| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC accepted |
| 2 | L2₹5.4 LRejected-AOC N A | PALWAL | HARYANA | 121004 | ₹5.4 L | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | RISIPAL SINGH L2 | VED PRAKASH L1 |
|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Dismantling brick work and including stacking as directed by the engineer-in-charge with in a distance of 60 meter (200 f+B5:B22eet). | 180.57 | M² | 592 ₹1.1 L | 550 ₹99,313.50 |
| 1.02 | Dismantling old plaster including raking out joints and disposal of debris with in a distance of 60 meter directed by the engineer-in-charge. | 10.33 | M³ | 36 ₹371.88 | 34 ₹351.22 |
| 1.03 | Earth work in excavation in foundation ordinary soil including lift upto 1.50m and lead upto 30m & also i/c backfilling, watering and ramming of excavated earth in to the trenches, cost of all material, T&P etc. complete. | 15.01 | M³ | 132 ₹1,981.32 | 125 ₹1,876.25 |
| 1.04 | C.C. (1:3:6) in base in cement, coarse sand, aggregates including all cost of material, labour, T&P etc. complete. | 2.5 | M³ | 5,107 ₹12,767.50 | 4,500 ₹11,250 |
| 1.05 | Ist class brick work in (1:5) in Cement Mortar including all cost of material, labour, T&P etc. complete. | 15.14 | M³ | 4,800 ₹72,672 | 4,800 ₹72,672 |
| 1.06 | 12mm thick plaster 1:4 C.M. i/c all cost of labour, material T&P. | 225.93 | M² | 157 ₹35,471.01 | 150 ₹33,889.50 |
| 1.07 | Providing cement primer on old/new surface i/c cost of all material, labour T & P etc. Complete. | 189.94 | M² | 22 ₹4,178.68 | 20 ₹3,798.80 |
| 1.08 | Centering and Shuttering for R.C.C. work including all cost of material, labour, T&P etc. complete. ( including Mummty) | 103.36 | M² | 562 ₹58,088.32 | 550 ₹56,848 |
| 1.09 | R.C.C. (1:1.5:3) including all cost of material, labour, T&P etc. but excluding cost of steel bending,binding complete. | 7.67 | M³ | 632 ₹4,847.44 | 6,530 ₹50,085.10 |
Tender Value
₹5.4 L
EMD Value
₹11,000
Closing Date
13 Nov 2025, 4:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER AFZALGARH IRRIGATION DIVISION DHAMPUR
LOT03 Repairing of Tindal Room at Sukhro Weir in Distt Bijnor.
2025_UPIDC_1086669_32
04/EEAID/2025-26
Open Tender
Civil Works
60 days
DHAMPUR
AS PER NIT
2 documents required · 2 mandatory
₹266
₹11,000
12 Mar 2026
8 Nov 2025
13 Nov 2025
8 Nov 2025
13 Nov 2025
8 Nov 2025
Amount
Laying and Jointing PVC Pipe. Heading
Dismantling brick work and including stacking as directed by the engineer-in-charge with in a distance of 60 meter (200 f+B5:B22eet).
Dismantling old plaster including raking out joints and disposal of debris with in a distance of 60 meter directed by the engineer-in-charge.
Earth work in excavation in foundation ordinary soil including lift upto 1.50m and lead upto 30m & also i/c backfilling, watering and ramming of excavated earth in to the trenches, cost of all material, T&P etc. complete.
C.C. (1:3:6) in base in cement, coarse sand, aggregates including all cost of material, labour, T&P etc. complete.
Ist class brick work in (1:5) in Cement Mortar including all cost of material, labour, T&P etc. complete.
12mm thick plaster 1:4 C.M. i/c all cost of labour, material T&P.
Providing cement primer on old/new surface i/c cost of all material, labour T & P etc. Complete.
Centering and Shuttering for R.C.C. work including all cost of material, labour, T&P etc. complete. ( including Mummty)
R.C.C. (1:1.5:3) including all cost of material, labour, T&P etc. but excluding cost of steel bending,binding complete.
Supply and placing of reinforcement including all cost of reinforcement, bending, binding, cost of bending wire etc. complete.
C.C. (1:2:4) in base in cement, coarse sand, aggregates including all cost of material, labour, T&P etc. complete.
Providing and fixing of steel gate i/c all cost of labour, material T&P including fitting. including fitting.
R.B.M. below interlocking C.C. Tiles.
Providing and Laying 80 mm thick I shaped interlocking CC tiles i/c all cost of labour, material T&P.as directed by Engineer-in-charge.
Providing and Laying 5mm thick ordinary Sand under interlocking CC tiles i/c all cost of labour, material T&P.as directed by Engineer-in-charge.
Providing cement primer on old/new surface i/c cost of all material, labour T & P etc. Complete.
Finishing wall with one coat of water proof cement paint weather coat of approved quality on previously new surface with this paint to give an even shade including supply of all materials, labour, Tools and plants etc. required for proper completion of the work.
Applying primer coat over new Steel or other metal surface after paint including preparing wood work surface including preparing the surface by thoroughly cleaning oil grease dirt and other foreigh matter and scoured with wire brushes fine steel/wood scrappers sand papering and knotting including coat of all and supply of all materials,labour and T&P etc. required for proper completion of the work.
Painting two coat over Priming coat (But excluding cost of priming coat) on wood or Steel or other metal surface with superior synthatic enamel paint of standard make brushing to give an even shade and finished and including cleaning the surface all dirt dust and other foreign matter sand papering and striping including cost matter and scoured with wire brushes fine steel/wood scrappers sand papering and knotting including coat of all and supply of all materials,labour and T&P etc. required for proper completion of the work.
Providing and fixing 50 mm dia P.V.C. vent pipe i/c all fitting such as sockit, Tee, Bend and etc.and labour T&P etc.
Providing and fixing 100 mm dia P.V.C. vent pipe i/c all fitting such as sockit, Tee, Bend and etc.and labour T&P etc.
Providing and fixing white vitreous china orissa pattern W.C. pan of size 580x440 mm with P/S trap, 10 lit low level white P.V.C. flushing cistern with manually controlled device with all fitting i/c all material, labour T&P etc .
RISIPAL SINGH (BID ID -5672833)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_1999227.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid