| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.9 CrAccepted-AOC NOT SPECIFIED | ₹6.9 Cr | 1 | Accepted-AOC found lowest |
| 2 | 2₹7.9 Cr+₹96.0 L (13.9%)Rejected-Finance HOUSE NO 769 SOUTH CIVIL LINES MUZAFFARNAGAR UP 241001 | HARDOI | UTTAR PRADESH | 241001 | ₹7.9 Cr+₹96.0 L (13.9%) | 2 | Rejected-Finance Not Lowest |
| 3 | 3₹10.6 Cr+₹3.7 Cr (53.4%)Rejected-Finance 126 A JAIPUR HOUSE AGRA 282010 PH NO 0562 2810176 9897638555 | ₹10.6 Cr+₹3.7 Cr (53.4%) | 3 | Rejected-Finance Not Lowest |
| 4 | 4₹11.7 Cr+₹4.8 Cr (69.8%)Rejected-Finance | ₹11.7 Cr+₹4.8 Cr (69.8%) | 4 | Rejected-Finance Not Lowest |
| 5 | Rejected-Technical | - | - | Rejected-Technical EMD not submitted |
Tender Value
₹6.5 Cr
EMD Value
₹13 L
Closing Date
28 Mar 2025, 6:00 pmClosed
DG MAP
HQ DG MAP E in C Branch New Delhi
Completion of balance and allied works for construction of sewage disposal and sewage treatment plants including commissioning testing and comprehensive maintainance operations of existing STPs at Meerut
2025_MES_698556_1
84832 MEERUT STP
Open Tender
Civil Works - Others
Item Rate
670 days
Meerut sewage disposal and STP works
As per NIT
2 documents required · 2 mandatory
₹3,000
₹13 L
New Delhi
6 Jun 2025
19 Feb 2025
31 Mar 2025
19 Feb 2025
28 Mar 2025
13 Mar 2025
20 Feb 2025 - 3 Mar 2025
3 Mar 2025
Amount
SCHEDULE 'A' SECTION -I - Site Clearance & Sewage Disposal Works (At all Locations Including Military Farm & Shivaji Lines)
Excavation in trenches,in soft/loose soil not exc 1.5m wide and not exc 1.5m in depth; for foundations, shafts, wells, cesspits, manholes, pier holes etc. not exc 10 sqm on plan and 1.5m in depth and getting out complete all as specified and as directed by PM (MAP) at site
All as per item No. 1 above but exc. 1.5 mtr and n. exc. 3 mtr in depth.
All as per item No. 1 above but exc. 3.0 mtr and n. exc. 4.5 mtr in depth.
All as per item No. 1 above but exc. 4.5 mtr and n. exc. 6 mtr in depth.
Returning, filling in soft/loose soil, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed by Project Manager at site
Removing excavated material to distance exc. 200m and n exc. 250m and depositing where directed at a level not exc. 1.5 m above the starting point complete all as specified and as directed by Project Manager at site.
Materials & Labour for PCC 1:4:8 (type D2) (using 40mm garded stone aggregate) in foundations filling and compacting mass concrete complete all as specified and directed.
Materials & Labour for brick work with sub-class 'B' common burnt clay building bricks, straight or curved on plan exceeding 6 m mean radius, built in CM 1:4 in sewer work complete all as specified and as directed by PM (MAP).
Materials & Labour for PCC 1:2:4 (type B1) using 20 mm graded stone aggregate as in benching etc including necessary from work required and finishing the surface even & fair with out using extra cement complete all as specified and directed at site.
Extra for forming fair finished drain or channel 30 cm inner girth in cement concrete using extra cement including forms/moulds. Mitred/Stop end etc. complete all as specified and directed at site.
M & L for PCC 1:3:6 (Type C2) (using 40 mm graded stone aggregate) to be laid in bed to drain pipe of size 150 mm dia bore including packing under and haunching against the side of pipes after they are laid and tested complete all as specified and directed at site.
All as per item No.11 above but for 200 mm dia bore drain pipe.
All as per item No.11 above but for 250 mm dia bore drain pipe.
Providing and laying Salt glazed stone ware drain pipes of 150 mm internal dia bore laid in trenches and jointed as specified complete all as specified and directed at site.
All as per item No 14 above but 200 mm dia bore complete all as specified and directed at site.
All as per item No 14 above but 250 mm dia bore complete all as specified and directed at site.
Materials & Labour plastering 15 mm thick in CM 1;4 on fair surfaces of brick work or concrete surfaces finished even and smooth without using extra cement complete all as specified and directed.
Materials & Labour for integral water proofing compound to be mixed in cement/ concret complete all as specified and directed at site.
Providing and laying Precast Reinforced Cement Conceret (type B1) 1:2:4 (using 20 mm graded stone aggregate) as in cover slabs (for Man holes) including necessary form work set in CM 1:4 complete all as specified and directed. Note: Reinforcement shall be measured and paid seperately under relevant items.
M&L for MS bars TMT 10 mm dia and over, cut to length,bent to shape required,including cranking, benching,spirally for hooping for columns,hooking ends and binding with and including MS wire (annealed) not less than 0.9 mm dia or securing with clips complete all as specified and directed
Providing and fixing MS polypropyled coated foot rests fixed in manholes with 30 x 20 x 10 cm cement concrete blocks of PCC1:3:6 (1 Cement : 3 course sand : 6 graded stone aggregate 20 mm nominal size) conforming pattern 1 of IS: 5455-1969 complete all as specified, shown on drawings and directed at site.
Providing Laying and compacting Hardcore of gauge n.exc.63 mm ,deposited spread and levelled in layers n exc. 15 cm thick watered and rammed to a true surface complete all as directed at site.
Cutting holes into or through brick walls built in cement mortar and making good in cement mortar or cement concrete 1:2:4 type B-1 as required. exceeding 150 sqcm but n exc 400 sqcm complete all as directed
Materials & Labour for Construction of Flushing Tank of Capacity 2000 ltr alongwith Pit including Excavation, Brick work, Concrete,Plaster,GI Pipe,covers complete all as specified and shown in drawing. (solenoide valve with timer 50 mm dia shall be paid separatly)
Supply & fixing precast manhole covers/frames of plastic fibre reinforced concrete (PFRC) of medium duty with ultimate breaking test load of 10 tonnes when tested as per IS1726-1991 and IS: 5455-1969.Drg No GE-1971-563A, GE-1971-564A, GE-1971-565A complete all as directed at site.
Supply & fixing of solenoide valve with timer 50 mm dia of approved make complete all as directed at site.
Cleaning of existing sewer pipe lines of following sizes by removing mud debris, waste or deposits of building materials using all means and making it fully functional complete in all respect as required at site including disposal of waste material from site by mechanical process complete all as specified & directed at site. (a) For pipe of dia 150mm bore
(b) All as per above item but for Pipe of dia 200 mm bore
(c) All as per above item but for Pipe of dia 250 mm bore
Cleaning of existing Manholes of various dia and following depth using all means for removing mud, debris waste, deposits of building Materials, any other stucked material in manholes and lift to make in fullly functional complete in all respect as required at site including disposal of waste material/malba from site and cleaning the site complete as directed. (a) Manhoels up to depth of 1.5 Mtrs
(b)All as per above item but for Manhoels up to depth of 3.00 Mtrs
(c) All as per above item but for Manhoels up to depth of 4.5 Mtrs
(d) All as per above item but for Manholes up to depth of 6.00 Mtrs
Dismantling of cement concrete of any description and in any position not otherwise specifically provided for cement and removing of waste Materials from site complete all as directed at site.
Providing cement concrete Type B1(1:2:4) using 20 mm graded stone aggregate in lintels upto 1.5mm clear span, cills, steps; seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, complete all as specified and directed at site.
Materials and labour for plastering 12 mm thick on fair surfaces of brickwork/concrete work using cement mortar 1:3 finished even and smooth (without using extra cement) complete all as specified and directed at site.
SCHEDULE 'A' SECTION -II - Missing items of STPs Note: All Panels/Motors/Pumps & Other equipements should be earthed properly. Contractor should consider this factor while quoting the rated and No extra cost shall be payable for this purpose except otherwise cattered in this BOQ. (A) MILITARY FARM
Supply, Installation testing and commissioning of Raw Sewage Pumps of aproved make Min 150 cum /hr capacity at 6.5 mwc for equalization tank including all accessories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicators, necessary electrical appliances dtc complete). all as specified and directed by PM (MAP) (2 working + 2 stand by).
Supply, Installation testing and commissioning of Dosing Pump of of approved make capacity 6.0 LPH & 30 m head with the Hypo dosing tank of 200ltr capacity (HDPE) with constant head box including all accessories (Pipes with elbow, tees, flanges, gaskets, gate valves, presure gauge, level indicators, necessary electrical appliances etc complete all as specified and directed by PM (MAP) (2 working + 2 stand by).
Supply, Installation testing and commissioning of Sludge Transfer pumps of approved make Min 2.5 m3/hr capacity at 10 mwc including all accessories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicators, necessary electrical appliances dtc complete). all as specified and directed by PM (MAP) (2 working + 2 stand by).
Supply, Installation testing and commissioning of Treated Sewage Transfer Pump of approved make (1.5 cum / hr) capacity at head of 6.5 mwc including all accessories all as specified and directed by PM (MAP) (2 working + 2 stand by).
Supply, Installation testing and commissioning of Air blower (Motor) of approved make for MBBR/Aeration tank capacity min 400 cum / hr at 3.0 mwc head for Aeration Tank including all accessories all as specified and directed by PM (MAP) (only Motor)
Supply, Installation testing and commissioning of Air blower (Motor)of approved make for equalisation tank capacity min 150 cum / hrs at 3.5 mwc head including all accessories all as specified and directed by PM (MAP).(only Motor)
Supply, Installation testing and commissioning of Air blower (Motor) of approved make for sludge tank capacity min 60 m3 / hr at 4.5 mwc head including all accessories all as specified and directed by PM (MAP). (only Motor)
Supply, Installation testing and commissioning of Screw pumps of approved make for filter press having capacity 2 cum / hr at back pressure of 5 kg per Cm2 including all accessories all as specified and directed by PM (MAP). (2 working + 2 stand by).
Supply, Installation testing and commissioning of Filter Feed Pump,of approved make horizontal, centrifugal type with cast iron casing & bronze impeller of capacity 15 cum / hr at a back pressure of 2.5 kg cm2 including all accessories all as specified and directed by PM (MAP). (2 working + 2 stand by).
Supply, Installation testing and commissioning of Treated Water Supply Pumps, of approved make horizontal, centrifugal type with CI casing with bronze impeller having capacity 25 cum /hr at a back pressure of 2.5 kg cm2 all as specified and directed by PM (MAP) (2 working + 2 stand by).
Supply, Installation testing and commissioning of non clog submersible sewage pump of approved make capacity 5 HP including all asseories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicator, necessary electrical appliances earthing etc complete). all as and directed at site by PM (MAP) (for sump well).Note: Installation shall be done with guide rail and liffing chain, cables, earthng, testing complete as required.
Supply, Installation testing and commissioning of non clog submersible sewage pump of approved make capacity 7.5 HP including all asseories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicator, necessary electrical appliances earthing etc complete). all as and directed at site by PM MAP at site (MAP) (for sump well) Note: Installation shall be done with guide rail and liffing chain, cables, earthng, testing complete as required.
Supply, Installation testing and commissioning of non clog submersible sewage pump of approved make capacity 12.5 HP including all asseories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicator, necessary electrical appliances earthing etc complete). all as and directed at site by PM MAP at site (MAP) (for sump well) Note: Installation shall be done with guide rail and liffing chain, cables, earthng, testing complete as required.
Supply, Installation testing and commissioning of Comprehensive electrical control panel of approved make including cabling form control panel to various drives and sensors complete in all respect to operate the plant including all asseccesories as directed.
(B) SHIVAJI LINES
Supply, Installation testing and commissioning of Raw Sewage Pumps of approved make Min 34 M3 /hr capacity at 8 mwc including all accessories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicators, necessary electrical appliances etc complete). all as specified and directed by PM (MAP) at site for equalization tank. (1 working + 1 stand by).
Supply, Installation testing and commissioning of Dosing Pump of approved make capacity 6.0 LPH & 30 m head with the hypo dosing tank of 300ltr capacity (HDPE) with constant head box including all accessories (Pipes with elbow, tees, flanges, gaskets, gate valves, presure gauge, level indicators, necessary electrical appliances etc complete all as specified and directed by PM (MAP) (1 working + 1 stand by).
Supply, Installation testing and commissioning of Sludge Transfer pumps of approved make Min 5m3/hr capacity at 10 mwc respectively including all accessories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicators, necessary electrical appliances dtc complete). all as specified and directed by PM (MAP) (1 working + 1 stand by).
Supply, Installation testing and commissioning of Treated Sewage Transfer pump of approved make (40 m3/hr) capacity at head of 10 mwc respectively including all accessories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicators, necessary electrical appliances etc complete). all as specified and directed by PM (MAP) (1 working + 1 stand by).
Supply, Installation testing and commissioning of Air blower (Motor) of approved make for MBBR/Aeration of tank capacity min 918 cum/hr at 3.0mwc head including all accessories all as specified and directed by PM (MAP) (1 working + 1 stand by). (only Motor)
Supply, Installation testing and commissioning of Air blower (Motor) of approved make for Equalisation Tank of capacity min 300 cum / hr at 3.5 mwc head including all accessories all as specified and directed by PM (MAP) (1 working + 1 stand by). (only Motor)
Supply, Installation testing and commissioning of Air blower (Motor) of aproved make for Sludge Tank of capacity Min 180 cum/hr at 4.5 mwc head including all accessories all as specified and directed by PM (MAP) (1 working + 1 stand by). (only Motor)
Supply, Installation testing and commissioning of Screw pumps of approved make for filter press having capacity 5 cum/hr at back pressure of 5 kg per Cm sq all as specified and directed by PM (MAP) (1 working + 1 stand by).
Supply, Installation testing and commissioning of Filter Feed Pump, of approved make horizontal, centrifugal type with cast iron casing & bronze impeller of capacity 40 cum/hr at a back pressure of 2.5 kg cmsq all as specified and directed by PM (MAP) (1 working + 1 stand by).
Supply, Installation testing and commissioning of Treated Water Supply Pumps, horizontal, centrifugal type with CI casing with bronze impeller of approved make having capacity 50 cum /hr at a back pressure of 2.5 kg cm/sq all as specified and directed by PM (MAP) (1 working + 1 stand by).
Supply, Installation testing and commissioning of non clog submersible sewage pump of approved make capacity 5 HP including all asseories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicator, necessary electrical appliances earthing etc complete). all as specified by PM (MAP) for sump well.Note: Installation shall be done with guide rail and liffing chain, cables, earthng, testing complete as required.
Supply, Installation testing and commissioning of non clog submersible sewage pump of approved make capacity 10HP including all asseories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicator, necessary electrical appliances earthing etc complete). all as specified by PM (MAP) for sump well.Note: Installation shall be done with guide rail and liffing chain, cables, earthng, testing complete as required.
Supply, Installation testing and commissioning of non clog submersible sewage pump of approved make capacity 12.5HP including all asseories (pipes with elbows,tees, flanges, gaskets, gate valves, pressure guage, level indicator, necessary electrical appliances earthing etc complete). all as specified by PM (MAP) for sump well.Note: Installation shall be done with guide rail and liffing chain, cables, earthng, testing complete as required.
Supply, Installation testing and commissioning of Comprehensive electrical control panel of approved make including cabling form control panel to various drives and sensors to operate the plant with all asseccesories complete in all respect as approved & directed at site .
SCHEDULE 'A' SECTION -III - STP's (3 Nos) - Dewatering, repairs, cabling, Pipes, Earthings, Paintings etc and Commissioning & Testing of exisiting STPs Note: The Bidder/Contractor are advise to visit the site and ascertain the quantity and nature of work before quoting the rates to avoid any ambiquity at later stage.
Dewatering and cleaning: Dewatering and cleaning of Sewage Treatment Plant including removing mud, debris, waste material etc from site complete in all respect for STP No 1 and 2 of 300 KLD each at Military Farm
All as per item 3.01 above but for STP No 3 of 800 KLD at Shivaji Lines
Cutting holes in RCC: Materials and labour for cutting holes into or through cement concrete walls, slab, floors etc or through RCC and making good including filling epoxy compound as required exceeding 150 Sqcm but not exc. 400 sqcm complete all as specified and directed by Project Manager at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.03 above but for STP No 3 of 800 KLD at Shivaji Lines
Dismantling and Plastering/Rendering : Taking down cement plaster on brick or stone walls or concrete surfaces etc including raking out joints, hacking for key, scrubbing down with water etc complete as directed by Project Manager at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.05 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and labour for brushing neat cement slurry to brick or stone surfaces with 3.0 Kg of cement per sq. metre mixed with approved water proofing compound complete all as directed at site for STP No 1 and 2 of 300 KLD each at Military Farm
All as per item 3.07 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and Labour for rendering 12 mm thick on fair faces of brick work or concrete surfaces with cement plaster 1: 6 on walls, finished even and smooth without using extra cement complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.09 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and labour for taking down cement plaster on brick or stone walls or concrete surfaces etc including raking out joints hacking for key, scrubbing down with water etc complete and applying Silicon Sealent Treatment to provide chemical cut off bottom of the wall complete as all directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.11 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and labour for rendering 6 mm thick on fair faces of brick work or concrete surfaces with cement plaster 1: 3 on walls, finished even and smooth without using extra cement complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.13 above but for STP No 3 of 800 KLD at Shivaji Lines
Water Proofing: Providing and applying Dr. fixit 501 silicon Sealent. 1 each coverage area = 3 Rmt. Total Qty 112 Rmt. So set no = 38 for STP No 1 and 2 of 300 KLD each at Military Farm
All as per item 3.15 above but for STP No 3 of 800 KLD at Shivaji Lines
Post ATT : Materials and Labour for applying chemical emulsion @ 2.25 liters per linear meter including drilling and plugging holes etc along external wall below concrete or masonry apron complete all as specified directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
Post ATT : All as per item 3.17 above but for STP No 3 of 800 KLD at Shivaji Lines
Post ATT : Materials and labour for treatment of soil under existing floors using emulsion @ one litre per hole, 300 mm apart including drilling and plugging 12 mm dia holes with cement mortar 1:2 (1 cement : 2 Coarse sand) and match the existing floors complete all as specified directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
Post ATT : All as per item 3.19 above but for STP No 3 of 800 KLD at Shivaji Lines
Kota Stone flooring : Dismantling existing kota stone fixed to walls/ floors etc and removing the waste materials from site complete all as directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.21 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and labour for providing and fixing machine cut kota stone slab flooring 20-25mm thick fixing with cement slurry mixed with pigment to match shade of the slab over screed bed or bedding layer of mortar 20mm thick of cement mortar (1:6) for laying floor finishes including rubbing and polishing the floors complete are as directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.23 above but for STP No 3 of 800 KLD at Shivaji Lines
Grit wash Plaster : Taking down grit wash plaster on brick or stone walls or concrete surfaces etc including raking out joints hacking for key, scrubbing down with water etc complete as directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.25 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and Labour for providing and laying washed stone grit plaster on exterior walls of height upto 10m, above level in two layers, under layer 12mm cement plaster 1:4 furrowing the under layer with scratching tool, applying cement slurry on the under @ 2 kg of cement per sqm, top layer 15 mm cement plaster 1:1/2:2 in panel with groove (size 15 mm wide & 15 mm deep) all around as per approved pattern including scrubbing and washing, the stone chipping, complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.27 above but for STP No 3 of 800 KLD at Shivaji Lines
Cables : Supply, laying, jointing and testing LT XLPE insulated screened, bedded, galvanised steel strip or wire armoured heavy duty electric cable with aluminium stranded conductor 1100 Volt grade cross sectional area 16 sqmm 4 core laid in trenches/ducts, through pipe, under floors or roads/ along poles etc complete all as specified and as directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.29 above but for STP No 3 of 800 KLD at Shivaji Lines
Supply, laying, jointing and testing LT XLPE insulated screened, bedded, galvanised steel strip or wire armoured heavy duty electric cable with aluminium stranded conductor 1100 Volt grade cross sectional area 4 sqmm 3 core laid in trenches/ducts, through pipe, under floors or roads/ along poles, panels etc complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.31 above but for STP No 3 of 800 KLD at Shivaji Lines
Supply, laying, jointing and testing LT XLPE insulated screened, bedded, galvanised steel strip or wire armoured heavy duty electric cable with aluminium stranded conductor 1100 Volt grade cross sectional area 6 sqmm 3 core laid in trenches/ducts, through pipe, under floors or roads/ along poles, panels etc complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.33 above but for STP No 3 of 800 KLD at Shivaji Lines
Supply, laying, jointing and testing LT XLPE insulated screened, bedded, galvanised steel strip or wire armoured heavy duty electric cable with aluminium stranded conductor 1100 Volt grade cross sectional area 10 sqmm 3 core laid in trenches/ducts, through pipe, under floors or roads/ along poles, panels etc complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.35 above but for STP No 3 of 800 KLD at Shivaji Lines
Earthings : Material and labour Earthing complete with galvanised iron earth plate electrode of size 600mm x 600mm x 6mm buried directly in ground (earth pit not less than 2.25 mtr deep below ground level) with top edge of the plate not less than 1.5 metre below normal ground level, connected to and including GI strip 25 x 4 mm (upto the body of equipment earth lead up to 7.50 meter length from earth plate) by means of GI bolts/nuts/washers, protected by 40 mm bore GI light grade pipe. Earth plate shall be surrounded by alternate layer of charcoal or coke and common salt 15 cm thick all around bottom and top. 20 mm bore GI medium grade pipe for watering and including funnel, wire mesh, RCC cover & frame, PCC (1:2:4) type B1 (using 20mm graded crushed stone aggregate) as in earthing pit including necessary excavation & earth work, all as specified & shown in electrical plate No. 3 of SSR Part-I and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm. Notes:- (i) PCC chamber shall be constructed at least 1.5 metre away from the earth electrode and pipe for watering shall be provided in slanting manner. (ii) The unit rate includes earth lead upto 7.5 meter length from top of earth plate.
All as per item 3.37 above but for STP No 3 of 800 KLD at Shivaji Lines
Material and labour Earthing complete with galvanised iron earth plate electrode of size 600mm x 600mm x 6mm buried directly in ground (earth pit not less than 2.25 mtr deep below ground level) with top edge of the plate not less than 1.5 metre below normal ground level, connected to and including GI wire 4 mm dia (upto the test point / cross arms earth lead upto 7.5 meter length from top of earth plate) by means of GI bolts/nuts/washers, protected by 15 mm bore GI light grade pipe. Earth plate shall be surrounded by alternate layer of charcoal or coke and common salt 15 cm thick all around bottom and top. 20 mm bore GI medium grade pipe for watering and including funnel, wire mesh, RCC cover & frame, PCC (1:2:4) type B1 (using 20 mm graded crushed stone aggregate) as in earthing pit including necessary excavation & earth work, all as specified & shown in electrical plate No. 3 of SSR Part-I and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm. Notes :- (i) PCC chamber shall be constructed at least 1.5 metre away from the earth electrode and pipe for watering shall be provided in slanting manner. (ii) The unit rate includes earth lead upto 7.5 Material and labour Earthing complete with galvanised iron earth plate electrode of size 600mm x 600mm x 6mm buried directly in ground (earth pit not less than 2.25 mtr deep below ground level) with top edge of the plate not less than 1.5 metre below normal ground level, connected to and including GI wire 4 mm dia (upto the test point / cross arms earth lead upto 7.5 Meter length from top of earth plate) by means of GI bolts/nuts/washers, protected by 15 mm bore GI light grade pipe. Earth plate shall be surrounded by alternate layer of charcoal or coke and common salt 15 cm thick all around bottom and top. 20 mm bore GI medium grade pipe for watering and including funnel, wire mesh, RCC cover & frame, PCC (1:2:4) type B1 (using 20 mm graded crushed stone aggregate) as in earthing pit including necessary excavation & earth work, all as specified & shown in electrical plate No. 3 of SSR Part-I. Notes :- (i) PCC chamber shall be constructed at least 1.5 metre away from the earth electrode and pipe for watering shall be provided in slanting manner. (ii) The unit rate includes earth lead upto 7.5 meter length from top of earth plate.
All as per item 3.39 above but for STP No 3 of 800 KLD at Shivaji Lines
Material and labour for earth continuity conductor or main earthing lead, 4mm dia GI wire, fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.41 above but for STP No 3 of 800 KLD at Shivaji Lines
Material and labour for earth continuity conductor or main earthing lead, 25x4mm galvanised iron strip, fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.43 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and labour for synthetic insulating mat of size 2000mm x 1000mm and 25 mm thick for electrical purposes, ISI marked, suitable for 1.1 KV system, including all allied fixing materials etc. complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.45 above but for STP No 3 of 800 KLD at Shivaji Lines
Street Light fittings : Supply and fixing of street light fitting 72W LED street light (LSTP-72-CDL) of approved make comprising of Pressure die cast aluminium housing powder coated in silver grey and heat resistant toughned glass complete with control gear compartment, acrylic cover, prewired etc. with operating voltage 120-270v, power factor >.95, frequency 50Hz and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.47 above but for STP No 3 of 800 KLD at Shivaji Lines
Pipes : Materials and Labour for providing and fixing flexible PVC Hoze pipe 50mm dia including fittings as required in equalization tank complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.49 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and Labour for providing and fixing 40mm dia MS pipe with all fittings such as sockets, elbows, etc of approved make complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.51 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and Labour for providing and fixing 65mm dia MS pipe with all fittings such as sockets, elbows, etc of approved make complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.53 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and Labour for providing and fixing 80mm dia MS pipe with all fittings such as sockets, elbows, etc of approved make complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.55 above but for STP No 3 of 800 KLD at Shivaji Lines
Materials and Labour for providing and fixing 100mm dia MS pipe with all fittings such as sockets, elbows, etc of approved make complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.57 above but for STP No 3 of 800 KLD at Shivaji Lines.
Materials and Labour for providing and fixing 125mm dia MS pipe with all fittings such as sockets, elbows, etc of approved make complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.59 above but for STP No 3 of 800 KLD at Shivaji Lines.
Supply, installation, commissioning and testing of stainless steel pipe of 50mm bore thickness of 12 SWG of approved make for equalisation tank and MBBR reactor complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm. Note:- Stainless steel pipes shall be used inside MBBR chamber and equalisation tank for supplying air for outside the tank all pipe shall be MS pipe.
All as per item 3.61 above but for STP No 3 of 800 KLD at Shivaji Lines.
Supply, installation, commissioning and testing of stainless steel pipe of 100mm bore thickness of 12 SWG of approved make for equalisation tank and MBBR reactor complete all as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm. Note: - Stainless steel pipes shall be used inside MBBR chamber and equalisation tank for supplying air. for outside the tank all pipe shall be MS pipe.
All as per item 3.63 above but for STP No 3 of 800 KLD at Shivaji Lines.
Materials and Labour for providing and fixing Hydraulic Filter Press Pump for filter press 5HP complete with all fittings etc of approved make as specified and directed at site for STP No 1 and 2 of 300 KLD each at Military Farm.
All as per item 3.65 above but for STP No 3 of 800 KLD at Shivaji Lines.
Supplying and spreading a lot of floating media for MBBR reactors in PP construction wagon wheel design having density less than water as approved complete all as specified and as directed at site for STP No 1 and 2 of 300 KLD each at Military Farm. Note: The surface areas of media shall be minimum 500 Sqm/Cum
All as per item 3.67 above but for STP No 3 of 800 KLD at Shivaji Lines.
Painting : Preparing surfaces New or old of any description and girth by cleaning, removing, scrapping loose dirt or dust, lichen, algae, fungus, any organic growth or mould growth etc using stiff or wired brush with chemicals/paint remover etc as required at site, Sandpapering & finishing to obtain even surface and Applying one or more coats of approved paint over a coat of primer of following description to plastered/concrete/steel or iron/ PVC surfaces complete in all respect as specified and directed at site for walls, floors, roof, terraces, Railings, Pipes, steel or iron etc all surfaces of STP complete all as specified and directed at site for STP No 1 of 300 KLD at Military Farm :- (a) Coal Tar Epoxy Paint over one coat of zinc rich epoxy primer to water contact surfaces of MS Tanks. (b) Synthetic Enamel Paint over a Coat of Red Oxide Primer to steel and iron surfaces. (c) Sodium silicate paint using water proofing compound of approved quality as per manufacture’s recommendations for water contact surfaces of concrete/masonry works. (d) Bitumastic or Coal Tar based paint for underground surfaces. (e) Cement based paint of approved colour for exposed concrete/masonry surfaces.
All as per item 3.69 above but for STP No 2 of 300 KLD at Military Farm.
All as per item 3.69 above but for STP No 3 of 800 KLD at Shivaji Lines.
Materials and Labour for providing and injecting Rich Mortar of approved (polymer Modified Cementious Grout) in appropriate proportion into honey comb area using concrete pump with required pressure including cutting of nipples after curing etc. complete all as specified and directed at site for STP No 1 of 300 KLD at Military Farm.
All as per item 3.72 above but for STP No 3 of 800 KLD at Shivaji Lines.
Materials and Labour for providing and Applying Ready Mix PMM for repair surfaces complete all as specified and directed at site for STP No 1 of 300 KLD at Military Farm.
All as per item 3.74 above but for STP No 3 of 800 KLD at Shivaji Lines.
Materials and Labour for drilling and Fixing of teflon nozzle in RC members, including drilling holes:- Drilling 12mm dia 50 to 75 mm deep holes in structural members at the interval of 350mm in staggered manner or as directed by the consultants in RCC structural element. Cleaning of holes: clean the holes by air blower prior to fixing nozzles. Fixing of Nozzles: Insert 12mm dia teflon nozzles in cleaned holes. external end of nozzles to be machine to receive outlet of grouting gun. Fit it inside the holes by applying thixotropic epoxy putty to ensure complete sealing cure the system for min. 12 hrs, cutting of nozzles. Cut the nozzles by chisel after completion of grouting without damages structural elementscomplete all as specified and directed at site for STP No 1 of 300 KLD at Military Farm.
All as per item 3.76 above but for STP No 3 of 800 KLD at Shivaji Lines.
Materials and Labour for providing and laying Plinth Protection 75MM thick in cement concrete (1:3:6) type 'C2' in 1:24 slop over 75mm thick hard core of 40mm graded stone aggregate over well compacted/ rammed earth and shall be finished even and smooth without using extra cement complete all as specified and directed at site for STP No 1 of 300 KLD at Military Farm.
All as per item 3.78 above but for STP No 3 of 800 KLD at Shivaji Lines.
Commissioning and testing of existing sewage treatment plant 300 KLD at Military Farm, type based on principle of aerobic attached growth non clogging randomly moving Bed Bio-Reacter (MBBR) having capacity 300 Cum/day to achive the required parameters including trial run, complete all as specified and directed at site for STP No 1 installed at Military Farm.
All as per item 3.80 above but for STP No 2 installed at Military farm
Commissioning and testing of existing sewage treatment plant 800 KLD at Shivaji Line, type based on principal of aerobic attached growth non clogging randomly moving Bed Bio-Reacter (MBBR) having capacity 800 Cum/day to achive the required parameters including trial run, complete all as specified and directed at site for STP No 3 installed at Shiva ji Lines.
SCHEDULE 'A' Section - IV- Comprehensive Maintenance & Operations of STPs
Providing outsourcing of services for comprehensive maintenance and operations of sewage treatment plants of capacity 300 KLD installed at Military farm (For 335 days)with one FGM (operator) and one helper per shift for STP plant as mentioned below in three shifts (each shift of 8 hours) all as specified and directed by Engineer-in-Charge for STP No 1 installed at Military Farm. Notes (i) One operator and one helper shall be employed by the contractor for operation of the plant in each shift as per time table and as per the direction of the Engineer-in-Charge. Biometric attendance machine be put up in use for daily attendance in shift duty. (ii) Sludge drying beds shall be cleaned regularly. (iii) Dual media bed shall be cleaned regularly. (iv) Contractor shall attend any type of electrical fault in the panel with minor stores i.e. cable jumpers, insulating material, glands packing and grease etc without any extra cost. (v) Time of shift will be as directed by Engineer-in-charge. The operator is bound to performing the duty as per time of shift given by the Engineer-in-charge. No request of contractor will be entertained for change the time of shift . (vi) Daily log sheet as per specimen given by department shall be provided and maintained by the contractor without any extra charges. (vii) First aid box complete with medicines shall be kept at all the installations. (viii) Installation & surrounding area should be kept neat and clean including grass cutting by the contractor's employee and all as directed by Engineer-in-Charge. (ix) For shift duties required to be performed as per duty chart, but if not performed by the operating staff of the contractor for what so ever reason, a penal recovery as mentioned in PSS shall be recovered from the contractor's due. For that purpose proper duty register and attendance register shall be maintained and signed by Engineer-in-Charge every day. (x) The rate quoted by the contractor is deemed to include to consumable items such as cotton waste and minor spares etc.z (xi) SOP shall be provided by the contractor and same shall be pasted at Installation.
All as per item 4.01 abobe but period beyond 335 days ie ( from 336 to 670 days) for STP No 1 installed at Military Farm.
Providing outsourcing of services for comprehensive maintenance and operations of sewage treatment plants of capacity 300 KLD installed at Military farm (For 335 days)with one FGM (operator) and one helper per shift for STP plant as mentioned below in three shifts (each shift of 8 hours) all as specified and directed by Engineer-in-Charge for STP No 2 installed at Military Farm. Notes (i) One operator and one helper shall be employed by the contractor for operation of the plant in each shift as per time table and as per the direction of the Engineer-in-Charge. Biometric attendance machine be put up in use for daily attendance in shift duty. (ii) Sludge drying beds shall be cleaned regularly. (iii) Dual media bed shall be cleaned regularly. (iv) Contractor shall attend any type of electrical fault in the panel with minor stores i.e. cable jumpers, insulating material, glands packing and grease etc without any extra cost. (v) Time of shift will be as directed by Engineer-in-charge. The operator is bound to performing the duty as per time of shift given by the Engineer-in-charge. No request of contractor will be entertained for change the time of shift . (vi) Daily log sheet as per specimen given by department shall be provided and maintained by the contractor without any extra charges. (vii) First aid box complete with medicines shall be kept at all the installations. (viii) Installation & surrounding area should be kept neat and clean including grass cutting by the contractor's employee and all as directed by Engineer-in-Charge. (ix) For shift duties required to be performed as per duty chart, but if not performed by the operating staff of the contractor for what so ever reason, a penal recovery as mentioned in PSS shall be recovered from the contractor's due. For that purpose proper duty register and attendance register shall be maintained and signed by Engineer-in-Charge every day. (x) The rate quoted by the contractor is deemed to include to consumable items such as cotton waste and minor spares etc.z (xi) SOP shall be provided by the contractor and same shall be pasted at Installation.
All as per item 4.03 abobe but period beyond 335 days ie ( from 336 to 670 days) for STP No 2 installed at Military Farm
Supply only sodium Hypochiorite 10% (Liquid Chiorine) to be incopoated for disinfection of treated water all as directed and approved by PM MAP for STP No 1& 2 at Military Farm
Supply only sodium Hypochiorite 10% (Liquid Chiorine) to be incopoated for disinfection of treated water all as directed and approved by PM MAP for STP No 1& 2 at Military Farm.
"Providing outsourcing of services for comprehensive maintenance and operations of sewage treatment plant of capacity 800 KLD installation at Shivaji Lines (For 335 days) with one FGM (operator) and one helper per shift for STP plant in three shifts (each shift of 8 hours) all as specified and directed by Engineer-in-Charge foe STP No 3 installed at Shiva ji Line. Notes (i) One operator and one helper shall be employed by the contractor for operation of the plant in each shift as per time table and as per the direction of the Engineer-in-Charge. Biometric attendance machine be put up in use for daily attendance in shift duty. (ii) Sludge drying beds shall be cleaned regularly. (iii) Dual media bed shall be cleaned regularly. (iv) Contractor shall attend any type of electrical fault in the panel with minor stores i.e. cable jumpers, insulating material, glands packing and grease etc without any extra cost. (v) Time of shift will be as directed by Engineer-in-charge. The operator is bound to performing the duty as per time of shift given by the Engineer-in-charge. No request of contractor will be entertained for change the time of shift . (vi) Daily log sheet as per specimen given by department shall be provided and maintained by the contractor without any extra charges. (vii) First aid box complete with medicines shall be kept at all the installations. (viii) Installation & surrounding area should be kept neat and clean including grass cutting by the contractor's employee and all as directed by Engineer-in-Charge. (ix) For shift duties required to be performed as per duty chart, but if not performed by the operating staff of the contractor for what so ever reason, a penal recovery as mentioned in PSS shall be recovered from the contractor's due. For that purpose proper duty register and attendance register shall be maintained and signed by Engineer-in-Charge every day. (x) The rate quoted by the contractor is deemed to include to consumable items such as cotton waste and minor spares etc. (xi) SOP shall be provided by the contractor and same shall be pasted at Installation."
All as per item 4.07 above but period beyond 335 days ie (336 to 670) for STP No 3 at Shiavji Lines
Supply only sodium Hypochiorite 10% (Liquid Chiorine) to be incopoated for disinfection of treated water all as directed and approved by PM MAP for STP No 3 at Shivaji Lines.
Supply only sodium Hypochiorite 10% (Liquid Chiorine) to be incopoated for disinfection of treated water all as directed and approved by PM MAP for STP No 3 at Shivaji Lines.
M/s Arihant Builders (BID ID -3272840)
RAMJI DAS DHAL CONSTRUCTION PVT LTD (BID ID -3267800)
MAGO CONSTRUCTION PVT. LTD. (BID ID -3267221)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.43 MB
Tenderdocument.pdf
Tender Documents • 4.66 MB
Tenderdocument_2.pdf
Tender Documents • 9.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .