| 1 | L1₹2.8 CrAccepted-AOC GALA NO 1 GURUNANAK CHOWK SOLAPUR | SOLAPUR | SOLAPUR | MAHARASHTRA | ₹2.8 Cr | L1 | Accepted-AOC L1 Bidder M/s Shrikrishna Construction, Solapur has quoted Rs. 27970353/-. |
| 2 | L2₹3.0 Cr+₹18.1 L (6.47%)Rejected-Finance | ₹3.0 Cr+₹18.1 L (6.47%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹3.1 Cr+₹34.7 L (12.4%)Rejected-Finance | ₹3.1 Cr+₹34.7 L (12.4%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹3.6 Cr+₹77.9 L (27.9%)Rejected-Finance | ₹3.6 Cr+₹77.9 L (27.9%) | L4 | Rejected-Finance Not L1 |
| 5 | L5₹3.6 Cr+₹78.6 L (28.1%)Rejected-Finance D NO 33 15 3A SWAPNA NIVAS KADIYALAVARI STREET SEETHARAPURAM VIJAYAWADA 520002 | VIJAYAWADA | KRISHNA | ANDHRA PRADESH | 520002 | ₹3.6 Cr+₹78.6 L (28.1%) | L5 | Rejected-Finance Not L1 |
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
6 Oct 2023, 6:30 pmClosed
Sr. Manager (E-C)
Engineering Office Kolhapur Airport.
Construction of Boundary Wall for Protection to AAI Land at Solapur Airport
2023_AAI_167233_1
AAI/SOLAPUR/CIVIL/2023-24/01
Open Tender
Civil Works
Item Rate
270 days
Solapur Airport.
As per NIT.
2 documents required · 2 mandatory
₹1,180
₹8.8 L
11 Jun 2024
13 Sept 2023
9 Oct 2023
14 Sept 2023
6 Oct 2023
14 Sept 2023
14 Sept 2023 - 21 Sept 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Brick work with common burnt clay F.P.S. (non modular) brick of class designation 3.5 in foundation and plinth in : Cement Mortar 1:6 (1 cement : 6 coarse sand).
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Pointing/Embossing AAI logo with cement mortar 1:3 (1 cement : 3 fine sand) projecting out by 12 mm raised on cement plastered walls as per drawing and directions of Engineer-in-Charge.
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: Channels, angles, tees and flats
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 75 mm diameter
Credit for taking away of PVC connections, pipes and fittings etc. and the like received from dismantling. The material so received shall be the property of contractor after dismantling duly weighed/ measured before removing from the site in the presence of Engineer-in-charge or his authorised representative all complete.
Credit for taking away of aluminium sections and fittings like tee, channels, plates, etc. received from dismantling. The material so received shall be the property of contractor after dismantling duly weighed/ measured before removing from the site in the presence of Engineer-in-charge or his authorised representative all complete.
Credit for taking away of M.S pipes, plates, angles etc. received from dismantling. The material so received shall be the property of contractor after dismantling duly weighed/measured before removing from the site in the presence of Engineer-in-charge or his authorised representative all complete.
DURGA ENTERPRISES
prime constructions
Classicon Projects India Pvt. Ltd.
BANAMALI ROUT
Umiya Construction
GURUKRUPA ENTERPRISES
Kalyan Toll Infrastructure Limtied
SWASTIK CONSTRUCTIONS-
S K INFRASTRUCTURE
N. M. Manthalkar
M/S. S. N. Powar
N P INFRAPROJECTS PVT LTD
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .