Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC DOOR NO 3 386 THAGAVEL RICE SHOP NALLAMPALLI VILLAGE AND POST NEAR SINGARAN KALYANAMANDABAM NALLAMPALLI POST DHARMAPURI T K AND D T 636807 | NALLAMPALLI | DHARMAPURI | TAMIL NADU | 636807 | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 Cr+₹3.9 L (2.45%)Rejected-AOC | ₹1.6 Cr+₹3.9 L (2.45%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
10 May 2023, 3:00 pmClosed
The Addl. Collector/ Project Director, DRDA, DPI
DRDA, Dharmapuri
Dharmapuri District - Upgradation / Strengthening of the road 2 Nos. in Package No. TN04-14 MGSMT / 2022-2023 Nallampalli Block P14
2023_RDTN_308595_1
Roc.No.1231/2023/R2 Dt.03.04.2023 MGSMT P14
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹1.6 L
6 Jul 2023
1 May 2023
10 May 2023
1 May 2023
10 May 2023
1 May 2023
Amount
Strengthening of the road from Appanahalli Kombai to Kammalankuttai Road Km.0/0-1/800
Clearing Scrub Jungle including removing from the site,disposal by burying or burning etc., complete as directed by the departmental officers. KM 0/0-1/800
Picking the Existing BT Surface wornout Surface including all labour charges etc
Collection and supply of Carted Earth from approved Quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc. Compete
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp..
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
1.50 m RCC Slab Culvert at Ch.1680
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
1.50 m RCC Slab Culvert at Ch.1680
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
1.50 m RCC Slab Culvert at Ch.1680
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
1.50 m RCC Slab Culvert at Ch.1680
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
1.50 m RCC Slab Culvert at Ch.1680
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
1.50 m RCC Slab Culvert at Ch.1680
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
1.50 m RCC Slab Culvert at Ch.1680
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Below Sill 1.50 m RCC Slab Culvert at Ch.1680
Slab centerin Deck slab side 1.50 m RCC Slab Culvert at Ch.1680
Supply and fixing of weep holes using 90mm PVC Pipes including cost of all site etc.,
1.50 m RCC Slab Culvert at Ch.1680
Provision foer Expansion Joints (Bitumen Pad)
1.50 m RCC Slab Culvert at Ch.1680
Provision for KM stones
Provision for HM stones
Provision for 60 cm Equilateral Triangel Sign Board
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strengthening of the road from Sivadi RS to Boothanahalli road Km.0/0-2/00
Clearing Scrub Jungle including removing from the site,disposal by burying or burning etc., complete as directed by the departmental officers. KM 0/0 - 2/0
Picking the Existing BT Surface wornout Surface including all labour charges etc
Collection and supply of Carted Earth from approved Quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc. Compete
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
As Per Calculation Sheet
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp..
As Per Calculation Sheet
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
1.50 m RCC Slab Culvert at Ch.750
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
1.50 m RCC Slab Culvert at Ch.750
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
1.50 m RCC Slab Culvert at Ch.750
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
1.50 m RCC Slab Culvert at Ch.750
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
1.50 m RCC Slab Culvert at Ch.750
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
1.50 m RCC Slab Culvert at Ch.750
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
1.50 m RCC Slab Culvert at Ch.750
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Below Sill 1.50 m RCC Slab Culvert at Ch.750
Slab centerin Deck slab side 1.50 m RCC Slab Culvert at Ch.750
Supply and fixing of weep holes using 90mm PVC Pipes including cost of all site etc.,
1.50 m RCC Slab Culvert at Ch.750
Provision foer Expansion Joints (Bitumen Pad)
1.50 m RCC Slab Culvert at Ch.750
Provision for KM stones
Provision for HM stones
Provision for 60 cm Equilateral Triangel Sign Board
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Kaveri
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .