| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC NO 9 BYRAVESHWARA INDUSTRIAL ESTATE ANDRAHALLI MAIN ROAD NEAR PEENYA 2ND STAGE BENGALURU 560 091 | BENGALURU URBAN | KARNATAKA | 560091 | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹22.9 L+₹3.5 L (17.9%)Rejected-Finance WZ 1000 NANGAL RAYA PANKHA ROAD SOUTH WEST DELHI DELHI 110046 | DELHI | SOUTH WEST DELHI | DELHI | 110046 | L2 | Rejected-Finance BEING NOT LOWEST | |
| 3 | L3₹23.8 L+₹4.4 L (22.5%)Rejected-Finance | L3 | Rejected-Finance BEING NOT LOWEST | |
| 4 | L4₹24.5 L+₹5.1 L (26.0%)Rejected-Finance | L4 | Rejected-Finance BEING NOT LOWEST | |
| 5 | L5₹28.3 L+₹8.9 L (45.6%)Rejected-Finance RZ 212F D BLOCK RAJ NAGAR PART II PALAM COLONY NEW DELHI 110077 | SOUTH WEST | DELHI | 110077 | L5 | Rejected-Finance BEING NOT LOWEST |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
14 Jul 2021, 6:00 pmClosed
ARJUN PATRO,IDSE
GE U ELECTRIC SUPPLY,DELHI CANTT
Filtration dehydration along with re winding of transformer and connected HT repair to OCB/VCB panels of 35 Inf Brg Upper Shankar Vihar Mahipalpur Enclave Bhana Singh OTM I II III HQ SFC NIDM CGDA Tarapur Enclave and Rangpuri Area in the A
2021_MES_453189_1
GE ELECT/D-37/2021-2022
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE U ELECTRIC SUPPLY
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE U ELECTRIC SUPPLY
₹70,000
Yes
14 Sept 2021
23 Jun 2021
16 Jul 2021
24 Jun 2021
14 Jul 2021
9 Jul 2021
Amount
ON Line Filtration / dehydration of 11KV/440V Step down distrubution transformer oil through filtration plant to improve the dielectric strength/insulation valve of the transformer oil upto 60 KV at a gap of min 2.5 mm of electrodes.
The contractor will carry out the dehydration on line without effecting the power supply to the users and under other unaoidable events only contractor shall take shut down orders in working before commencement of the work from Engineer-in-charge.
The contractor shall ensure no wastage at transformer oil
The Contractor is solely responsible for any damage to the transformer during filtration operations. He is responsible for making good any damage to the transformer at his own cost without any extra cost to the department
The contractor shall ensure that the conservator tanks are full to its level before starting the dehydration.
The di-electric strenght of oil shall be tested before & after filtration. Test results shall be submitted to engineer-in-charge
Note : Oil for Top up will be measure and paid seperatly under respective items.
Material and labour for preparation of old painted surfaces of floor mounted indoor/outdoor type transformer from 100 KVA to 500 KVA capacity by cleaning/rubbing with course cloth wire brushes to remove dust deposits oil grease and repainting by applying one coat of spray paint with synthetic enamel paint of approved colour without disturbing/damaging the electrical net work system/equipment including making of capacity /rating /incoming outgoing details in capital english alphabet of size all as specified and directed.
All as per item No 2 here in above but from 630 KVA to 1000KVA
Supply and fix silica gel breather assembly complete with breather unit and silica gel including connecting with proper rubberised gasket and necessary fittings GI fittings for fixing/assembling upto 1000KVA transformer complete by removing the unserviceable silica gel breather assembly all as specified and directed. Make : Patel Electrical Industries or equivalent recommende by OEM
Supply, filling and for topping up the transformer with new transformer oil duly filtered with filtration plant. Note : (a) The transformer oil shall be type EHV confirming to IS - 3351983 (b) Mineral oil grade shall be used. (c ) The transformer oil should have a high dielectric strength not less than 60 KV at a gap of min 2.5 mm of electrodes.
Taking down burnt defective drawnout/inlet Valve (Brass any size) and supply and fixing new drawn out/Inlet valve (brass as per existing size) suitable for any make of 100 to 500KVA Transformer all as specified and directed
All as per item No 6 here in before but from 630 KVA to 1000KVA
Taking down defective unserviceable LT bush porcelain insulator and supply and fix news LT bush porcelain insulator with oil seal and Copper stud for transformer outdoor/indoor up to 500KVA all as specified and directed
All as per item No 8 here in before but from 630 KVA to 1000KVA
Taking down defective unserviceable HT bush porcelain insulator and supply and fix news HT bush porcelain insulator with oil seal and Copper stud for transformer outdoor/indoor up to 500 KVA all as specified and directed
All as per item No 10 here in before but from 630 KVA to 1000KVA
Isolating the HT supply of transformer, disconnecting HT and LT connections of transformer by opening clamps, bus bar extension and isolating the cables from transformer, outdoor/Indoor of 250 to 1000 KVA capacities, checking of transformer pressure release valve, oil condition and carrying out tests such as HV/LV megger test, ratio test, magnetic balance test, short circuit test including opening theinspection cover/top lid after drain out of oil as required to check the lead condition from winding to bus rods including necessary soldering/jointing etc, and charging of transformer and making all necessary connections / assembly & control circuits all as specified and directed. Note :- Test results shall be submitted through the Engineer-in-charge to Accepting Officer.
Isolating the HT supply of transformer, disconnecting HT and LT connections of transformer by opening clamps, bus bar extension and isolating the cables from transformer, outdoor/Indoor of 250 to 500 KVA capacities, checking of transformer pressure release valve, oil condition, and Taking down unserviceable /perished sheet gasket (Cork sheet), Supply and fix synthetic rubberized cork sheet gasket 6mm 2' x 3' size sheet thick for top cover HT/LT bushes, along with Busings O rings/ Packing and tighting all the bushings and top cover to avoid any oil leakages complete all as specified and directed
All as per item No 13 here in before but of capacity 630 KVA to 1000KVA
Lifting of transformer core of capacity 160 to 750 KVA and keeping the core inside oven chamber to removing of moisure and increasing of the insulation value of core and drying the core assembly for minimum 3 days at a temp of 120oC Note :- (a) Cost for lifting/lowering the core of transformer by crane is inclusive. (b) Labour for fixing the connection/removal of connection inside the heating chamber is inclusive. (c) Power consumption for heating core for improving insulation value is inclusive. (d) Temperature 120oC to be maintained and inclusive in rate quoted.
Disconnecting defective out door/indoor transformers, 11KV/433 V of various capacities of 315KVA to to 500 KVA from HT/LT sides taking down transformer oil completely, storing oil in suitable container (to be provided by the contractor), lifting the top cover and core assembly carefully and checking the conditions, refilling the transformer oil completely after necessary repairs, re-taking core assembly and fixing the top cover and painting to transformer complete all as specified and directed.
Note (a) Rewinding of transformer shall be measured and paid separately. (b) In case of major repairs/replacement in transformer, which can not be undertaken at site, the transformer shall be shifted to civil workshop and winding and connected accessories (complete transformer) (c) Dismantling of core and repairs shall be measured and paid separately. (d) Shifting of transformer shall be measured and paid separately. (e) Complete gaskets shall be replaced by the contractor rate deemed to be inclusive.
(f) Repairs of the transformer has to be carried out at the work shop having adequte necessary T&P for carring out repairs along with NABL Certified Calibtared instruments for carring out the impulse test, SC test, OC test , RAtio Test and any other test certified by the Accepting Oficer. (g) ALL the Tests Mentioned Shall be carried out in presence of Engineer In charge after completion of Re-winding along with calibration certifactes of the Work shop for measuring/testing Equipments (h) No RAR shall be paid with out submission of said documents / certificates as mentioned Above
All as per item no 16 here in before but of capacity 630to 800KVA Capcity
Taking down burnt defective high tension copper coil and supply and fix new HT copper coil made out of proper/ required as per the existing size copper wire enameled of high quality matching with the existing impedance and pre- insulation all as specified and directed. Note : (a) The cost of coil shall be inclusive of varnish sleeving of insulating material. (b) Cost of taking down the clamps, upper channels and core & HT links and re-clamp, positioning with separators, brazing etc completely shall be deemed to be included in the cost.
All as per item no 18 here in before but of LT copper coil
Taking down and opening of HT copper wound loose overheated coil from the limbs of transfomer of various capacities upto 1000KVA, and rewinding the same by using the same copper wire after providing DPC and proper insulation etc into the coil of suitable turns etc all as specified and directed
All as per item no 20 here in before but of LT copper wound
Taking down unserviceble tinned copper bus bar of various sizes from HT/LT side cable bushing rods from the transformer of capacities and supply and fix electrolyte tinned copper bus bar of suitable size and length including making holes as required at site to the transformer LT/HT side cable bushing rods all as specified and directed
Taking down the Defective tap changer assembly ,Supply and fix offload tap changer assembly suitable for any make upto 750KVA transformer with 7 tapping position including opening top cover, conservator etcs all as specified and directed.
Supply and making new LT 1100 V end termination with suitable size of aluminium lugs duly crimped for LT 3 ½ core armoured aluminium conductor cable after isolating supply to transformer/LT panel and disconnecting brunt/fault cable from the bunch of cables in trenches, galleries, removing cable loop, opening the cable blank and connecting back after end terminals, testing and commissioning for 3 ½ core 300 to 400sq.mm(XLPE)all as specified and directed.
All as per item no 24 here in before but of Cable Size 185 Sqmm to 240 Sqmm
All as per item no 24 here in before but of Cable Size 630 to 1000 Sqmm Single core.
Shifting of Transformer of capacity up to 630 KVA, from substations to various substation /transformers locations in the area of AGE(U) E/S No III by road using and removing the faulty transformer by fxing/errecting of the healthy tansformer with the hydra/crane support making the necessary HT/LT cable connections earth connections and restoration of power supply all as specified and directed.
M&L labour for alternative arrangement by hiring, transportation of transformer of capacity upto 500 KVA in place of unserviceable transformer on hire basis for 15 days including, installation, connecting and testing of transformer and return back after installation of repaired transformer complete all as specifed and directed. Note : (i) Repairing of transformer have to be completed within 15 days no extra cost will be paid toward hiring charges beyond 15 days . Moreover contractor shall not be allowed to shift the hired transformer until it is replaced by the repaired transformer . In case any fault /burning /peeling of painting and any other defects occured in hired transformer the contractor shall have to made good himself from his own expenses. (ii) Contractor should check the available infrasturcture and to be sure regarding safety of hired transformer before installation . The rete quoted is deemed to be include transportation cost, earthing lead etc. (iii) In case the defective transformer not repaired & installed on its site within the specified period of 15 days from the date of handing over to contractor a panelty recovery @ Rs 1000 /- per day will be charged from his dues. During this period contractor shall not be allowed to shift the hired transformer until it is replaced by the repaired transformer . No extra cost beyond 15 days will be paid to contractor on this account.
Earthing complete with galvanized steel earth plate electrode of size 60cmx60cmx6 mm thick, buried directly in ground (earth pit not less than 3.5 m below normal ground level) with top edge of earth plate not less than 2.5m below normal ground level, connected to galvanized iron strip 32X4 mm by means of electric arc welding of galvanised iron or steel as shown in electrical plate No 3 of SSR Part I, connected to earth test point and the equipment on the other side complete all as specified, including testing and commissioning complete all as directed. Note : (a)The unit rates quoted against this item shall be deemed to include the cost of excavation and earth work in any type of soil mostly Hard Soil /Hard Rock, common salt & charcoal dust in alternate layers, PCC 1:3:6 as in pit, precast RCC 1:2:4 type B-1 with necessary reinforcement as in cover & frame for pit, funnel, watering pipe 20 mm bore GI pipe light grade, protection pipe 40 mm bore GI pipe light grade etc. (b)The quoted rates shall also deemed to include the cost of earth test point and earth strip/GI earthing and protection pipe upto 7.5 meter beyond the earth plates electrode.
Opening of the VCB/OCB , 11 KV 400 to 800 Amps of any make by removing of the Breaker from the existing position after disconnecting all the connections from the system, servicing, Overhauling of the same, checking of the same for proper operation, spring charge, charged control cables are fastened tightly to the terminals, any abnormality, VCB, cleaning the surface of the insulators, fasten the bolts, checking and correcting interrupting units, mechanism, linkages etc, fasten the hardwares of control wiring, check that the split pins, Circlips, dowell pins etc. have not come out and are intact, lubricate the mechanism, moving parts by castrol, all purpose grease or equivalent, check that the vaccum pots/chambers is within limit including opening of the shutters properly, replacing of the trip catch, roller, holding catch, stopper, close push button, closing cum reassembling, controll limit switches reconnecting of the breaker for smooth functioning all as directed.
Decarbunizing/cleaning complete HT 11KV, 3 phase independent main bus bar, section bus bar chamber of HT panel electrification connection complete, consisting of set of 3 to 5 HT VCB switch gear arrangement incoming and outgoing installed in sub-stations after removing the complete bus bar spout, circuit spout from the bus bar chamber/cleaning with CTC and ensure proper decarburizing, re-fixing the same after applying backtol (Red) solution to the spout, checking all the connections, tightening the nuts, bolts thimbles for incoming and outgoing system complete, replacement of damaged space heater along with thermostats, as specified and directed, rate quoted is inclusive of bactol red, CTC & cotton waste provided by contractor.
All as per item No 31 here-in -before but set of 6 to 10 HT VCB switch Gear.
Decarbunizing/cleaning complete HT cable outgoing/Incoming circuit of CTs & PTs, 3 phase, cleaning with CTC and ensure proper decarburizing, re-fixing the same after applying backtol (Red) solution to the spout, checking all the connections, tightening the nuts, bolts thimbles for incoming and outgoing system complete, as specified and directed, rate quoted is inclusive of bactol red, CTC & cotton waste provided by contractor.
Supply only breaket Service/test position limit switch operatable for HWX/VMX type Breakers operatable at 110 Volts DC/AC with 2 NO/NC . Make:ABB/Schenider/Siemens/Crompton/Alstom.
Supply only closing coil assembly 110/24 V DC for VCB all as specified & directed. Make:ABB/Schenider/Siemens/Crompton/Alstom.
Supply only fix tripping coil 110/24V DC for VCB all as specified & directed. Make:ABB/Schenider/Siemens/Crompton/Alstom.
Supply only 11 Kv PT HV Back up fuse cat no 12Kv ABCNA 3.15A 38/10 as per OEM Recomendation / Make: Schnider/Bussmann
Supply only space heaters of 1 KW, 220Volts
Supply only thermostate adjustable type 30 to 120 degree C.
Supply only in replacement of motor & gear assembly 230V AC suitable for 400/630/800 amps, 11 KV HT VCB including testing & puting on load complete all as specified & directed.
Supply only in replacement (at site on OCBs as per existing size), male contact (Copper) suitable for HT 11 KV power supply .
Supply only in replacement (at site on OCBs as per existing size), Female contact (Copper) suitable for HT 11 KV power supply.
Supply only Current Transformers draw type 11kV, 300/150/5-5, Core1: Class 5P10, 10VA, Core2: Class 0.5, 10 VA .
Supplying and fixing Current Transformers draw type 11kV, 200/100/5-5, Core1: Class 5P10, 10VA, Core2: Class 0.5, 10 VA .
Supplying and fixing Current Transformers draw type 11kV, 100/50/5-5, Core1: Class 5P10, 10VA, Core2: Class 0.5, 10 VA .
Taking down the old/unserviceable potential transformer supply & fix new 11KV/110V/100VA with drawable type and epoxy incl PT grid with risers complete suitable for HT 11KV panel complete incl testing & commissioning all as specified and directed.
Note for ITEM No 34 to 46: Necessary Test Cerificates and Tax Voucher/ Paid Voucher Has to be submitted from Authorised Distrubutor/OEM for necessary Payment of RAR and Shall be submitted before First RAR
Material and labour for painting of LT/HT pannels by duly cleaning the surface from dust and grease and applying one coat of synthetic enamel paint by using spray gun colour as directed by the Eng - in - Charge and lettering the LT pannels with black/white paint using stencils or making lettering by using stickering with minium size of letter to be of 5 Cm all as specified and directed
M&L for cement painting of with prepared white ( snow sem ) for transformer plitnth area of any size all as specified for the following :- ( including scrapping & cleaning with wire brush )
Material and labour for painting to the both sides of fencing of the transformer/RMU by scraping the existing surface and applying a coat of synthetic enamel paint of the existing colour and complete all as specifed and directed.
Material and labour for complete bush cutting /trimming of trees around the substations/ transformers and under over head lines complete all as specified and directed.
M&L in replacement for 25x4mm galvanised iron strip for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in pipe or any other indicated situation for loop earthing etc complete all as specified and directed.
Supply, installation & commissioning and testing in replacement of SHF/VRLA Battery, Battery charge panel comprising 12 Nos. 2 Volts 100 AH tubular cell, self contained floor mounted sheet steel cabinet with two tiers for housing the batteries. The charging equipment will be operated from 240Volt +/- 10%, 50 c/s supply. The cabinet should be complete and internally wired auto/mannual switch. The charger unit should house, resstance control DC ammeter , Voltmeter and fuses, AC supply failure alarm. Complete accessories required for commissioning is included in the scope of work. DC distribution board comprising of 63 Amps DPMCB as incomer and 2 nos of 15 A DP MCB as O/G Battery Charger with batteries Automatic Float cum Bboost charger of 16 A to give 24 V DC output at 60 Ah capacity at Vikram Vihar Sub Station
M&L in replacement mild steel chequered plate 10 mm thick incliding cutting of suitable size for duct cover at site complete all as specified and directed by Engr-in-Charge.
M & L for PCC 1:3:6 type C-2 (using 40 mm gradded aggregate) for foundation, filling and mass concrete etc complete all as specified and directed .
M & L for cement concrete 1:2:4, type B-2 (using 40 mm gradded aggregate) for floors and paving etc complete all as specified and directed.
Calibration of all the electromagneitic/ thermal/ microprocessor relays of 11 KVand setting the relay tripping timings in advance to the feeding sub station to ensure pock wise re-installation of various relays in position with complete testing and commissioning. (i)Ensure proper functioning. (ii)Primary & secondary injection kit shall be arranged by the contractor . (iii)DC Supply for relay testing shall arranged by the contractor. (iv)The contractor shall prepare the relay adjustment and tripping timing chart in the follow up fashion and submit to Engineer-in-Charge
Material and Labour for complete removal of Stone aggragerate and removing of sand mud. Debris/ weeds and plants from the agraggate and relaying at the removed place complete all as specified and directed
Supply and lay graded stone aggregate of 63mm size underneath of 4 pole/2 pole/transformer yard all as specified and directed by taking down the damaged / powdered stone aggregate.
M&L for danger notice board of 1.6 mm thick mild steel,vitreous enamelled white with letters,figures and conventional skull and bones in signal red colour and fixed with MS clamps,bolts and nuts of approved size for HT 25 x 20 CM size complete.
Material and labour for providing galvanised chian link fencing of height 2 meters from GL right around the 11 KV 4 pole structure/RMU/ transformers structures with MS Angle iron of size 60 x 60 x 6mm thick duly painted with a coat of red oxide primer and two coats of synthetic enamel paint grouted with post holes and PCC at span of every meter distance around along with 1 mtr width hinged gate and providing of slag brick work of 2 feet height from Ground level with proper basement and plastering the surface with 1:6 cement sand ratio right around the fencing complete as specified by the engineer in charge.
Dismantling taking down 11 KV load break switch outdoor type and supply, installation , testing and commissioning of 11 KV, 400 Amps, 21 KA/3 sec outdoor type Ring main unit IP 54 protection plug in type extensible on one side SF 6 gas insulated one incoming and one outgoing (2 way ) with metering plate form mounted compact switch gear consisting of 01 Nos load break switch as incommer and 01 Nos outgoing VCBs , all live parts, bus bars VCB will be enclosed in robotically/manual welded minimum 2 mm thick stainless steel tank filled with SF 6 gas IP 67 Degree of protection and tested for internal arc 20 KA/1 sec as per latest IEC 62271-200 complete installed at basement of building, including the cost of PCC foundation for placing of RMU on plinth complete all as specified and directed. The unit shall include the following with all necessary standard fitting required at site: - (Make : ABB / SIEMENS / SCHNEIDER C&S).At Anuj VIhar/Vikram vihar.
(A) Incoming Load Break Module - 01 Nos each switching unit shall be designed as a three position switch. This three function switch combines the functions of switch disconnector and earthing switch cables switch 12 KV, 400 Amp, 21 KA - 01 Set. Snap action mechanism for motorised and manual(Both) operation with integrated earthing switch switch - 01 Nos. Cable bushing 400 Amp standard C bushing - 01. Fault passage indicator, On(N-1) load break switch where n= no of load break switch >>s/c & E/F FPI with digital display to be added for detection of cable fault. ON, OFF, EARTH mechanical indication on the front mimic of the panel - 01. Capacitive voltage indication fixed type LED display - 01. ON, OFF, TRIP mechanical indication on the front mimic of the panel - 01. Cable box for termination of cable up to 1 No. x 185 sq.mm - 01. Cable cover standard - 01. Set of 12kV Cable Termination Boots - 01. Cable entry bottom, front - 01
(B) (i) Out going VCBs - 01 No consisting of following - function unit consist of vaccum circuit breaker in combination with a three position switch. The three position switch fulfills the operation of the disconnector function and earthing function circuits breaker unit is equipped with an over current transformer for the protection of distribution Transformer/circuit vaccum circuit breaker 12 KV, not less than 400 A, 21 KA - 01. Spring assisted closing with stored Energy triping mechanism for motorised operation with integrated earthing switch - 01. live cable LED indicators thru capacitor voltage dividers mounted on the bushings push button for breaker trip - 01 sec O/C + E/F self powered numerical protection relay with low and High set for Over current and earth fault Relay should have facility to display the maximum loaded phase current also current also relay shall record minimum 5 fault records with time stamping - 01 Alaram trip indication 6 window anuciator for transformer faults Mechanical ON/OFF/EARTH indication -01. Auxliary contacts on load switch are 1 No+2NC & Auxiliary conract on earth switch is 1 No+ 1NC-01. Self powered electronic numerical protection relay providing 3 over-currents & 1 E/F protection - 01, shunt trip coil 24 V DC-01 capactive voltage indication fixed type LED display -01 ON/OFF/Trip mechanical indication on the front mimic of panel-01 cable box for termination boots-01. Metering Equipment incl. 01 x Digital Voltmeter (Acc.Cl.0.5), 01 x Digital Ammeter (Acc.Cl.0.5), 01 x Tri-VectorMeter (Acc.Cl.0.5) Auxliary relay for transformer protection -06 Nos.
(B) (ii) Out going VCBs - 01 No, each consisting of CT 100/1 -5p10.2.5VA- 03 Nos.
(C ) Additional equipment deliverd separately or mounted seperatly, Bus connected with battery charger and battries for motor power supply-01 (i) PT ratio 11KV/3/110/v3, 100 va, 0.5 class for measurement with volts meter(ii) Auxliary transformer of 11KV/230V, 1 KVA for powering the motors and battery charger (iii ) 24 V DC battery charger and battries for motor power supply. Standard mano meter -01, Operating handle - 02 , cable clamping provision(standard)-01 Operation and maintance manual - o1, installation and commissioning manual - 01, cost of PCC works for placing RMU on plinth is deemed to be included in the cost, Height of plinth shouldnot be less than 0.45 mtrs from ground level.
NOTE :- (a)The above module consisting of one Load break Switch and 01 VCBs shall be alligned appropriately and must have electrical and mechanical interlocking as per latest electrical safety norms including foundation complete As per OEM
mayur enterprises
Buddham Builders
Water Power Engg. Enterprises
MV Engineers And Contractors
DS CONSTRUCTION
Rajindera Enterprises
Ridhi engineers and builders
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .