Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹7.7 L+₹7,073.40 (0.92%)Rejected-AOC PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K S CONSTRUCTION L2 | S & G CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Labour charges for dismantling of existing GI towers without damage to tower members, moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete. | 13 | MT | 15,400 ₹2,00,200 | 15,360 ₹1,99,680 Lowest |
| 2.00 | Labour charges for dismantling of existing 6nos. Panther conductor, moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete | 1 | Span | 54,000 ₹54,000 | 53,000 ₹53,000 Lowest |
| 3.00 | Labour charges for GI Earth wire moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete. | 1 | Span | 5,600 ₹5,600 | 5,500 ₹5,500 Lowest |
| 4.00 | Labour charges for dismantling of existing 7 Nos. of 90KN Suspension insulators, moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete | 9 | Sets | 320 ₹2,880 | 300 ₹2,700 Lowest |
| 5.00 | Labour charges for dismantling of existing 8 Nos of 120 KN Tension insulators, moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete | 12 | Sets | 550 ₹6,600 | 500 ₹6,000 Lowest |
| 6.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. (SS20B) | 16.44 | Cum | 160 ₹2,630.4 | 150 ₹2,466 Lowest |
| 7.00 | M Sand filling including cost of M sand, filling charges, labour for watering and consolidation, leads and lift etc. complete. | 5.14 | Cum | 2,000 ₹10,280 Lowest | 2,000 ₹10,280 Lowest |
| 8.00 | Plain cement concrete 1:3:6, 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 7.64 | Cum | 7,000 ₹53,480 Lowest | 7,000 ₹53,480 Lowest |
| 9.00 | Providing RCC 1:1.5:3 using 20 mm HBG metal without form work for foundation raft including cost of all material, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. | 10 | Cum | 9,500 ₹95,000 Lowest | 9,500 ₹95,000 Lowest |
| 10.00 | Providing PCC 1:2:4 using 20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects upto GL | 0.86 | Cum | 8,000 ₹6,880 | 7,500 ₹6,450 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,110
Closing Date
18 Jul 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2025_EB_579064_1
OT-34/2025-26 of GCC-II
Open Tender
Civil Works
Works
120 days
Pallikaranai
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹7,110
Yes
4 Sept 2025
7 Jul 2025
19 Jul 2025
7 Jul 2025
18 Jul 2025
7 Jul 2025
Amount
Labour charges for dismantling of existing GI towers without damage to tower members, moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete.
Labour charges for dismantling of existing 6nos. Panther conductor, moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete
Labour charges for GI Earth wire moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete.
Labour charges for dismantling of existing 7 Nos. of 90KN Suspension insulators, moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete
Labour charges for dismantling of existing 8 Nos of 120 KN Tension insulators, moving away from site in as is where is condition and devoluting to Stores including all labour charges, lead, lift etc. complete
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. (SS20B)
M Sand filling including cost of M sand, filling charges, labour for watering and consolidation, leads and lift etc. complete.
Plain cement concrete 1:3:6, 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
Providing RCC 1:1.5:3 using 20 mm HBG metal without form work for foundation raft including cost of all material, labour, lead, lift, etc., complete but excluding cost of steel reinforcement.
Providing PCC 1:2:4 using 20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects upto GL
Providing PCC 1:2:4 using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects above GL
Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete. (Without form work)
Plastering with CM 1:3-12mm thick for wall both interior and exterior faces including cost of all materials lead lift etc complete.
Colour washing two coats using white cement mixed with approved colouring pigments, including cost of all materials, labour, lead, lift, etc. complete.
Fabrication and supplying of 20mm dia foundation Bolt and nut of length 1.20m,threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 2 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of template, all material, labour, lead, lift etc., complete
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Clearing juliflora jungle with uprooting including all labour lead lift etc., complete.
Supplying and spreading of quarry dust for yard area including cost of quarry dust, labour for consolidation, lead, lift, etc. complete.
Supplying and spreading of 12mm HBG metal for yard area including cost of all material, labour for consolidation, lead, lift, etc. complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K S CONSTRUCTION (BID ID -1406101)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .