Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹23.3 L |
Tender Value
₹35.0 L
EMD Value
₹70,000
Closing Date
18 Mar 2026, 3:00 pmClosed
TANAY KUMAR
EE IRRIGATION DIVISION BIJIKHORBA
BIJIKHORBA
MD TAUHID ALAM
SE KHARAGPUR
SAHEBGANJ SUB DISTRIBUTORY & HIGH LEVEL CANAL FOR JUNGLE CLEARANCE ,DESILTING & STRUCTURE MAINTENANCE WORK
127356
04/2025-26/ID BIJIKHORWA/WRD/GR-03
Open Tender
CIVIL
Saharsa
• Earnest Money (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• Registration No. (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• Affidavit (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• Key Equipment (Either owned or leased or by procurement) (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• List of Technical Personnel - (Fresh Graduate in civil or Diploma civil *03years Experienced or retired I.T.I Holder as Site Supervisor- 01 (One) Nos. (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• Work Experience of Similar nature - Satisfactory completed atleast one similar work of value not less than 10% of estimated value of contract (In any of last 5 Years) (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• PAN Card (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• G.S.T. Registration (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• Charater Certificate (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• NOC for Debar (As per mentioned/specified in the NIT, Tender Document, Technical Checklist)
• Any Other if Required
CIVIL
PERCENTAGE
L1
1
11 documents required · 11 mandatory
₹5,000
Processing Fee: 590
₹70,000
REFER NIT FOR THE SAME.
30 Jul 2026
13 Mar 2026
20 Mar 2026
14 Mar 2026
18 Mar 2026
14 Mar 2026
16 Mar 2026
Name of Work SAHEBGANJ SUB DISTRIBUTORY & HIGH LEVEL CANAL FOR JUNGLE CLEARANCE ,DESILTING & STRUCTURE MAINTENANCE WORK Cost of Work as per BOQ Rs. 3495424.00 Time of Completion in month 03 Month
Sl No. Items Requirement
Name of the contractor
Address of the contractor
1 Earnest Money As per NIT duly pledged in favour of Executive Engineer, Irrigation Division, Bijikhorwa (Pay either online or offline) (Bank Guarantee only)
Bid Security Amount - Rs.70,000.00 Bid Security Amount - Rs.
2 Time of Completion
3 Registration No.
4 Character Certificate
5 Affidavit in required format (Should be after the publication date of the NIT)
6 Key Personnel (Site Supervisor), Fresh Graduate in Civil or Diploma civil +03 yeas Exp. Or retired I.T.I Holder- 01 Nos
7 PAN No / GST Registration / Income Tax Return (Updated)
BILL OF QUANTITY
NAME OF WORK- SAHEBGANJ SUB DISTRIBUTORY & HIGH LEVEL CANAL FOR JUNGLE CLEARANCE ,DESILTING & STRUCTURE MAINTENANCE WORK
AMOUNT OF BOQ 2657583.00 3495424.00
COST OF BOQ 5000.00
AMOUNT OF EARNEST MONEY 70000.00
LAST DATE OF TENDER 18.03.2026
TIME OF COMPLETION OF WORK 3 Months
S NO ITEM UNIT QUANTITY RATE AMOUNT
1 Jungle clearance and weeding out shurbs including small tree upto 0.50 mtr girth and removal as per specification sand direction of E/I.( 5.1.3) SQM 7007.56 11.92 83530.13
2 Earth work in bed clearance or desilting of canals having full supply discharge between 8.5 cumecs (300 cusecs ) and 0.14cumecs (5 Cusecs ) and renovation of pynes etc. in ordinary soil and disposal of excavated earth etc.including rough dressing .with all lead and lift all complete and as per specifications and direction of E/I.(5.1.20) CUM 861.51 191.00 164548.41
3 Earth work in filling in canal banks (canals discharge up to 28 cumecs ) as well as special repairs of canal banks in ordinary soil in proper profile (vide classification of soil item A ) obtained from borrow area or any other source, free from logs, roots or any other ingredients etc. with initial lead of 30M and initial lift of 1.5 M including breaking the clods to maximum 60 mm.cube ,placing the earth in layers not exceeding 225mm, thick all complete and as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )(5.1.25) CUM 22.89 199.67 4570.45
4 Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth so obtained to a distance up to 50 M and average lift of 1.5 M including leveling , ramming the foundation trenches, removing the roots of shrubs etc. all complete and as per specifications and direction of E/I.(5.1.27) CUM 141.76 197.88 28051.47
5 Providing coarse clean local sand in filling in foundation trenches including ramming, watering,royalty and all other taxes complete job as per specifications and direction of E/l.(5.1.37) CUM 13.86 344.08 4768.95
6 Providing brick flat soling with designation 100 A bricks joints filled with coarse sand of approved quality including royalty and all taxes all complete as per approved design, specifications and direction of E/l.(5.7.14) SQM 181.81 287.63 52294.01
7 Providing and laying P.C.C. M-100 with nominal mix of (1:3:6 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty etc.excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.(5.3.3) CUM 45.344 6123.14 277647.66
8 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in foundation with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc.complete job as per specification and direction of E / I.(5.4.2) CUM 176.21 5124.51 902989.91
9 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I. (5.4.6) CUM 96.6 5298.31 511816.75
10 Providing and laying P.C.C. M-150 with nominal mix of (1:2.:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.9) CUM 7.55 6499.56 49071.68
11 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I.(5.5.2) SQM 674.17 217.21 146436.47
12 Providing 1.5 mm thick cement punning including curing,, royalty and all taxes etc. Complete job as per specification and direction of E/l.(5.5.10) SQM 674.17 66.23 44650.28
13 labour for laying, fiting and fixing NP2 pipe with collors in line level and grade as well providing approved jointing materials and joints property filled to make them water proof all complete as per specification and direction of E/l.(5.6.1.1) M 2.4 251.95 604.68
14 SUPPLY for laying, fiting and fixing NP2 pipe with collors in line level and grade as well providing approved jointing materials and joints property filled to make them water proof all complete as per specification and direction of E/l.(5.6.1.1) M 2.4 257.26 617.42
15 Dismantling plain cement or lime concrete work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads as per building specifications and direction of E/I.(5.8.8) CUM 4.88 1236.09 6032.12
16 Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 Metre lead and disposal of unserviceable materials with all leads as per building specifications and direction of E/I. (5.8.7) CUM 54.57 701.69 38291.22
17 CARRIAGE OF MATERIAL
(i) CEMENT (5KMP+1KMK )( LEAD FROM LOCAL MARKET TO WORK SITE) MT 49.57 520.40 25796.23
(ii) L.SAND (2KMP+1KMK)( LEAD FROM LOCAL RIVER TO WORK SITE ) CUM 16.64 253.30 4214.91
(iii) Q.SAND (30KMP+1KMK)(LEAD FROM BANKA (CHANAN RIVER)QUARRY TO WORK SITE CUM 123.17 898.07 110615.28
(iv) S.METAL (110KMP+1KMK)(LEAD FROM MIRZACHOUKI TO WORK SITE) CUM 42.59 2965.93 126318.96
(v) S.CHIPS (110KMP+1KMK)(LEAD FROM MIRZACHOUKI TO WORK SITE) CUM 6.788 2740.26 18600.88
(vi) BRICKS (7KMP+1KMK)(LEAD FROM QUARRY TO WORK SITE) NOS 116646.00 2.17 253121.82
(vii) NP2 HUME PIPE -150mm DIA .(50KMP+1KMK)(LEAD FROM BHAGALPUR CARRY TO WORK SITE) M 2.40 45.93 110.23
ADD L. CESS 1% 28547.00
ADD S FEE 78977.33
JUNIOR ENGINEER ASSISTANT ENGINEER EXECUTIVE ENGINEER
Irr.SUBDiv. BIJIKHORWA Irr. SUBDiv. BIJIKHORWA IRRIGATION DIVISION BIJIKHORWA
BILL OF QUANTITY
NAME OF WORK- SAHEBGANJ SUB DISTRIBUTORY & HIGH LEVEL CANAL FOR JUNGLE CLEARANCE ,DESILTING & STRUCTURE MAINTENANCE WORK
AMOUNT OF BOQ 2657583.00 3495424.00
COST OF BOQ 5000.00
AMOUNT OF EARNEST MONEY 70000.00
LAST DATE OF TENDER 18.03.2026
TIME OF COMPLETION OF WORK 3 Months
S NO ITEM UNIT QUANTITY RATE AMOUNT
1 Jungle clearance and weeding out shurbs including small tree upto 0.50 mtr girth and removal as per specification sand direction of E/I.( 5.1.3) SQM 7007.56 11.92 83530.13
2 Earth work in bed clearance or desilting of canals having full supply discharge between 8.5 cumecs (300 cusecs ) and 0.14cumecs (5 Cusecs ) and renovation of pynes etc. in ordinary soil and disposal of excavated earth etc.including rough dressing .with all lead and lift all complete and as per specifications and direction of E/I.(5.1.20) CUM 861.51 191.00 164548.41
3 Earth work in filling in canal banks (canals discharge up to 28 cumecs ) as well as special repairs of canal banks in ordinary soil in proper profile (vide classification of soil item A ) obtained from borrow area or any other source, free from logs, roots or any other ingredients etc. with initial lead of 30M and initial lift of 1.5 M including breaking the clods to maximum 60 mm.cube ,placing the earth in layers not exceeding 225mm, thick all complete and as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth )(5.1.25) CUM 22.89 199.67 4570.45
4 Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth so obtained to a distance up to 50 M and average lift of 1.5 M including leveling , ramming the foundation trenches, removing the roots of shrubs etc. all complete and as per specifications and direction of E/I.(5.1.27) CUM 141.76 197.88 28051.47
5 Providing coarse clean local sand in filling in foundation trenches including ramming, watering,royalty and all other taxes complete job as per specifications and direction of E/l.(5.1.37) CUM 13.86 344.08 4768.95
6 Providing brick flat soling with designation 100 A bricks joints filled with coarse sand of approved quality including royalty and all taxes all complete as per approved design, specifications and direction of E/l.(5.7.14) SQM 181.81 287.63 52294.01
7 Providing and laying P.C.C. M-100 with nominal mix of (1:3:6 ) in foundation of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing, royalty etc.excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I.(5.3.3) CUM 45.344 6123.14 277647.66
8 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in foundation with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc.complete job as per specification and direction of E / I.(5.4.2) CUM 176.21 5124.51 902989.91
9 Brick work in designation 100 A Brick with cement mortar (1 : 4 ) in superstructure with approved quality of coarse sand of requisite F.M. washed and screened with raking out joints to 12 mm depth, curing, scaffolding and its removal wherever required including royalty etc. complete job as per specification and direction of E / I. (5.4.6) CUM 96.6 5298.31 511816.75
10 Providing and laying P.C.C. M-150 with nominal mix of (1:2.:4 ) in superstructure of various components of canal or embankment structures with approved quality of graded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing. royalty etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. (5.3.9) CUM 7.55 6499.56 49071.68
11 Providing 12 mm thick cement plaster (1: 4) with approved quality sand of requisite F.M . washed and screened including curing, scaffolding wherever required and its removal, royalty etc. complete job as per specification and direction of E / I.(5.5.2) SQM 674.17 217.21 146436.47
12 Providing 1.5 mm thick cement punning including curing,, royalty and all taxes etc. Complete job as per specification and direction of E/l.(5.5.10) SQM 674.17 66.23 44650.28
13 labour for laying, fiting and fixing NP2 pipe with collors in line level and grade as well providing approved jointing materials and joints property filled to make them water proof all complete as per specification and direction of E/l.(5.6.1.1) M 2.4 251.95 604.68
14 SUPPLY for laying, fiting and fixing NP2 pipe with collors in line level and grade as well providing approved jointing materials and joints property filled to make them water proof all complete as per specification and direction of E/l.(5.6.1.1) M 2.4 257.26 617.42
15 Dismantling plain cement or lime concrete work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads as per building specifications and direction of E/I.(5.8.8) CUM 4.88 1236.09 6032.12
16 Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 Metre lead and disposal of unserviceable materials with all leads as per building specifications and direction of E/I. (5.8.7) CUM 54.57 701.69 38291.22
17 CARRIAGE OF MATERIAL
(i) CEMENT (5KMP+1KMK )( LEAD FROM LOCAL MARKET TO WORK SITE) MT 49.57 520.40 25796.23
(ii) L.SAND (2KMP+1KMK)( LEAD FROM LOCAL RIVER TO WORK SITE ) CUM 16.64 253.30 4214.91
(iii) Q.SAND (30KMP+1KMK)(LEAD FROM BANKA (CHANAN RIVER)QUARRY TO WORK SITE CUM 123.17 898.07 110615.28
(iv) S.METAL (110KMP+1KMK)(LEAD FROM MIRZACHOUKI TO WORK SITE) CUM 42.59 2965.93 126318.96
(v) S.CHIPS (110KMP+1KMK)(LEAD FROM MIRZACHOUKI TO WORK SITE) CUM 6.788 2740.26 18600.88
(vi) BRICKS (7KMP+1KMK)(LEAD FROM QUARRY TO WORK SITE) NOS 116646.00 2.17 253121.82
(vii) NP2 HUME PIPE -150mm DIA .(50KMP+1KMK)(LEAD FROM BHAGALPUR CARRY TO WORK SITE) M 2.40 45.93 110.23
ADD L. CESS 1% 28547.00
ADD S FEE 78977.33
JUNIOR ENGINEER ASSISTANT ENGINEER EXECUTIVE ENGINEER
Irr.SUBDiv. BIJIKHORWA Irr. SUBDiv. BIJIKHORWA IRRIGATION DIVISION BIJIKHORWA
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT Sign copy.pdf
NIT • 2.57 MB
corrigendum src (1).pdf
NIT • 0.56 MB
LETTER NO. 204.doc
NIT • 0.55 MB
NIT Sign copy.pdf
NIT • 2.57 MB
TECHNICAL SHEET.xls
NIT • 0.02 MB
Technical bid (1).doc
NIT • 1.66 MB
Reference Letter (3).pdf
NIT • 35.69 MB
Bijikhorwa BOQ.xlsx
NIT • 0.02 MB
Bijikhorwa BOQ.pdf
NIT • 0.99 MB
Bijikhorwa BOQ.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .