| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance Being a L1 |
| 2 | L2₹2.1 Cr+₹10.4 L (5.14%)Rejected-Finance | ₹2.1 Cr+₹10.4 L (5.14%) | L2 | Rejected-Finance Being a L2 |
| 3 | L3₹2.2 Cr+₹16.8 L (8.34%)Rejected-Finance | ₹2.2 Cr+₹16.8 L (8.34%) | L3 | Rejected-Finance Being a L3 |
| 4 | L4₹2.4 Cr+₹39.4 L (19.5%)Rejected-Finance VILLAGE AND POST OFFICE LUJ TEHSIL PANGI DISTRICT CHAMBA | ₹2.4 Cr+₹39.4 L (19.5%) | L4 | Rejected-Finance Being a L4 |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
16 Jun 2026, 5:00 pmClosed
Inderjeet Sirra
DFO Lahaul Keylong
Construction of Nature Interpretation Center At Sissu, Distt. Lahaul and Spiti (H.P.) (SH- Construction of main building including W.S. and S.I and Septic Tank)
2026_FD_136303_1
1563 date 05.06.2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Sissu
As refer to bid documents
9 documents required · 9 mandatory
₹1,000
₹5.4 L
8 Jul 2026
10 Jun 2026
18 Jun 2026
10 Jun 2026
16 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, in all leads and lifts and as per directions of The Engineer-in- charge complete. Disposed earth to be levelled and neatly dressed | - | Cubic Metre | 429.05 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size and curing complete excluding cost of form work and reinforcement for reinforced concrete work but including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in:- | 32.17 | Cubic Metre | 6,661.6 | ₹2,14,303.67 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:5:10 (1 cement : 5 coarse sand: 10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work but including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in:- | 2.04 | Cubic Metre | 6,282.35 | ₹12,815.99 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:6:12 (1 cement:6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work but including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in:- | 34.66 | Cubic Metre | 6,224.2 | ₹2,15,730.77 |
| 5 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand): 4 graded stone aggregate 12.5mm nominal size) including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in:- | 43.34 | Square Metre | 360.2 | ₹15,611.07 |
| 6 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil, including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in:- | 43.34 | Square Metre | 98.35 | ₹4,262.49 |
| 7 | Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm, so as to give a fair finish including centring, shuttering and propping etc. with wooden battens and ballies, upto all heights of propping and centering below supporting floor to ceiling and removal of the same for in-situ reinforced and plain concrete work including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in :- (a) Foundation, footing basis of columns etc. and mass concrete . | 110.4 | Square Metre | 269.2 | ₹29,719.68 |
| 8 | Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm, so as to give a fair finish including centring, shuttering and propping etc. with wooden battens and ballies, upto all heights of propping and centering below supporting floor to ceiling and removal of the same for in-situ reinforced and plain concrete work including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in :- (b) Flat surfaces such as soffits of suspended floors, roofs, landings and the like Floors etc upto any thickness. | - | Square Metre | 682.7 | - |
| 9 | Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm, so as to give a fair finish including centring, shuttering and propping etc. with wooden battens and ballies, upto all heights of propping and centering below supporting floor to ceiling and removal of the same for in-situ reinforced and plain concrete work including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in :- (c) Beams, cantilever, girders and lintels sides and soffits of beams, beam hunching, cantilevers, bressumers and lintels in any depth in all height from floor.. | 456.2 | Square Metre | 544.45 | ₹2,48,378.09 |
| 10 | Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm, so as to give a fair finish including centring, shuttering and propping etc. with wooden battens and ballies, upto all heights of propping and centering below supporting floor to ceiling and removal of the same for in-situ reinforced and plain concrete work including carriage of materials in all leads and lifts and as per directions of The Engineer-in-Charge complete in :- (d) Columns, Pillars, Piers, Abutments, Posts and Struts | 325.08 | Square Metre | 705.55 | ₹2,29,360.19 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
sbd.pdf
Tender Documents • 10.05 MB
BOQ_201727.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .