Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹7,900
Closing Date
26 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE VGTPS
VGTPS, Ramanathapuram - 623536
VGTPS-Phase-II- Periodical and breakdown maintenance of 1No. 58.5MW Ansaldo Gas Turbine and its accessories and1No. 2050 KW Ariel Gas Booster Compressor for the period of Six months from 01.04.2021 to 30.09.2021
2021_EB_197797_1
SE/VGTPS/RMD/WC.NO.181/20-21
Open Tender
Miscellaneous Works
Works
180 days
VGTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,900
Yes
1 Mar 2021
20 Feb 2021
1 Mar 2021
20 Feb 2021
26 Feb 2021
20 Feb 2021
180 days
Amount
A. Periodical maintenance of GT and GBC Systems
Gas Booster Compressors and its accessories: Charges for Periodical inspectionof the Gas Booster Compressor gas, air, oil and water piping system for leaks and general checks for proper functioning of the system and attending the corrective action as per the direction of engineer in-charge, up keeping of the Twin oil Coolers, Duplex Filter housings, LP and HP compressor, gearbox, lube oil pumps,6Nos of Gas Cooler (ACHE) by thorough external cleaning and keeping the floor, platform of the houses clean and tidy. Checking the oil level and topping up of the lube oil using centrifuge as required and its connected pipe lines for any leakages, greasing of the suction, discharge and anti surge valves of the gas lines and attending any other minor unforeseen works related to the mechanical maintenance of the system as directed by the Engineer in-charge.
Gas conditioning skid: Charges for Periodical inspection of the Gas conditioning skid, gas leaks and general checks for the proper functioning of the system and attending the minor corrective action as per the direction of Engineerin-charge in the Gas conditioning skid and the Gas drain collection tank. Up keeping of the Gas conditioning skid and the Gas drain collection tank by thorough external cleaning and keeping the system clean and tidy. Draining of condensates from the scrubber, various locations in the conditioning skid and any other unforeseen minor works related to the mechanical maintenance as directed by the Engineerin-charge.
Gas Turbine (58.5 MW), GT Accessories like Lube oil skid, Gas skid, Mist Eliminator & Exhaust system of Gas Turbine: Charges for Periodical inspection of Gas Turbine for any abnormal sound and temperature and visual inspection of gas, water, air and lube oil piping system for leaks, leaky gaskets, pump and valve packing leaks, vibration of piping and general checks and attending the corrective action required as per the direction of the Engineer in-charge. In GT Accessories Module (Lube oil skid and Gas skid) inspecting the Pumps system for piping connection for any loose hardware, accumulator system pipe line, hydraulic manifolds leakage checking and attending the leaks, Checking the lube oil tank level and topping up the lube oil with centrifuge. Also includes transporting the lube oil and up keeping the lube oil pump system, lube oil filters housing and lube oil heat exchanger housing and the hydraulic oil pumps and its system, thorough external cleaning, removing of dust and dirt oil and oil fumes etc., in the lube oil and hydraulic oil filter external housing, etc.. (Refer Tender Specification)
Inlet Air filter house and Evaporative cooling system: Charges for Periodical inspection of Inlet Air Filter House system and Evaporative cooling system of GT inlet air for any abnormal sound, evaporative cooler pump strainer cleaning, replacing the filter cartridge on the air filter house as required as per the direction of Engineer in-charge. Checking & attending minor air leak in the filter house and attending any other minor unforeseen works related to the mechanical maintenance of the system as directed by the Engineer in-charge.
Gas Turbine Ventilation fans, Blowers, Cooling and Sealing air fans: Charges for Periodical inspection ofGas Turbine Ventilation fans,Blowers,Cooling and Sealing air fans by thorough cleaning of the fan casings and the dampers, greasing the damper’s and check for free operation of the standby dampers, Checking the tightness of bed bolts of all the above fans, Inspecting and up keeping of all cooling sealing air fans for proper functioning as per the direction of Engineer in-charge and any other unforeseen minor works related to the mechanical maintenance as directed by the Engineer in-charge
Operational Assistance for routine change over of equipments: charges for providing operation assistance during change over of GT auxiliaries such as Gas Turbine compartment cooling fans, Exhaust frame air blower, gas skid cooling fans,load compartment cooling fans, DD seal air fan & GD seal air fan, checking of damper operation, vibration checks and attending any other unforeseen minor works related to the mechanical maintenance as directed by the Engineer in - charge.
Breakdown maintenance of GT & GBC Systems
Seal air fans of Diverter damper, Guillotine damper : Dismantling the outer cover and gasket. Disconnecting the fan from motor shaft and cleaning of fan housing. Dismantling the NRV, inspecting for any damage Reassembling the fan on motor shaft and closing the cover with new gasket in place. Removal of bearings of NRV flap, inspecting them for healthiness and replacing if necessary. (Bearings will be supplied by the TANGEDCO) Packing grease and reassembling the NRV & normalizing as directed by the Engineer in-charge.
GT Guillotine / Diverter damper inspection work : This work involves GT Guillotine damper manhole door and Diverter damper manhole door open and visual inspection and manhole door closing work and manual opening and closing of GD & DD as per the direction of Engineer in - charge.
GT Diverter Damper / Guillotene damper Manual operation during failure of Auto operation: Manual operation of Diverter Damper by enabling local mode & engaging the clutch lever & applying enormous man power to rotate the manual hand lever to facilitate open / close of Diverter Damper / Guillotene damper in case of failure of auto operation of Diverter Damper / Guillotene damper as per the direction of Engineerin-charge
Mist Eliminator: Break down maintenance of mist eliminator work comprises of dismantling of mist eliminator fan from motor shaft by using appropriate tools carefully, after the removal of fan cover and assessment of fan surfaces for any damage or loss of material, complete cleaning of blade surfaces with petrol, diesel reassembling the fan blade with motor shaft, commissioning the mist eliminator and normalizing as per the direction of Engineerin-charge.
GBC Valves: Break down maintenance of GBC suction valve / Discharge/Seal gas valve / Anti surge valve by dismantling the top casing, inspection of worm shaft, worm gear, gear wheel for any damages, attending minor rectification works, replacement of bearings if necessary grease packing, inspection of Diaphragam for any damages & replacement of diaphragam, if necessary, reassembling the gear wheel, worm gear, worm shaft and ensuring free operation of valve, attending gas leak in valve, if any as per the direction of Engineer-in-charge.
water wash skid: Attending Break down maintenance in GT water wash skid by attending water leak in water wash tank by welding, inspection of suction/discharge valves for proper function & replacement / reconditioning of valve if necessary (or) decoupling the water wash pump from motor after isolating the suction & discharge line & disassembly of the pump, checking the bearings & seals of the pump and replace the failed bearings & seals by new one, replace the parts if any as required which will be supplied by the TANGEDCO& reassembling the pump, Alignment checking & coupling with the motor all complete & normalizing as per the direction of Engineerin-charge.
Minor welding work: Charges for attending any minorwelddefects in lube oil, air and water lines and support structures by welding, etc., as per the direction of Engineer in-charge.
GT & GBC Startup Assistance: Charges for startup work in Gas Turbine, Gas Booster Compressor and its axillaries, Maintenance assistance to attend water / oil / gas leak and Air vent releasing in Lube Oil Line and Checking for any abnormalities in the system during the startup as per the direction of Engineerin-charge.
Evaporator cooling system Opening the manual door of the evaporator cooling system by unscrewing the lock bolts of the door, remove bracket for media installation, and replace the media bracket complete. Check the distribution pads; drift eliminator assembly for scale formation if any. In case new drift eliminators need to be installed, materials will be supplied by TANGEDCO. Evaporator sump complete cleaning and inspection as per the direction of Engineer in - charge.
Combustion Chamber Inspection work: Gas turbine bottom side outer manhole door opening , Combustion chamber internal doors 3Nos opening and visual inspection of combustion chamber internals like heat shields, burners and 1st stage rotor and stator blades & vanes Visual inspection will be made by the TANGEDCOEngineer. Aftercompleting the inspection, closing the combustion chamber internal manhole doors 3Nos and outer cover door. The spare parts if any as required which will be supplied by the TANGEDCO and complete and normalizing as per the direction of Engineer in - charge.
Pneumatic Air Compressor : Gas turbine blowoff valves working under the control of pneumatic air compressor. Opening the outer cover, draining the lube oil completely and dismantling the compressor internals such as air suction valve ,filter coolant,filter seperator etc., After dismantling the compressor unit from the motor Visual inspection will be made by the TANGEDCOEngineer. The spare parts if any as required which will be supplied by the TANGEDCO andcomplete normalizing as per the direction of Engineer in - charge.
Lube oil Heat Exchanger : GT lube oil heat exchanger emergency break down works comprise of removing the plates from the heat exchanger after isolating the standby heat exchanger. checking the Gasket condition and replace the failed gaskets to new one. Complete cleaning of heat exchanger plates both sides. Replace the parts if any as required which will be supplied by the TANGEDCO and reassembling the Heat exchanger, alignment checking and all complete and normalizing as per the direction of Engineer in - charge.
Inlet Guide Vane calibration work: This work involves IGV calibration and IGV control actuator dowel pin & bolts removal and re-fixing with New pin & bolts as per the direction of Engineerin - charge.
GT Flame sensors cleaning work: This work involves2Nos GT Flame sensor removal, cleaning and re-fixing the same in the correct position as per the direction of Engineer in - charge.
GT compartment cooling blower fan filter cleaning work : This work involvesremoval GT Compartment cooling blower fans 2 Nos filters removing and cleaning and re-fixing work as per the direction of Engineer in - charge.
Off line water wash work : This work involves mixing of ZOK-27 detergent with DM water and filling the water wash tank, off line detergent washing and DM water washing with the co-ordination of operating personnel during GT shutdown as per the direction of Engineer in-charge.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .