| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Finance 44 NEW AMARANJIPURAM TONDIARPET CHENNAI 81 | CHENNAI | CHENNAI | TAMIL NADU | 600081 | L1 | Admitted-Finance | |
| 2 | L2₹11.0 L+₹19,533 (1.81%)Admitted-Finance NO 15 1 31 1 KASI GARDEN 3RD LANE ROYAPURAM CHENNAI 13 | CHENNAI | CHENNAI | TAMIL NADU | 600013 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.G. ENTERPRISES L2 | NERINA ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling and cutting including cost of consumables and T&P's hire charges etc., | 1 | activity | 15,027 ₹15,027 | 14,758 ₹14,758 Lowest |
| 2.00 | Charges for lifting of chain link assembly from -12 mtrs to 0 mtrs and inspection suitably rectification including cost of consumables and T&P's hire charges etc., | 1 | activity | 41,627 ₹41,627 | 40,883 ₹40,883 Lowest |
| 3.00 | Charges for removing of wheels and plumber block from shaft and inspection suitably rectification including cost of consumables and T&P's hire charges etc., | 1 | activity | 12,335 ₹12,335 | 12,115 ₹12,115 Lowest |
| 4.00 | Charges for assembling of wheels and plumber block with shaft including cost of consumables and T&P's hire charges etc., | 1 | activity | 12,335 ₹12,335 | 12,115 ₹12,115 Lowest |
| 5.00 | Charges for lifting and shifting the boot section from 0 mtrs to -12 mtrs including cost of consumables and T&P's hire charges etc., | 1 | activity | 57,612 ₹57,612 | 56,584 ₹56,584 Lowest |
| 6.00 | Charges for welding of guides in travelling water screen including cost of consumables and T&P's hire charges etc., | 1 | activity | 18,019 ₹18,019 | 17,697 ₹17,697 Lowest |
| 7.00 | Charges for maintaining water level cutting the links plates and both boot section and head frame side and removal of head mouting including cost of consumables and T&P's hire charges etc., | 1 | activity | 22,340 ₹22,340 | 21,947 ₹21,947 Lowest |
| 8.00 | Charges for removal of baskets with link plate from suction tunnel and dismantling of basket, shim plate, link plate, nylon roller, bushes spacers etc., including cost of consumables and T&P's hire charges etc., | 1 | activity | 29,113 ₹29,113 | 28,593 ₹28,593 Lowest |
| 9.00 | Charges for maintaining water level, providing platform at -12mtrs supporting of boot section cutting the existing angles and surface finish by grinding including cost of consumables and T&P's hire charges etc., | 1 | activity | 5,537 ₹5,537 | 5,438 ₹5,438 Lowest |
| 10.00 | Charges for connecting of link plates and fixing of head shaft sprockets and assembly of all basket check plate with link plates and checking and commissioning including cost of consumables and T&P's hire charges etc., | 1 | activity | 20,161 ₹20,161 | 19,801 ₹19,801 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,600
Closing Date
25 Sept 2026, 2:00 pmClosed
SE M1
NCTPS II
NCTPS-II-M-I-CA-CWPH-Unit-II Overhauling of Travelling water screen 2E and renewal replacement of defective parts with new or reconditioned spares after minor rectification, if necessary and thorough cleaning of stop log gate guide
2026_EB_704234_1
NCTPS_II_UII_Spec_72_26_27
Open Tender
Maintenance Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,600
Yes
6 Oct 2026
12 Sept 2026
26 Sept 2026
12 Sept 2026
25 Sept 2026
12 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dismantling and cutting including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 2 | Charges for lifting of chain link assembly from -12 mtrs to 0 mtrs and inspection suitably rectification including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 3 | Charges for removing of wheels and plumber block from shaft and inspection suitably rectification including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 4 | Charges for assembling of wheels and plumber block with shaft including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 5 | Charges for lifting and shifting the boot section from 0 mtrs to -12 mtrs including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 6 | Charges for welding of guides in travelling water screen including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 7 | Charges for maintaining water level cutting the links plates and both boot section and head frame side and removal of head mouting including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 8 | Charges for removal of baskets with link plate from suction tunnel and dismantling of basket, shim plate, link plate, nylon roller, bushes spacers etc., including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 9 | Charges for maintaining water level, providing platform at -12mtrs supporting of boot section cutting the existing angles and surface finish by grinding including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
| 10 | Charges for connecting of link plates and fixing of head shaft sprockets and assembly of all basket check plate with link plates and checking and commissioning including cost of consumables and T&P's hire charges etc., | 1 | activity | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_846424.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .