Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.7 L+₹79,447.10 (11.5%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.7 L+₹81,583.36 (11.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹7.8 L+₹89,048.01 (12.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance NO 107 KAMATCHI AMMAN KOVIL STREET EEDAIYAMBUNDI VILLAGE THEVANAMPATTU POST TIRUVANNAMALAI TALUK AND DISTRICT 606 802 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606802 | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Certificates not Available |
| Sl No | Description | Qty | Unit | JAYARAMAN BUILDERS L2 | T Manoharan L4 | Lalitha.S L3 | V.KUMAR L1 |
|---|---|---|---|---|---|---|---|
| 1.00Maintanance and Pot Holes Repairs of Arcot Tindivanam Road to Aruvadaithangal Km 0/0-2/0 (R-61) | |||||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 2,880 | Sqm | 6.36 ₹18,316.8 | 3 ₹8,640 Lowest | 3.5 ₹10,080 | 6 ₹17,280 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 38.16 | Cu.m | 300 ₹11,448 | 100 ₹3,816 Lowest | 110 ₹4,197.6 | 140 ₹5,342.4 |
| 4.00 | Collection and supply of Girrty gravel for side berms and labour charges for filling
etc complete | 15.9 | Cu.m | 2,200 ₹34,980 | 250 ₹3,975 Lowest | 280 ₹4,452 | 479 ₹7,616.1 |
| 5.00 | Providing and laying TACK COAT over the WMM surface (treated with primer) using 3 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 397.5 | Sqm | 8 ₹3,180 Lowest | 27 ₹10,732.5 | 35 ₹13,912.5 | 27 ₹10,732.5 |
| 6.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 9.89 | Sqm | 600 ₹5,934 Lowest | 12,500 ₹1,23,625 | 13,000 ₹1,28,570 | 10,500 ₹1,03,845 |
| 7.00Maintanance and Pot Holes Repairs of Sembur , Theyyar Road to Srirangarajapuram via Mudalur Km 0/6-6/600 (R-14) | |||||||
| 8.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 13,860 | Sqm | 6.36 ₹88,149.6 | 6 ₹83,160 | 3.5 ₹48,510 Lowest | 6 ₹83,160 |
| 9.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 243 | Cu.m | 300 ₹72,900 | 100 ₹24,300 Lowest | 110 ₹26,730 | 130 ₹31,590 |
| 10.00 | Collection and supply of Girrty gravel for side berms and labour charges for filling
etc complete | 16.56 | Cu.m | 2,200 ₹36,432 | 250 ₹4,140 Lowest | 280 ₹4,636.8 | 350 ₹5,796 |
Tender Value
₹9.1 L
EMD Value
₹9,080
Closing Date
12 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer Thellar
Block Development Officer Thellar
Maintanance and Pot Holes Repairs of Arcot Tindivanam Road to Aruvaidaithangal Maintanance and Pot Holes Repairs of Sembur Theyyar Road to Srirangarajapuram via Mudalur Thellar Panchayat Road Maintenance works in Thellar Panchayat
2026_RDTN_722202_1
5764/2025/A11 12.10.2026 THE1
Open Tender
Civil Works
Lump-sum
90 days
Block Development Office Thellar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,080
Yes
13 Nov 2026
5 Nov 2026
12 Nov 2026
5 Nov 2026
12 Nov 2026
5 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintanance and Pot Holes Repairs of Arcot Tindivanam Road to Aruvadaithangal Km 0/0-2/0 (R-61) | - | - | - | - |
| 2 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 2,880 | Sqm | - | - |
| 3 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 38.16 | Cu.m | - | - |
| 4 | Collection and supply of Girrty gravel for side berms and labour charges for filling
etc complete | 15.9 | Cu.m | - | - |
| 5 | Providing and laying TACK COAT over the WMM surface (treated with primer) using 3 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 397.5 | Sqm | - | - |
| 6 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 9.89 | Sqm | - | - |
| 7 | Maintanance and Pot Holes Repairs of Sembur , Theyyar Road to Srirangarajapuram via Mudalur Km 0/6-6/600 (R-14) | - | - | - | - |
| 8 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 13,860 | Sqm | - | - |
| 9 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 243 | Cu.m | - | - |
| 10 | Collection and supply of Girrty gravel for side berms and labour charges for filling
etc complete | 16.56 | Cu.m | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
TenderDocument.pdf
Tender Documents • 0.78 MB
BOQ_867231.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .