure
Flooring with PCC 1:3:6 mix using 40 mm HBS metal for flooring 150mm thick (machine crushed metal) including cost of all materials labour lead, lift, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for Control Room flooring concrete 100 mm thick with formwork including cost of all materials, labour lead, lift, etc., complete. but excluding cost of steel reinforcement
RCC1:1 1/2:3 using 12mm to 20 mm HBS metal (machine crushed) for roof slab concrete of 130 mm thick with formwork including cost of all materials, labour, lead, lift, centring shuttering , curing, etc., complete. But excluding cost of steel reinforcement. (Ground roof slab)
Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, labour, lead, lift, etc., complete.
Plastering with CM. 1:3 mix 12 mm thick for fol, bath, RCC pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete.
White washing two coats with White cement approved quality over a primary coat for ceiling, exposed surfaces of wall, beam, slab, sunshade, lintel, etc, including cost of all materials, lead, lift, etc, complete.
Colour washing two coats with Exterior Plastic Emulsion paint over one coat of Plastic Emulsion primer for outside wall including cost of all materials, labour, lead, lift, etc., complete.
Colour washing two coats with Plastic Emulsion paint over one coat of Plastic Emulsion primer for inside wall including necessary plaster of parrys two coats cost of all materials, labour, lead, lift, etc., complete.
Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals.
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work. (As instructed by the Engineer at site)
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Louvered Ventilators of from the profile the size of outer frame 60mm x 58mm and shutter profile size of 60 x 78mm both profiles are reinforced with GI/1mm 125GSM and 100% corrosion free, the profile are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with all over the edges of frame and shutter. The corners and joints should be welded and cleaned. Radiations pin headed glass 4mm thick should be provided in the louvers. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The ventilator should be got approved from the Executive Engineer before use on work.
M&F in position of PVC door shutter made of Single Panel laminated Plastic section and PVC extracted shutter frame of size 24 x 60 mm including cost of 3 nos 85 mm butt hinges for single leaf door of size 0.80 x 2.00 m with 2 No aluminium handle and 2 nos 150 x 2 mm aluminium towel bolt hinges etc., complete.
Supplying and fixing of two side polished 20-30mm tk.cuddapah slab for cupboard, kitchen platform etc., including cost of all materials, labour, lead, lift, etc., complete
Dadooing with glazed tiles of best approved quality of make johnson, neycer etc, over CM 1:3, 12mm thick including cost of all materials, labour, lead, lift, etc., complete.
Flooring with approved Vitrified tiles 600x600mm of approved Quality, design & colour (Johnson or equivalent make)laid in cement mortar 1:3 - 20mm thick including pointing with same coloured cement using 0.4kg/sqm, finishing the joints, including cost of all materials, water charges,labour, lead, lift, etc. complete.
Flooring with approved acid proof tiles over cement mortor 1:3 20mm thick in floor including pointing with white cement finishing the joints flush pointing the surface etc including cost of all materials, water charges labour, lead, lift, etc. complete.(Battery Room)
Providing weathering course with PCC 1:2:4 using 6-10 mm HBGS of a average thickness of 7.5 cm with water proofing compound and finishing the top with solar reflective tiles over cement mortar 1:3 mix bed, 20mm tk including cost of all materials, pointing, labour, curing, finishing with proper slope, lead, lift, etc., complete.
Supplying and fixing in position of GI angle 50x50x6mm @ 75cm c/c to the required length for supporting the cable in the duct, as per the direction of site Engineer including cost of all materials, lead, lifts, and cutting the GI angle required length and labour for fixing etc., complete.
Supplying and fixing in position of MS channel 110 x 50mm required length for fixing the cable duct side wall, as per the direction of site Engineer including cost of all materials, lead, lifts, and cutting the MS channel required length and labour for fixing etc., complete.
Supplying and laying PVC pipe 110 mm outer die 6kg / cm2 ISI make for laying the Sewer line including cost of pvc pipe coupling labour for cutting laying fixing tightening etc. including earth work excavation and refilling trench etc complete-110mm dia PVC pipe
Supplying and laying PVC pipe 110 mm outer die 6kg / cm2 ISI make for laying the Sewer line including cost of pvc pipe coupling labour for cutting laying fixing tightening etc. including earth work excavation and refilling trench etc complete- 110mm dia PVC Bend
Supplying and laying PVC pipe 110 mm outer die 6kg / cm2 ISI make for laying the Sewer line including cost of pvc pipe coupling labour for cutting laying fixing tightening etc. including earth work excavation and refilling trench etc complete-110mm dia PVC TEE
Supplying and laying PVC pipe 110 mm outer die 6kg / cm2 ISI make for laying the Sewer line including cost of pvc pipe coupling labour for cutting laying fixing tightening etc. including earth work excavation and refilling trench etc complete-100mm dia PVC Cowl
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Supplying and fixing in position of 25mm dia pvc pipe of 10 kg/sq.cm pressure from the approved manufacturer apollo, chemplast, avanplast, valarmathi, usha, vimal etc., confirming to IS 4985 of 1968, 4984 of 1970 including cost of all special fixtures labour lead, lift, etc., complete.
Supplying and fixing of 1000 lit capacity sintex tank of approved quality including cost of labour for fixing etc., complete
Supplying and fixing of 15mm high quality brass Chromium plated screw down bib cock (Heavy Type) such as leader, zeolite and zenith of any other approved quality cost of all materials, labour, lead, lift, etc., complete.
Refilling with excavated soil other than sand in foundation and sides of masonry, consolidation as per std. specn. With water including all labour, lead, lifts. etc, complete.
Removing the excess earth to the basement area as instructed by field engineer including all labour lead, lift, etc., complete.
Supplying and filling of Red gravel in the basement filling stacking to the department gauge, labour for filling, watering and consolidation, including cost of all materials, lead, lifts, labour, etc, complete.
Supplying and fixing of RCCB safe trip of appd LEGRAND , ISI make , 25amps with suitable box including cost of all materials labour, lead, lift, etc., complete as per standard specification. (As instructed by the engineer at site)
Wiring with 2x1.50 sq.mm PVC unsheathed copper multistand cable of 1100 V grade in suitable pvc rigid pipe in wall or ceiling with pvc accessories with TW switch box in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earthwire connection of 14 SWG TC wire for light and Fan points.
Wiring with 2x1.5 sq.mm (22/0.3) PVC insulated SC unsheathed Cu.conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in in flush with wall, with 150mm x 100mm x 113mm TW switch box with 3 mm thick hylum sheet cover for 5 A 3 Pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC Plug point. (As instructed by the engineer at site)
Supply and fixing of 40 W LED industrial type fitting 'INDURA' (Philips /Crompton) complete with conduit pipe suspension, with PVC unsheathed copper leads from the terminals to the fittings with LED lamps. (As instructed by the engineer at site)
Wiring with 2x4 sq.mm Pvc unsheathed copper multistand cable of 1100 V grade in suitable pvc rigid pipe in wall or ceiling with pvc accessories with 150mm x 100mm x 75mm T.W switch box in flush with wall covered with 3mm tk. Hylum sheet for 15 amps 3pin flush type non interlocking C.S plug including pin top with painting of suitable colour with continuous earth wire connection of 14 SWG T.C. wire for plug point. (As instructed by the engineer at site)
Supplying and fixing of 23 cm angular holder with EI fancy shade glass with 9 W LED bulb.
Supplying and fixing of 1400mm (56") sweep AC ceiling fan with regulator with Suitable down rod on the existing clamps of crompton / rally / Orient including cost of all materials lead, lift etc., complete.
Supplying and fixing of water tight Bulk head fitting with guard (philips, bajaj, k-lite, cromption greaves) suitable for incandescent lamp with guard and 8W LED bulb.
Supplying and fixing of 375mm (15') sweep heavy duty AC Exhaust fan with MS/Fibre louvers shutters arrangements of approved ISI quality complete with necessary wall opening and making good of the wall
Supplying and fixing of digital LED Wall Clock of approved quality such as Ajantha / Seiko/ Citizen etc including transport, fixing charges etc complete.
Supply and fixing of Horizontal type 4 way triple pole neutral MCB distribution board in sheet steel enclosure with 40A 4 pole MCB isolater as incoming and 12 Nos. 6 A to 32 A SP MCB as outgoing in flush with wall and making good of the concealed portion with earth connection. The MCBDB and MCB's should be with the ISI mark
Earthing as per standard specification complete with necessary masonry work.
Providing and fixing sanitary fitting consisting of Neycer / parryware of oriya pattern Water Closet 45cm with P/S trap connecting with PVC ventilating shaft and Y bend complete, including cost of all material, labour, lead, lift, etc, complete.
Providing and fixing sanitary fitting consisting of Neycer / parryware of European Water Closet with "P" or "S" Trap with Double Flapped Seat and Seat Cover with Brass Hinges and 10 litre capacity PVC Low Level Flusing Tank with all internal fittings including cost of all material, labour, lead, lift, etc, complete.
Supplying and fixing of best quality of mirror of size 300 x450mm mirror with soap tray, towel stand, screw and fixing near the wash basin, teak wood round block, including cost of all material, labour, lead, lift, etc, complete.
Supplying and fixing 100x50mm PVC floor trap in bath room with one pvc door bend shoe of 50mm.dia including cost of all etc., complete
Supplying and fixing of wash basin of size 500x400 mm of approved quality neycer / parrys ISI including cost of wash basin with pedestal cock fixing using rag bolt and nut 15mm dia pvc connecting hose and outlet using 50mm dia pvc waste water pipe for outlet CP angle valve with all accessories including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing of approved quality of Brass Chromium plated towel rod of size 90cm and fixing the same over the teak wood round block and soap tray (pvc) in bath room including cost of all materials, lead, lift, etc., complete.
Providing PVC down fall pipe using 110mm dia 4 Kg / Sqcm, PVC pipe and pvc clamp line supreme etc., including fixing PVC washer type door bend & shoe, in correct position and connecting from the roof slab including cost of all materials, labour, transport lead, lift, etc., complete, including pvc accessories and washers.
Supply and fixing of 4' 18W Twin type mirror optic suspension type fitting (phillips/crompton/wipro) with louvers cover complete on wall/ceiling with coduit pipe suspension and PVC unsheathed Copper leads from terminal to the fitting with LED fittings.
Supply and fixing of 30W LED street light fitting with LED of make Philips/Havells/Equivalent with 25mm dia GI pipe with 1 No GI bend on wall with PVC unsheathed Copper leads from terminal to the fitting with MS clamp
Labour charges for writing Name Board/Slogans over the plastered surface wall including cost of paint & all materials, labour, lead, lift, etc., complete.
Providing anti termite treatment in 4 stages I) immediate after earth work excavation and before laying foundation concrete II) after refilling for sides of foundation III) Before laying of flooring concrete IV) outside of basement upto 1.0m alround the building including cost of all materials ,labour,lead,lift,etc., complete as per standard specification as directed by the incharge of site.
Supplying and laying PVC pipe 63 mm outer dia 6kg / cm2 ISI make for laying the sewer line including cost of pvc pipe coupling labour for cutting laying fixing tighting etc.
Supply and Run of 4 of 4 sq.mm. PVC insulated SC unsheathed FRLS copper conductor of 1100 V grade in suitable PVC rigid pipe Concealed in wall and ceiling with continuous earth wire connection by 4 sq.mm. PVC insulated SC unsheathed FRLS copper wire and making good of the concealed portion with suitable colour.
ROAD WORK - Earth work excavation in all type of soils with an initial lead of 10m and lift of 2m - In Hard Gravely Soil
Earth work excavation in all type of soils with an initial lead of 10m and lift of 2m-MR and DMR not requiring blasting
WMM 1:3:6 mix using 40mm HBS machine crushed metal for road including cost of all labour, materials, lead, lift, curing, etc., complete.
PCC 1:3:6, using 40mm HBG machine crushed metal for foundation padding concrete including cost of cement and all materials, curing, lead, lift etc.,complete. - WITH OUT FORM WORK
PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. - PCC kerb wall with form work.
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for continuous lintel, sunshade, slab, beams with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement.( By using mixer machine and vibrators) - Road
Supplying and fabrication and placing in position MS/ RTS steel reinforcement for RCC works including labour for curing , bending, tying and fixing in position including cost of all materials, lead, lift, binding wire etc., complete.
Plastering with CM 1:3, 12mm thick for ceiling including cost of all materials, labour, lead, lift etc., complete.
Colour washing two coats out side walls by using Exterior emulsion paint over a primer one coat of approved quality with suitable colour including cost of all materials, labour, lead, lift, curing etc., complete.
ENTRANCE CULVERT WORK -Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete.
Earthwork excavation in medium rock and dense medium rock not requiring blasting. (As instructed by the Engineer at site)
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. (As instructed by the Engineer at site)
PCC 1:3:6 mix using 40mm HBS machine crushed metal without formwork including cost of all labour, materials, lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete.
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
RCC wall 1:1.5:3 using 12-20mm HBG metal for Culvert wall with form work including cost of all materials, form work including cost of all materials, labour, lead, lift, etc. complete.
FENCING WORK - Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m - In Hard Gravely Soil
Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m-MR and DMR not requiring blasting
Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m-Hard rock requiring blasting
PCC 1:3:6, using 40mm HBG machine crushed metal for foundation padding concrete including cost of cement and all materials, curing, lead, lift etc.,complete. - WITH OUT FORM WORK
PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. - PCC wall with form
supplying,fabrication,galvanising and fixing of GI angles for fence post including cost of all materials lead and lift etc., complete
Supplying and laying of chain link fencing of 2" x 2" of 10 Gauge galvanised iron including cost of all materials,labour, lead, lift etc complete as directed by the engineer at site.
ENTRANCE GATE WORK - Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m - In Hard Gravely Soil
Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m-MR and DMR not requiring blasting
Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m-Hard rock requiring blasting
PCC 1:3:6, using 40mm HBG machine crushed metal for foundation padding concrete including cost of cement and all materials, curing, lead, lift etc.,complete. -WITH OUT FORM WORK
Brickwork in CM 1:5 using chamber bricks for wing wall including cost of all materials,labour,lead,lift etc complete
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for column, plinth beam and grade beam with out form work including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement.
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for column, plinth beam and grade beam with form work including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement.
Supplying and fabrication and placing in position MS/ RTS steel reinforcement for RCC works including labour for curing , bending, tying and fixing in position including cost of all materials, lead, lift, binding wire etc., complete.
Plastering with CM 1:3, 12mm thick for walls including cost of all materials, labour, lead, lift etc., complete.
Colour washing two coats out side walls by using Exterior emulsion paint over a primer one coat of approved quality with suitable colour including cost of all materials, labour, lead, lift, curing etc., complete.
Supplying of 5 Mtrs wide MS grill gate and 0.90m wide MS wicket gate as Per drawing and as per direction of Engineer at site cost including all materials,T&P lead,lift Painting with two coats of approved enamel paint over one coat of red oxide primer paint etc complete
Supply and fixing of Entrance gate light with CFL bulb fittings including cost of all materials,labour etc., complete
Providing projected border of 10cm width for wing wall including cost of materials,labour,lead,lift etc., complete
BOREWELL WORK - Drilling bore well of 150mm dia 6” in all soils, hard rock etc., including transporting of machineries with equipments and all necessary T & P’s labouretc.,complete as per specification -Upto 100 Mts
Drilling bore well of 150mm dia 6” in all soils, hard rock etc., including transporting of machineries with equipments and all necessary T & P’s labouretc.,complete as per specification - 100-200 Mts.
Supply and erection of 180mm (7”) dia rigid PVC casing pipe, having 6kg/cm² including cost all materials,lead, lift, re-boring the holes to required depth etc., complete with cover at the top of the bore well.
Supply and erection of 3 HP sumersiblemotor of any reputed make having ISI make with single phase (or) as approved by the Board Engineer at site to pump water to a height of 300mts.and delivery unit with foot valve v-belt arrangement including cost of all materials, labour, erection charges, 3 HP, 400/440V L&T make starter to suit the sumersiblemotor including the cost of all materials, labour, lead and as per the instruction of Engineer in charge at site complete in all respects.
Supply and erection of 3 phase 30/32 Amps ICTP switch with fuse arrangements to suit the compressor with cost of all materials, labour, lead and lift etc., complete in all respects.
Supply and erection of 32mm diaUPVC pipe having ISI mark and as per IS 4985 2000 (10 Kg/CM²) in and outside of the bore well including cost of all materials, labour, lead,lift etc., complete.
Supplying and laying of 4 core 6 Sq mm power cable from nearest power point to 3 HP motor including earth work excavation ,laying power cable in the pit and top covered with country bricks and refilling with excavated earth, lead. lift ,etc. complete
Charges for geophysical survey for invetigation of borewell point at various location in the SS site
Drilling bore well of 150mm dia 6” in all soils, hard rock etc., including transporting of machineries with equipments and all necessary T & P’s labouretc.,complete as per specification -above 200 Mts
Supplying and fixing of 1HP Mono block pump with all accessories of approved quality and of reputed make including cost of all materials, labour for fixing in position, lead, lifts, etc., complete.
FURNITURES - Supply of Steel clerks table with single drawer and cabinet on the right side of size 42"x24"x30" ( Make:TANSI)
Supply of Steel "S" type Chair with arm. Make:TANSI - 1 No.
Supply of Steel Half Bench with "L" top of size 36"x15"x18" Make:TANSI
Supply of Steel Stool of size 15"x15"x18" H Make:TANSI
Supply of Steel Side Rack "O" Type with 4 shelves including Top and bottom forming 3 compartments of size 36"x33"x12" (Make:TANSI)
Supply of Steel senior plain cupboard with 4 shelves forming 5 compartments of size 78"x36"x19" Make:TANSI
Supply of Plastic Arm Chair
YARD STRUCTURE PLINTH WORK -Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete.
Earthwork excavation in medium rock and dense medium rock not requiring blasting.
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete.
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including with out form work cost of all labour, materials, lead, lift, curing, etc., complete.
PCC 1:2:4 using 12-20mm HBS metal for structure concrete with form work including cost all materials lead, lifts, labour curing etc complete
PCC 1:2:4 using 12-20mm HBS metal for support structures concrete with out formwork including cost all materials lead, lifts, labour curing etc complete
Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Colour washing two coats with Exterior Plastic Emulsion paint over one coat of Plastic Emulsion primer for outside wall including cost of all materials, labour, lead, lift, etc., complete.
Assembling of various plinth templates for providing concrete including transporting from one plinth to another, alingning fixing to corrrect level and dismatling the templete after concreting including cost of labour, cost of template, lead, lift, etc., complete.
Supplying and fabrication of 20mm dia grouting bolt, including cost thread all materials, lead, lift etc complete
BREAKER PLINTH WORK - Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete.
Earthwork excavation in medium rock and dense medium rock not requiring blasting.
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete.
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including with out form work cost of all labour, materials, lead, lift, curing, etc., complete.
PCC 1:2:4 using 12-20mm HBS metal for structure concrete with form work including cost all materials lead, lifts, labour curing etc complete
PCC 1:2:4 using 12-20mm HBS metal for support structures concrete with out formwork including cost all materials lead, lifts, labour curing etc complete
Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Colour washing two coats with Exterior Plastic Emulsion paint over one coat of Plastic Emulsion primer for outside wall including cost of all materials, labour, lead, lift, etc., complete.
Assembling of various plinth templates for providing concrete including transporting from one plinth to another, alingning fixing to corrrect level and dismatling the templete after concreting including cost of labour, cost of template, lead, lift, etc., complete.
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Supplying and fabrication of 20mm dia grouting bolt, including cost thread all materials, lead, lift etc complete
SUPPORT STRUCTURE WORK -Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete.
Earthwork excavation in medium rock and dense medium rock not requiring blasting etc., complete.
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete.
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including with out form work cost of all labour, materials, lead, lift, curing, etc., complete.
PCC 1:2:4 using 12-20mm HBS metal for structure concrete without form work including cost all materials lead, lifts, labour curing etc complete
PCC 1:2:4 using 12-20mm HBS metal for structure concrete with form work including cost all materials lead, lifts, labour curing etc complete
Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Colour washing two coats with Exterior Plastic Emulsion paint over one coat of Plastic Emulsion primer for outside wall including cost of all materials, labour, lead, lift, etc., complete.
Labour charge for fixing template in correct level and alignment, including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fabrication of 20mm dia grouting bolt, including cost thread all materials, lead, lift etc complete
FILLING WORK - Supplying and filling of gravel in the yard area, labour for filling, watering and consolidation, including cost of all materials, lead, lifts, labour, etc, complete.
CABLE DUCT WORK - Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete.
Earthwork excavation in medium rock and dense medium rock not requiring blasting. (As instructed by the Engineer at site)
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. (As instructed by the Engineer at site)
PCC 1:3:6 mix using 40mm HBS machine crushed metal without formwork including cost of all labour, materials, lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete.
Brickwork in CM 1:5 mix using II class chamber bricks of size 9"x 4 3/8"x 23/4" for basement and superstructure including cost of all materials, labour, lead, lift, curing, etc., complete. (As instructed by the Engineer at site)
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
RCC 1:1.5:3 using 12 to 20 mm HBG machine crushed metal for Precast slab , including cost of cement and all lead, lift, curing, etc., complete but excluding cost of steel reinforcement. (As instructed by the Engineer at site.)
Plastering with CM. 1:3 mix 12mm thick for fol, bath, RCC pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Colour washing two coats with Cement paint approved colour over Primary coats for out side wall including cost of all materials, lead, lift, labours, etc, complete.
Labour charges for transporting from casting yard to curing tank, curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete
Supplying and fixing of MS angle for cable duct including aliging in position and including all labour lead lifts etc complete.
Supplying and laying PVC pipe 110 mm outer dia 6kg / cm2 ISI make for cable duct including cost of PVC pipe, labour for cutting laying fixing etc complete (As instructed by engineer at site)
ROAD CROSSING CULVERT WORK - Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete.
Earthwork excavation in medium rock and dense medium rock not requiring blasting. (As instructed by the Engineer at site)
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. (As instructed by the Engineer at site)
PCC 1:3:6 mix using 40mm HBS machine crushed metal without formwork including cost of all labour, materials, lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete.
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
RCC wall 1:1.5:3 using 12-20mm HBG metal for Culvert wall with form work including cost of all materials, form work including cost of all materials, labour, lead, lift, etc. complete.
TRANSFORMER PLINTH WORK - Earth work excavation in all type of soils with an initial lead of 10m and lift of 2m - In Hard Gravely Soil
Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m-MR and DMR not requiring blasting
Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m-Hard rock requiring blasting
PCC 1:2:4, using 20mm HBG machine crushed metal for foundation padding concrete without form work including cost of cement and all materials, curing, lead, lift etc.,complete.
PCC 1:2:4, using 20mm HBG machine crushed metal for foundation padding concrete with form work including cost of cement and all materials, curing, lead, lift etc.,complete.
RCC 1:1.5:3 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. - With form work
Plastering with CM 1:3, 12mm thick for structure portion above GL including cost of all materials, labour, lead, lift etc., complete.
Colour washing two coats out side walls by using Exterior emulsion paint over a primer one coat of approved quality with suitable colour including cost of all materials, labour, lead, lift, curing etc., complete.
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Supply and fixing of MS rails (90 LBS )in transformer plinth to required level and alignment as directed by the engineer incharge at site with all labour lead lift etc complete
YARD RETAINING WALL WORK - Earth work excavation in all type of soils with an initial lead of 10m and lift of 2m - In Hard Gravely Soil
Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m-MR and DMR not requiring blasting
Earthwork excavation in all type of soils with an initial lead of 10m and lift of 2m-Hard rock requiring blasting
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete.
PCC 1:3:6, using 40mm HBG machine crushed metal for foundation padding concrete including cost of cement and all materials, curing, lead, lift etc.,complete. -WITH OUT FORM WORK
Brickwork in CM 1:5 using chamber bricks for wing wall including cost of all materials,labour,lead,lift etc complete
Plastering with CM 1:3, 12mm thick for walls including cost of all materials, labour, lead, lift etc., complete.
Colour washing two coats out side walls by using Exterior emulsion paint over a primer one coat of approved quality with suitable colour including cost of all materials, labour, lead, lift, curing etc., complete.
PCC 1:2:4, using 12-20mm HBG machine crushed metal for plinth, side wall, etc including cost of cement and all materials, curing, lead, lift etc.,complete. -WITH FORM WORK
WATER SUPPLY TO EARTH PITS -Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete. -40 mm dia pipe.10kg/Sq.m
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete. -32 mm dia PVC 10 kg
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete. -20 mm dia PVC 10 kg
Supplying and fixing inposition of GM gate valve best quality including cost of all special fixtures lead, lift,etc., complete. -40 mm dia GM Gate valve
Supplying and fixing inposition of GM gate valve best quality including cost of all special fixtures lead, lift,etc., complete. - 32 mm dia gate valve
Supply and erection of 20 mm PVC Tap for earth pits.
Supplying and fixing of 65mm dia GI pipe 'B' class of approved ISI mark for road crossing to protect the waterline including cost of pipe, labour, lead, lift, labour, etc., complete.
SAND DRUM - Provision of Sand drum for the each power transformer cost of Material and transport charges etc
M.SAND - Provision of one unit of M.sand at the substation including cost of Material and transport charges etc (One load)
METAL SPREADING - Supplying and filling of stone chips 12-20 mm HBG metal with required thick all lead and lift including and all other T&P etc., complete.
Supplying and filling of stone dust with required thick all lead and lift including and all other T&P etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
GOLDEN CONSTRUCTIONS (BID ID -1485844)
TRadhakrishnanandco (BID ID -1486076)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid