Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹11.9 Cr
Closing Date
14 May 2025, 12:00 pmClosed
Mr. Jaydip Purkayastha, GM (SCM)
EIL GURUGRAM
DOUBLE WALL STORAGE TANKS ALONG WITH ETHANE AND PROPANE HANDLING AND DISPATCH FACILITIES FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES AT DAHEJ, GUJARAT
2025_EIL_846322_1
JP/B862-302-EP-T-7200/1010
Global Tenders
Miscellaneous Works
930 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹11.9 Cr
Yes
AS PER TENDER DOCUMENT
1 Aug 2025
28 Jan 2025
15 May 2025
5 Feb 2025
14 May 2025
27 Apr 2025
28 Jan 2025 - 5 Mar 2025
11 Feb 2025
Amount
Execution of complete scope of work on EPC/ Lump sum turn Key basis within Time schedule adhering to Quality and Safety guidelines for the complete EPC LSTK package comprising of Double Wall Storage Tanks, Pipeline for Ethane and Propane from Landfall Point to Tanks including trestles/ piperack., Ethane Boil of Gas (BOG) handling system, Re-condenser system, Liquid HP Ethane Heating and send out system up to (including) metering skids for GAIL & OPAL, Glycol water system for Ethane & Propane, Propane flash & Boil of Gas handling system, Liquid Propane Heating and send out system, Hydrogen send out system up to (including) metering skids, Propylene send out system up to (including) metering skids, Routing of excess Ethane BOG to existing LNG recondenser, Line routing from GAIL send out metering to Phase- I LNG terminal, Tieins as per Tiein-List with all associated works with complete accessories and auxiliaries for PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES Project of PLL as per the scope of the bidding documents which includes Project management, Residual Process Design, updation of FEED Package, HAZOP Study, SIL Study, Detailed Design and Engineering , Third party inspection, procurement, supply, transportation, port handling, fabrication, construction, erection, obtaining statutory approvals, installation, Inspection, Testing, supply of consumables, Hydro-testing, All related electrical, instrumentation, piling, civil and structural works, Pre commissioning, Commissioning of the package, along with associated facilities, commissioning of the complete facilities of Ethane and Propane from Jetty to DWST including Marine Loading Arms and other associated facilities, including supply of commissioning and mandatory spares, chemicals, Tools and tackles etc, Obtain Statutory approvals, Training for Machine Monitoring System, Analyzer, Gas Chromatograph, Capacity Control System, TFMS for owner's operation & maintenance personnel (5 mandays in three batches) at site, contratctor participation in Owner's supplied DCS/PLC FAT at DCS/PLC Vendor’s works( Price for 1 person for 5 days), Handing over LSTK Package to owner,as per scope of work mentioned elsewhere in the Bidding Document. The quoted price shall also include the insurance, all applicable taxes, Duties, Royalty and Levies as per bidding documents. Bidder to consider any other material/item also required for completion of the plant works but not specifically identified and covered above for completion of EPC-LSTK package works.
FOREIGN CURRENCY PART-I
FOREIGN CURRENCY PART-II
INDIAN CURRENCY PART
US Dollar
European Euro
British Pound
Japanese yen
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
BOQ.xls
BOQ • 0.68 MB
Download all tender documents and submit your bid