HQ CWE (U) Delhi Cantt-110010
HQ CWE (U) Delhi Cantt-110010
SPL REPAIR TO 8/10 MVA POWER TRANSFORMER AT KIRBY PLACE GRID IN THE AOR OF THE AGE E/S NO-I UNDER GE(U) E/S DELHI CANTT-10
2026_MES_799239_1
CWE(U)/D-31/2026-27
Open Tender
Civil Works
Works
180 days
HQ CWE (U) Delhi Cantt-110010
As per Tender Pages
9 documents required · 9 mandatory
₹1,000
GE (U) Elect Supply
₹1.3 L
Yes
18 Nov 2026
18 Nov 2026
21 Dec 2026
18 Nov 2026
14 Dec 2026
9 Dec 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for dismantling & transporting of Power Transformer including disconnecting the LT / HT Connections, Earthing, Control Cables carefully from the Transformer installed on Foundation of 33 Kirby Grid and Loading the 8/10 MVA capacity Transformer by using suitable Crane (20Ton capacity) on to the Transporting Trolley Vehicle, Transporting the unserviceable Transformer on Trolley Vehicle to Workshop from 33 Kirby Grid and after completion of Repairs at Workshop, Transporting the serviceable Transformer on Trolley Vehicle to 33 Kirby Grid from Workshop and unloading and refixing/reinstalled it on the Transformer Foundation carefully including connecting in original positiion & testing complete all as specified and as directed. | 1 | Each Job | - | - |
| 2 | Repair to Power Transformer of 8/10 MVA capacity complete all as specified and as directed.
[i] Draining out transformer oil in the suitable capacity of container / drums and keeping it in safe custody for credit.
[ii] Lifting, transporting & handling the transformer to the work shop and opening top cover of the transformer by unscrewing nuts / bolts / washers etc. including disconnecting core assembly from HT / LT bushing and lifting the same gently with the help of crane and taking out from the shell [Container / Body] of the transformer.
[iii] Visual inspection of entire Core Assembly, Transformer Tank, Core Limbs, OLTC etc., locating the fault / damages.
[iv] Cleaning the transformer body from inside, removing deposited dirt / sludge / foreign particles etc. from the bottom / body of the transformer, cleaning with CTC and drying up the shell from inside before refilling with the Transformer Oil.
[v] Cleaning and washing thoroughly core of the transformer by hosing down with clean dry oil conforming to IS – 336, removing deposited dirt / sludge / foreign particles from the core through inspection , providing insulations to leads and terminals with varnishing complete and re-assembling the core including newly winded coils etc. | 1 | Each Job | - | - |
| 2.01 | [vi] Heating / drying / baking complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc all as per IS.
[vii] Lifting and refixing core assembly inside the transformer shell gently and carefully connecting Primary / Secondary / Neutral Terminal Connections to the bushings assembly, fixing of Tap changer including tightening of nuts, bolts, washers of the core to reduce humming noise.
[viii] Refilling the filtered transformer oil in the shell of transformer complete.
[ix] Refixing the top cover including replacement of Cork Sheet / Gasket 8 mm thick tightening of nuts / bolts / washers etc. and replacement of Breather with Silica Gel.
[x] The inspection of transformer shall involve Checking of all clamps, nuts, bolts including core bolts & cover fixing bolts, Checking all brazing, joints, Tap heads and connection joints, Checking all jumpers, terminations / connections inside the transformer and Checking the Bulcholtz Relay / Conservator MOG if any. | - | - | - | - |
| 3 | M & L for Painting of Transformer of 8/10 MVA Capacity complete with Two Coats of Synthetic enamel paint externally and painting with a coat of Oil Resistant Paint inside the Transformer Shell complete all as specified and as directed. | 1 | Each Job | - | - |
| 4 | M & L for overhauling OLTC of 33 KV / 11 KV Transformer of capacity 8/10 MVA by draining out of Transformer Oil, dismantling of top cover, inspection of moving and fixed contacts of all Three Phases and checking the operation, cleaning and removal of contacts of all the Three Phases and checking the operation, cleaning and removal of all carbon particles, Checking the thickness of leads in the OLTC Board, Moving / Fixed Contacts, inspection of Transition Resistance and replacement of Gasket / Contacts etc., if found damaged, reassembling complete, Filling up of Oil, testing complete all as specified and as directed.
Note: Rate for spare parts are deemed to be included in quoted rate. | 1 | Each Job | - | - |
| 5 | M & L for rewinding of HT Tap Winding for 33KV / 11KV Power Transformer (8/10 MVA) having low winding resistance / defective HV Coil [Primary Side] by winding defective coils with new copper wire with Kraft Paper insulation as per IS of same gauge and size together with new insulated materials/bracings before placing in to the transformer and assembling the coil with new insulation materials, varnishing and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as specified and as directed. .Note : Warranty of Transformer winding shall be three year from date of completion | 1,580 | KG | - | - |
| 6 | M & L for rewinding of HT Tap Winding for 33KV / 11KV Power Transformer (8/10 MVA) having low winding resistance/ defective LV coil (Secondary Side) of by winding defective / low insulated coils with new copper wire with Kraft Paper insulation as per IS of same gauge and size together with new insulated materials/bracings before placing in to the transformer and assembling the coil with new insulation materials, varnishing and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as specified and as directed. Note : Warranty of Transformer winding shall be three year from date of completion | 1,150 | KG | - | - |
| 7 | Supply of Transformer Oil in renewal of approved quality with di-electric strength not less than 60 KV in to the Conservator Tank / Body Tank of the Transformer etc. complete all as specified and as directed. | 5,093 | Ltr | - | - |
| 8 | Supply only HV Bushings (Primary side) made out Porcelain alongwith Brass/Copper bushing rod 33 KV and suitable length/size all as per existing, complete of 8/10 MVA capacity transformern all as directed including dismantling old one complete all as specified and as directed. | 3 | Each | - | - |
| 9 | Supply only HV Bushing (Secondary side) alongwith Brass/Copper bushing rod 11 KV with threading and suitable length/size all as per existing complete 8/10 MVA power transformers all as directed including dismantling old one. | 3 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_896700.xls
BOQ • 0.60 MB
D31TP.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .