| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78.9 LAdmitted-Finance | -5.06% | ₹78.9 L | L1 | Admitted-Finance |
| 2 | L2₹80.1 L+₹1.3 L (1.59%)Admitted-Finance | -3.55% | ₹80.1 L+₹1.3 L (1.59%) | L2 | Admitted-Finance |
| 3 | L3₹80.2 L+₹1.3 L (1.71%)Admitted-Finance | -3.44% | ₹80.2 L+₹1.3 L (1.71%) | L3 | Admitted-Finance |
| 4 | L4₹80.4 L+₹1.5 L (1.91%)Admitted-Finance | -3.25% | ₹80.4 L+₹1.5 L (1.91%) | L4 | Admitted-Finance |
Tender Value
₹83.1 L
EMD Value
₹1.7 L
Closing Date
26 May 2026, 4:00 pmClosed
Executive Eng. II
Construction office,P.U. Campus
Repair of Roof of Department of Chemical Engineering and Technology in P.U. Campus, Sector 14, Chandigarh.
2026_PU_92149_1
6843/EE/Mtc.
Open Tender
Civil Works
Percentage
150 days
P.U. Campus, Sector 14
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.7 L
29 May 2026
6 May 2026
28 May 2026
6 May 2026
26 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | Carriage of building rubbish material by mechanical/mannual transport including loading & unloading stacking upto 2km etc.The work includes removal of malba/rubbish/debris/mixed earth/concrete/plaster from site and stacking at picking point upto 50mtr lead. Complete in all respect to the entire satisfaction of the Engineer in Charge. (Ref:- 1.1.18) | 585 | Cum | 178 | ₹1,04,130 |
| 2Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. up to floor five level, excluding the cost of centering, shuttering and finishing : | |||||
| 2.01 | 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (Ref:- 4.2.3) | 6.91 | Cum | 10,138 | ₹70,053.58 |
| 3Painting top of roofs with bitumen of approved quality at 17Kg per 10 sqm impregnated with a coat of coarse sand at 60 cudm per 10 sqm including cleaning the slab surface with brushes and finally with apiece of cloth lightly soaked in Kerosene oil complete: | |||||
| 3.01 | With residual type petroleum bitumen of penetration 80/100 (Ref:- 12.15.1) | 4,659.86 | Sqm | 212 | ₹9,87,890.32 |
| 4Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design. | |||||
| 4.01 | In 75x75mm deep chase (Ref:- 12.21.1) | 737.01 | Mtr | 241 | ₹1,77,619.41 |
| 5 | Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1mx1mx400micron, finished with 12mm cement plaster 1:3 (1 cement : 3 coarse sand) with integral water proofing compound and a coat of neat cement rounding the edge sand making and finishing the outlet complete. (Ref:- 12.22) | 85 | Nos | 276 | ₹23,460 |
| 620 mm cement plaster of mix : | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.52 MB
BOQ_112759.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .