| 1 | L1₹18.5 LAdmitted-Finance | ₹18.5 L | L1 | Admitted-Finance |
| 2 | L2₹19.6 LAdmitted-Finance | ₹19.6 L | L2 | Admitted-Finance |
| 3 | L3₹19.6 LAdmitted-Finance | ₹19.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SHUBHAM ELECTRICAL L1 | DEEPAK ENGINEERING L3 | HARE KRISHNA ENERGY PROJECTS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Arresting of Leakage and sepage in 10 MVA Power transformer of 33/11 V Substations Work includes Openinig of H.T And L.T Side connection,darining out of transformer oil removing of Top of transformer And radiators, replacement of damage gaskit /Cog sheet which will be provided by Contractor, fitting of Top And radiators with Proper tightening of nut and bolts with Copper L-Pies and welding ,Proper connection of H.T. & L.T.Side with other associated Work to complete the job nut bolt and other required material will be provided by contractor. | 15 | Job | 35,500 ₹5.3 L | 38,000 ₹5.7 L | 37,500 ₹5.6 L |
| 2.00 | Arresting of Leakage and sepage in 05 MVA Power transformer of 33/11 V Substations Work includes Openinig of H.T And L.T Side connection,darining out of transformer oil removing of Top of transformer And radiators, replacement of damage gaskit /Cog sheet which will be provided by Contractor, fitting of Top And radiators with Proper tightening of nut and bolts with Copper L-Pies and welding ,Proper connection of H.T. & L.T.Side with other associated Work to complete the job nut bolt and other required material will be provided by contractor. | 8 | Job | 24,800 ₹2.0 L | 26,000 ₹2.1 L | 25,500 ₹2.0 L |
| 3.00 | Centifusing of Transformer Oil upto 70 KV BDV Value | 8 | Job | 40,300 ₹3.2 L | 42,000 ₹3.4 L | 41,500 ₹3.3 L |
| 4.00 | Supply and errection of Silicagel Breather complete for 10 MVA Transformer. All material provided by Contractor. | 50 | Job | 5,900 ₹3.0 L | 5,900 ₹3.0 L | 6,200 ₹3.1 L |
| 5.00 | Supply and errection of damage control cable of ( 4X2.5 Sqmm.) for WTI, OTI and Buchholz upto control pannel. All material will be provided by contractor. | 200 | Mtr | 205 ₹41,000 | 300 ₹60,000 | 300 ₹60,000 |
| 6.00 | Supply and errection WTI & OTI. All material will be provided by contractor. | 20 | No. | 8,400 ₹1.7 L | 8,900 ₹1.8 L | 8,910 ₹1.8 L |
| 7.00 | Supply and errection of MOG. All material will be provided by contractor. | 10 | No. | 13,000 ₹1.3 L | 12,000 ₹1.2 L | 12,100 ₹1.2 L |
| 8.00 | Supply and errection Arching horn. All material will be provided by contractor. | 20 | No. | 108 ₹2,160 | 108 ₹2,160 | 108 ₹2,160 |
| 9.00 | Supply and errection of Copper mesh for 11 KV side connection Neutral. All material will be provided by contractor. | 50 | No. | 1,028 ₹51,400 | 1,400 ₹70,000 | 1,395 ₹69,750 |
| 10.00 | Supply and errection of smart connector for 11 KV side of 5/10 MVA Transformer. All material will be provided by contractor. | 25 | No. | 4,400 ₹1.1 L | 4,950 ₹1.2 L | 4,800 ₹1.2 L |
Tender Value
₹19.6 L
EMD Value
₹20,000
Closing Date
30 Jan 2026, 12:00 pmClosed
SE-Technical
Office of the SE-Technical, Central Zone, Lucknow
62/SE(T)/LCZ/2025-26
2026_MVVNL_1108499_1
62/SE(T)/LCZ/2025-26
Open Tender
Electrical Works
90 days
Executive Engineer 33 KV
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Central bank of India
₹20,000
19 Feb 2026
24 Jan 2026
30 Jan 2026
24 Jan 2026
30 Jan 2026
24 Jan 2026
Arresting of Leakage and sepage in 10 MVA Power transformer of 33/11 V Substations Work includes Openinig of H.T And L.T Side connection,darining out of transformer oil removing of Top of transformer And radiators, replacement of damage gaskit /Cog sheet which will be provided by Contractor, fitting of Top And radiators with Proper tightening of nut and bolts with Copper L-Pies and welding ,Proper connection of H.T. & L.T.Side with other associated Work to complete the job nut bolt and other required material will be provided by contractor.
Arresting of Leakage and sepage in 05 MVA Power transformer of 33/11 V Substations Work includes Openinig of H.T And L.T Side connection,darining out of transformer oil removing of Top of transformer And radiators, replacement of damage gaskit /Cog sheet which will be provided by Contractor, fitting of Top And radiators with Proper tightening of nut and bolts with Copper L-Pies and welding ,Proper connection of H.T. & L.T.Side with other associated Work to complete the job nut bolt and other required material will be provided by contractor.
Centifusing of Transformer Oil upto 70 KV BDV Value
Supply and errection of Silicagel Breather complete for 10 MVA Transformer. All material provided by Contractor.
Supply and errection of damage control cable of ( 4X2.5 Sqmm.) for WTI, OTI and Buchholz upto control pannel. All material will be provided by contractor.
Supply and errection WTI & OTI. All material will be provided by contractor.
Supply and errection of MOG. All material will be provided by contractor.
Supply and errection Arching horn. All material will be provided by contractor.
Supply and errection of Copper mesh for 11 KV side connection Neutral. All material will be provided by contractor.
Supply and errection of smart connector for 11 KV side of 5/10 MVA Transformer. All material will be provided by contractor.
All taxess as applicable shall be paid time to time extra.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Doc62.pdf
Tender Documents • 0.79 MB
BOQ_2046404.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid