Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 CrAdmitted-Finance HADAPSAR INDUSTRIAL ESTATE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | MAHARASHTRA | 411013 | ₹34.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹35.6 CrAdmitted-Finance | ₹35.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹36.3 CrAdmitted-Finance 802 8TH FLOOR KAILASH BUILDING 26 KASTURBA GANDHI MARG CONNAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹36.3 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Kirloskar Pneumatic Company Limited L1 | TULIP COMPRESSION PRIVATE LIMITED L3 | ATLAS COPCO INDIA LTD, CHICAGO PNEUMATIC COMPRESSOR DIV L2 |
|---|---|---|---|---|---|---|
| 1.00GAS ENGINE DRIVEN 1200 SCMH CNG COMPRESSORS AND ITS ASSOCIATED AUXILIARIES (SUPPLY) | ||||||
| 2.00 | Design, Engineering, Manufacturing, Supply including packaging and forwarding, insurance, custom clearance, handling, loading and unloading at port, delivery & unloading at Client's store /site of Skid mounted gas engine driven 1200 SCMH CNG Compressor Package with explosion proof electric & control panel having suction pressure of 17.5 kg/cm2(g), inlet line pressure range of 16 – 49 kg/cm2(g) (performance range 16 to 19 kg/cm2(g) with discharge pressure 255 kg/cm2(g) with 9 bank Priority panel. The package shall be inclusive of:
a) String test of complete compressor package along with gas engine and accessories at packagers' factory.
b) Special tools & tackles required for erection and commissioning (list of tools & tackles to be furnished by the bidder)
c) Design, Engineering, Manufacturing, Supply including packaging and forwarding, insurance, custom clearance, handling, loading and unloading at port and delivery & unloading at Client's store /site of air compressor of capacity 7.5 KW-, discharge pressure approx 16 kg/cm2g, 1000 water litre capacity air receiver | 15 | Nos. | 1,19,00,000 ₹21.1 Cr | 1,20,00,000 ₹21.2 Cr | 1,20,00,000 ₹21.2 Cr |
| 3.00 | Provision for Overhead Mounting of 3000 / 4500 WL Cascade on Compressor Package as detailed in Technical Specification
Design, engineering, and structural modification of the compressor package frame to allow safe overhead mounting of a 3000 / 4500 Water Litre capacity CNG storage cascade consisting of Type-1 cylinders with a total weight of approximately 9 tons. The modification shall ensure structural stability and safe working platform, including adequate space for operation and maintenance of the mounted cascade. The compressor canopy structure shall be reinforced to bear the weight and load conditions of the cascade, with provision for thermal insulation of the cascade mounting area and proper routing of the engine exhaust line & system to comply with PESO safety norms. The arrangement shall also include a suitable ladder or access system for safe approach to the cascade area. Structural stability certification from the original compressor package manufacturer (OEM) must be provided during the detailed engineering stage, confirming that the modified structure is capable of supporting the load of the cascade. Cascade drawing will be shared by the purchaser during detailed engineering. If any further structural modification is needed at site to accommodate the final cascade design, the same shall be carried out by the bidder during installation within the quoted rates:
Note:
This modification is to be carried out only for those compressor packages where the requirement is specifically intimated by the Client/PMC.
Bidders shall quote for this item based on the additional cost over and above the standard compressor package to provide the required structural provisions and modifications.
Supply and installation of the cascade itself shall be in the scope of the purchaser and is excluded from this item. | 15 | Nos. | 1,70,000 ₹30.1 L | 50,000 ₹8.8 L | 2,50,000 ₹44.3 L |
| 4.00 | Transportation Charges towards the supply of cascade platform for those compressor packages where the requirement is specifically intimated by GAIL Gas or it's Authorized representative | 15 | Nos. | 20,000 ₹3.5 L | 10,000 ₹1.8 L | 1,000 ₹17,700 |
| 5.00TRANSPOTATION OF GAS ENGINE DRIVEN 1200 SCMH CNG COMPRESSORS AND ITS ASSOCIATED AUXILIARIES (SUPPLY) | ||||||
| 6.00 | TRANSPOTATION OF GAS ENGINE DRIVEN 1200 SCMH CNG COMPRESSORS to Bengaluru GA along with ITS ASSOCIATED AUXILIARIES (SUPPLY) | 15 | Nos. | 1,98,000 ₹35.0 L | 9,00,000 ₹1.6 Cr | 3,50,000 ₹62.0 L |
| 7.00Notes : - 1. The quantities may vary considering project requirement. 2. Amount towards transportation shall be payable based on quantities actually transported to various locations and the rate quoted. 3. Considering large size of GA's involving multiple districts/cities in each GA, as per requirement, supplies shall be made to designated stores which may be located anywhere within the GA. Exact location of stores shall be intimated prior to despatch of material. | ||||||
| 8.00RE-TRANSPOTATION SERVICES | ||||||
| 9.00 | In case, Compressor(s) is delivered to stores due to non-readiness of site, loading, Re-transportation from stores to unloading at site within the same city (Refer note of MR) | 5 | Nos. | 1,00,000 ₹5.9 L | 1,000 ₹5,900 | 1,000 ₹5,900 |
| 10.00INSTALLATTON, COMMISSIONING, TESTING ETC. | ||||||
Tender Value
Refer Docs
EMD Value
₹31.4 L
Closing Date
27 Aug 2025, 2:00 pmClosed
RAM SEVAK
GAIL Gas Limited S-44, M S Complex, 3rd Floor, New BEL Road, Bengaluru-560054
PROCUREMENT OF GAS ENGINE DRIVEN CNG COMPRESSORS PACKAGES WITH PROVISION OF OVERHEAD MOUNTING OF STATIONARY CASACADE ON ARC BASIS
2025_GAILG_243519_1
GAIL GAS/BLR/CnP/25-26/30
Open Tender
Miscellaneous Goods
547 days
BENGALURU
As per tender
7 documents required · 7 mandatory
₹0
₹31.4 L
Yes
Through MS Teams
8 Oct 2025
7 Aug 2025
28 Aug 2025
7 Aug 2025
27 Aug 2025
14 Aug 2025
12 Aug 2025
Amount
GAS ENGINE DRIVEN 1200 SCMH CNG COMPRESSORS AND ITS ASSOCIATED AUXILIARIES (SUPPLY)
Design, Engineering, Manufacturing, Supply including packaging and forwarding, insurance, custom clearance, handling, loading and unloading at port, delivery & unloading at Client's store /site of Skid mounted gas engine driven 1200 SCMH CNG Compressor Package with explosion proof electric & control panel having suction pressure of 17.5 kg/cm2(g), inlet line pressure range of 16 – 49 kg/cm2(g) (performance range 16 to 19 kg/cm2(g) with discharge pressure 255 kg/cm2(g) with 9 bank Priority panel. The package shall be inclusive of: a) String test of complete compressor package along with gas engine and accessories at packagers' factory. b) Special tools & tackles required for erection and commissioning (list of tools & tackles to be furnished by the bidder) c) Design, Engineering, Manufacturing, Supply including packaging and forwarding, insurance, custom clearance, handling, loading and unloading at port and delivery & unloading at Client's store /site of air compressor of capacity 7.5 KW-, discharge pressure approx 16 kg/cm2g, 1000 water litre capacity air receiver
Transportation Charges towards the supply of cascade platform for those compressor packages where the requirement is specifically intimated by GAIL Gas or it's Authorized representative
TRANSPOTATION OF GAS ENGINE DRIVEN 1200 SCMH CNG COMPRESSORS AND ITS ASSOCIATED AUXILIARIES (SUPPLY)
TRANSPOTATION OF GAS ENGINE DRIVEN 1200 SCMH CNG COMPRESSORS to Bengaluru GA along with ITS ASSOCIATED AUXILIARIES (SUPPLY)
Notes : - 1. The quantities may vary considering project requirement. 2. Amount towards transportation shall be payable based on quantities actually transported to various locations and the rate quoted. 3. Considering large size of GA's involving multiple districts/cities in each GA, as per requirement, supplies shall be made to designated stores which may be located anywhere within the GA. Exact location of stores shall be intimated prior to despatch of material.
RE-TRANSPOTATION SERVICES
In case, Compressor(s) is delivered to stores due to non-readiness of site, loading, Re-transportation from stores to unloading at site within the same city (Refer note of MR)
INSTALLATTON, COMMISSIONING, TESTING ETC.
Installation, commissioning & Field performance test of Compressor Package including air compressor system at site.
Total amount for Supply, Inland Transportation, Re-TRANSPOTATION SERVICES and INSTALLATTON, COMMISSIONING, TESTING ETC (inclusive of taxes) based on quoted price
CHARGES FOR OPERATIONS OF CNG COMPRESSOR PACKAGE Bidder to ensure the minimum wages of Semi-skilled personnel for construction industries per day (in Rupees) of respective state/ Central (whichever is higher).
Lumpsum Operation charges per Compressor package for 1st year i.e. during Warranty period (Rates per package for 3 shifts X 365 days) Note: Minimum charges towards deployment of Operator per CNG compressor package per year for 03 shifts is Rs. 11,24,000/- . Bidder to quote either the minimum charges as mentioned above i.e. Rs. 11,24,000/- or higher
Lumpsum Operation charges per compressor package for 2nd year (Rates per package for 3 shifts X 365 days) Note: Minimum charges towards deployment of Operator per CNG compressor package per year for 03 shifts is Rs. 11,63,000/- . Bidder to quote either the minimum charges as mentioned above i.e. Rs. 11,63,000/- or higher
Operation charges per package for 3rd year (Rates per package for 3 shifts X 365 days) Note: Minimum charges towards deployment of Operator per CNG compressor package per year for 03 shifts is Rs. 12,04,000/- . Bidder to quote either the minimum charges as mentioned above i.e. Rs. 12,04,000/- or higher
Operation charges per package for 4th year per shift of 8hrs (Rates per package for 3 shifts X 365 days) Note: Minimum charges towards deployment of Operator per CNG compressor package per year for 03 shifts is Rs. 12,46,000/- . Bidder to quote either the minimum charges as mentioned above i.e. Rs. 12,46,000/- or higher
LUMP SUM ANNUAL REPAIR & COMPREHENSIVE MAINTENANCE ETC.
Lump sum repair & comprehensive maintenance charges (excluding the scope covered under warrantee) per Compressor Package including air compressor for 1st year during warrantee period in all Geographical Areas of GAIL Gas inclusive of all manpower, spare parts, lubricants and consumables etc. (Charges Per packages per year) Note: The quoted percentage (%) rate for one compressor package for one year must be equal to or more than 4.25% of unit price of MR Item no. A.1 quoted by the bidder.
Lump sum repair & comprehensive maintenance charges (including major overhaul) per Compressor Package including air compressor in all Geographical Area’s under GAIL Gas periphery inclusive of all manpower, spare parts, lubricants and consumables etc. For the 2nd year. (Charges Per packages per year) Note: The quoted percentage (%) rate for one compressor package for one year must be equal to or more than 5.0 % of unit price of MR Item no. A.1 quoted by the bidder.
Lump sum repair & comprehensive maintenance charges (including major overhaul) per Compressor Package including air compressor in all Geographical Area’s under GAIL Gas periphery inclusive of all manpower, spare parts, lubricants and consumables etc. For the 3rd year. (Charges Per packages per year) Note: The quoted percentage (%) rate for one compressor package for one year must be equal to or more than 5.25% of unit price of MR Item no. A.1 quoted by the bidder.
Lump sum repair & comprehensive maintenance charges (including major overhaul) perCompressor Package including air compressor in all Geographical Area’s under GAIL Gasperiphery inclusive of all manpower, spare parts,lubricants and consumables etc. For the 4th year (Charges Per packages per year) Note: The quoted percentage (%) rate for one compressor package for one year must be equal to or more than 5.50% of unit price of MR Item no. A.1 quoted by the bidder.
Total Price for Supply, Provision of Cascade on Canopy Top, Tansportation of such provision to site, Installation/Erection, Testing, Commissioning, Inland Transportation, Re-transportation including charges for OPERATIONS & COMPREHENSIVE MAINTENANCE for four (04) years (inclusive of taxes)
Value of Gas Loss & Gas Consumption
A. Package Gas Loss F = (G x H x I x N x W)/100 Where, F = Loading amount in Rs. G = Vent/Leakage rate quoted in percentage for respective year (e.g. if a bidder wants to quote 0.1% then he has to quote 0.1 in the cell) H = Cost of Natural Gas per Kg @ Rs. 77/‐ per kg I = Avg. numbers of running hours per year i.e. @ 3650 hours N = Number of CNG Compressors W = 903 Kg/hr for 1200 SCMH Note- 1. Bidder to quote 'G = Vent/Leakage rate in percentage' (without affixing % symbol) 2. In case the Package loss is quoted more than 1% of suction capacity gas consumption, the bid shall be rejected. 3. The value quoted by bidder should be same as mentioned in 'Gauranteed parameters' submitted with bid documents.
Package Gas Loss for 1st year
Package Gas Loss for 2nd year
Package Gas Loss for 3rd year
Package Gas Loss for 4th year
B. Engine Fuel Consumption: F = G x H x I x N Where, F = Loading amount in Rs. G = Bidder’s Gas consumption rate quoted in Kg/hr for every 1200 SCMH (903Kg) of CNG for respective year. produced H = Cost of Natural Gas per Kg @ Rs. 77/‐ per kg I = Avg. no. of running hours per year i.e. @ 3650 hours N = Number of Compressor = 15 Numbers 1) Fuel Consumption quoted by the bidder under guaranteed parameters shall lie within the range of 30 to 33 Kg/hr for 1200 SCMH. No benefit will be given below 30 Kg/hr for 1200 SCMH. 2) In case the fuel consumption quoted by the bidder exceeds the upper limit i.e. 33 Kg/hr for 1200 SCMH the bid shall be rejected. 3) Bidder to quote ''Bidder’s Gas consumption rate in Kg/hr for every 1200 SCMH(903 Kg/hr) of CNG produced" 4) The value quoted by bidder should be same as mentioned in 'Gauranteed parameters' submitted with bid documents. [Only the incremental number over & above 30 for Fuel Consumption quoted by the bidder shall be taken into consideration for evaluation] e.g. if a bidder quotes 30, then there will be “Zero” loading.
Engine Fuel Consumption for 1st year
Engine Fuel Consumption for 2nd year
Engine Fuel Consumption for 3rd year
Engine Fuel Consumption for 4th year
Net Present Value (NPV) of Annual Operation, Comprehensive Maintenance, Gas Loss & Engine Fuel Consumption including GST for four years based on NPV CALCULATION
Total Price for Supply, Installation/Erection, Testing, Commissioning, Inland Transportation, Re-transportation including charges for OPERATIONS & COMPREHENSIVE MAINTENANCE for four (04) years (inclusive of taxes) with NPV, Loading towards Gas Loss with NPV and loading towards Engine Fuel Consumption with NPV (A+B+C+D+E+F+G) is given at row below in Cell BB49.
ATLAS COPCO INDIA LTD, CHICAGO PNEUMATIC COMPRESSOR DIV (BID ID -891700)
TULIP COMPRESSION PRIVATE LIMITED (BID ID -892445)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_279091.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid