Tender Value
₹36.4 L
EMD Value
₹72,800
Closing Date
30 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
TECH SIG
8 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
If the Tenderer is not OEM, then the bidder should submit the authorisation of OEM along with the tender document. After the award of the contract, "MOU with the same RDSO approved source whose authorisation is taken at the time of bidding covering supply of the equipment of IPS, installation, testing and commissioning of IPS by the same RDSO approved source, including after-sales support required during the warranty period and beyond the warranty period, before supply of equipment undertaken".
OEM of IPS is "M/s Infinity Projects India Pvt Ltd.-Hyderabad"
Certificate to be submitted by tenderer along with the tender documents as per Annexure-II attached in tender Document.
The certificate to be submitted by the tenderer along with the tender documents as per Annexure-IIA is attached to the tender Document. (This certificate is to be given by the attorney/ authorized signatory/ each member of the Partnership firm/ Joint Venture (JV)/ Hindu Undivided Family (HUF)/ Limited Liability Partnership (LLP) etc.) The certificate to be submitted by the tenderer along with the tender documents as per Annexure-IIA is attached to the tender Document. (This certificate is to be given by the attorney/ authorized signatory/ each member of the Partnership firm/ Joint Venture (JV)/ Hindu Undivided Family (HUF)/ Limited Liability Partnership (LLP) etc.)
Declaration regarding constitution of firm & Bank Details as per Annexure-I attached in tender Document.
Mandatory undertaking Regarding Employment/ Partnership of Retired Railway Employees as per Annexure - XXIII attached in Tender Document.
Relevant Annexure is to be submitted in connection with status of their firms. i. e. Either for Sole Proprietorship/Partnership/Company registered under companies Act 2013/LLP (Limited Liability Partnership)) Registered under LLP Act 2008/Registered Society and Registered Trust/HUF (Hindu undivided Family) Firm's. Prescribed Format (Relevant Annexure) as per Firm's status is attached in tender document as per clause 16.2
Comprehensive Annual maintenance contract for testing/repairs/replacement of various modules/components, IPS (Integrated Power Supply) system of M/s Infinity Projects India Pvt Ltd. (Sukhila make) for 02 years over Bikaner Division
SnT-BKN-ET-2025-26-23R~NWR
SnT-BKN-ET-2025-26-23R
Open
Works - General
24 Months
Bikaner, Rajasthan
₹0
₹72,800
30 Jan 2026
8 Jan 2026
16 Jan 2026
4 items across 1 schedule · ₹36,37,350 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | AMC of IPS at 09 LC-gates. (LC-90, LC-10, LC-18, LC- 108, LC-67A, LC-16A, LC-125, LC-134, LC-139) Total No. of IPS = 09 Nos. Total months for AMC of IPS will be 09 Nos. x 24 = 216 months. | Month | 216.00 | 13,275 | 28,67,400 |
| 2 | AMC of IPS at LC-gates. -32A No. of IPS = 1 Nos. Total months for AMC of IPS will be 1 Nos. x 22 = 22 m o n t h s . Note: - AMC will commence from 18.02.2026 | Month | 22.00 | 13,275 | 2,92,050 |
| 3 | AMC of IPS at LC-gates. -87-I No. of IPS = 1 Nos. Total months for AMC of IPS will be 1 Nos. x 20 = 20 m o n t h s . Note: - AMC will commence from 15.04.2026 | Month | 20.00 | 13,275 | 2,65,500 |
| 4 | AMC of IPS at LC-gates. -49 Spl No. of IPS = 1 Nos. Total months for AMC of IPS will be 1 Nos. x 16 = 16 m o n t h s . Note: - AMC will commence from 02.08.2026 | Month | 16.00 | 13,275 | 2,12,400 |
| Schedule total | ₹36,37,350 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCCS3.pdf
ATTACHMENT
GCCCS1.pdf
ATTACHMENT
IRGCCApril2022.pdf
ATTACHMENT
GCCCS2.pdf
ATTACHMENT
GCCCS7.pdf
ATTACHMENT
GCCCS6.pdf
ATTACHMENT
GCCCS9.pdf
ATTACHMENT
GCCCS4.pdf
ATTACHMENT
GCCCS5.pdf
ATTACHMENT
GCCCS8.pdf
ATTACHMENT
GCCCS10.pdf
ATTACHMENT
SnT-BKN-ET-2025-26-23R.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .