Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹16.6 L
EMD Value
₹17,000
Closing Date
18 Sept 2023, 12:00 pmClosed
S.E., EDC-IV, Ciss Gomti, Lesa, Lucknow
S.E., EDC-IV, Ciss Gomti, Lesa, Lucknow
Bifurcation and 11 KV Badali Kheda, Sarojini Nagar Feeder and other electrical work against System Strengthening works in Municipal area 2023-24 (Package No. 478 and 479/23-24) under jurisdiction of EDD, CESS-I, Ciss Gomti, Lessa, Lucknow
2023_MVVNL_837301_1
68/EDC-IV/23-24
Open Tender
Electrical Works
Item Rate
90 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
E.E., EDD, CESS-Ist, Ciss Gomti, Lesa, Lucknow
₹17,000
22 Sept 2023
13 Sept 2023
18 Sept 2023
13 Sept 2023
18 Sept 2023
13 Sept 2023
Amount
Safe carriage, loading and unloading of following material from ESC Daliganj Lucknow in work site J.E. dump store
(a) Line Material
(b) 11 KV 3x120 sq.mm XLPE cable
(c) 11 KV 3x120 sq.mm XLPE OD/ID CJ Kit
(d) 11 KV 3x185 sq.mm XLPE cable
(e) 11 KV 3x185 sq.mm XLPE CJ Kit
(f) 11 KV 3x185 sq.mm. ST
(d) ACSR Racoon Conductor
(e) LT PVC Cable 1x240 sq.mm.
(f) PCC Pole 8.5 Mtr. Long
(g) ST Pole 11 Mtr. Long
(h) 11 KV Pin Insulator
(i) 11 KV Pin with nut
(j) 11 KV Disc Insulator
(k) Disc fitting
(l) 11 KV VCB for OG CTR 200/100/5A 350 MVA
(m) Stay Set complete
(n) 11 KV 3x120 sq.mm. ST
(o) Earth wire 7/16 SWG
Fabrication, erection of double pole for end terminations/sectional double pole, 11 KV line on ST/PCC Pole with fixing of necessary clamps & other accessories like 1 nos top channel 100x50 mm 2.24 m. 1 No. Guarding Angle. Its grouting in ratio 1:4:8 plinthing 300 mm above ground level, earthing of support & one side cable expose.
Dragging of ST/PCC Pole, digging of pit erection of section/exposer type double pole structure on ST//PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming as per RESPO Specification. Only Pole and insulator will be Provided by the Department.
Dragging of ST/PCC Pole to pit site, digging of pit erection and grouting (As per RESPO Norms) of 11 KV 11/8.5 Mtr Long ST/PCC Pole with, fixing of necessary item, such as V-type X-arm, F-bracket, 11 KV Pin insulator, Guarding angle (1.8 mm 65x65x6) with Nut & bolts its ramming as per RESSPO Specification. Only Pole and insulator will be Provided by the Department.
Grouting & Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand, Brick blast & cement). All material exept stay wire shall be supplied by the contractor.
Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. All material except earthing wire shall be supplied by the contractor.
Laying Stringing & sagging of 3 Phase 3 wire 11 KV New Line on ACSR Wesal/Racoon conductor as per RESPO Specification and direction on E/I. All material exept ACSR wesal/Racoon conductor shall be supplied by the contractor.
Guarding of HT line by GI wire. GI wire shall be supplied by the department.
Digging of pit suitable for 3x185 sq.mm 11 KV XLPE cable laying. After 11 KV XLPE cable laying refilling by Bricks & sand as Per RESPO Norms. Only 11 KV XLPE cable supplied by Department.
Laying of 11 KV 3x120 sq. mm XLPE cable double circuit digging of trench 1050 mm deep, 750 mm side including supply of required material, 1st class bricks, stone pad & fine sand. The inter spacing between two cable should be in between 0.25 m to 0.40m. The cables shall be laid in trench by first filling layer of sand and laying on sides with bricks, fixing bricks as partitions between two cables, after laying cable, covering cable by stone pads resting on bricks, covering it by earth, all work as per RESPO norms. (All material required for laying will be supplied by the contractor except 11 KV XLPE cable). One length cable-1100 Mtr total length 2200 Mtr.).
Cable Hosting of 11 KV 3x120/3x185 sq. mm XLPE Cable at the following including jumpering etc complete with help of GI Pipe as Per RESPO Norms. GI pipe and other required material shall be supplied by contractor.
High pressure testing of 11 KV 3x120/3x185 XLPE cable along with arrangement of High Pressure equipment.
Well type earthing of with 60 Fit Deep borring and providing GI Pipe 1.5" dia ("B" Class) and earthing must be joint by G.I. Strip of 32x5 mm thick long attached with nut & bolts and GI pipe cap. All material and labour shall be supplied the contractor.
Commissioning of 11 KV VCB IC CTR 200/100/5A 350 MVA Volt at 33/11 KV S/S including connection with, Busbar its Empire tap, PVC tap after grouting 2 No. Channel 75x40 mm 0.90 M lag its commissioning after taking proper S/D. Only 11 KV VCB shall be supplied by the Deptt.
GST Extra as per Rules
GOPI ENTERPRISES
SANA ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .