Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.5 LAccepted-AOC A 41 PHASE II MAYAPURI INDUSTRIAL ESTATE NEW DELHI 110 064 INDIA | NEW DELHI | WEST DELHI | DELHI | 110064 | ₹43.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹54.8 LRejected-Finance 502 5TH FLOOR BUILDING NO 72 LAKSHMI BHAVAN NEHRU PLACE NEW DELHI 110019 | SOUTH EAST | DELHI | 110019 | ₹54.8 L | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹68.0 LRejected-Finance | ₹68.0 L | L3 | Rejected-Finance Not being L1 |
| 4 | Rejected-Technical 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | - | - | Rejected-Technical Not meeting eligibility criteria as per NIT. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not meeting eligibility criteria as per NIT |
| Sl No | Description | Qty | Unit | S.L. ELECTROMECH PVT. LTD. L1 | Variant Infratech Private Limited L2 | WONDER CONSTRUCTION CO. L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of Hibay nor more than 150W with Epoxy powder coated die-cast aluminium housing in White finish, the colour of the housing must be supplied in White finish from the OEM end & with elegantly designed heat sink for efficient thermal management, sturdiness & excellent corrosion resistant. High efficiency long life LED module with SMD LED package mounted on MCPCB. Lumen efficacy of LED >175 lm/W and viewing angle of 120° to ensure better uniformity. PC Lens with distribution and PC Cover fixed to housing. Built-In Potted IP66 electronic CISPR15 Compliant LED driver with APFC,lower THD, Open Circuit Protection, OverVoltage Protection, Surge Voltage Protection upto 6KV & 10KV with SPD & other safety test as per IS 15885 Part-2/Sec 13, IEC60598- 1.System Lumens >21000 , CCT 4000K / 5700K, IK10, Led Life 50000 burning hours ( as per LM80 NABL Lab report ), THD <10%, PF > 0.95, Ingress Protection IP66, Ambient Temperature range Minimum -10 to 50 Degree C, Beam angle - Narrow Beam optics LM79 & LM80 reports to be submitted along with the bid. and as per AAI preferred Make (page no 208 to 217). The fixture must have dia 290MM and Height 180 MM, to retrofit the existing fitting opening in the false ceiling. ( equivalent products must comply with above specifications, LM79 & LM80 reports to be submitted along with the material) and warraty of 5 Yrs against any manufacturing defect and as per direction of EIC. | 345 | Nos | 10,700 ₹36.9 L | 5,500 ₹19.0 L | 15,700 ₹54.2 L |
| 2.00 | Installation testing & commissioning of Luminaire including all mounting and fixing accessories rod, bracket, wiring 1.5 mtr from connector to luminaire and designer acrylic which match the aesthetic & interior as per approved by engineering in charge, at a mounting height of approximate 22 Mtrs with arrangement of lift without disturbing of public movement and with all safety arrangements complete as required. | 345 | Nos | 500 ₹1.7 L | 7,500 ₹25.9 L | 1,300 ₹4.5 L |
| 3.00 | Dismantling of old Luminaires and deposit in stores at MLCP as required. | 345 | Nos | 100 ₹34,500 | 2,000 ₹6.9 L | 700 ₹2.4 L |
| 4.00 | Hiring of Spider lift 25 Mtrs -height for replacement of fitting in Concourse and Verandah area including mobilising and demobilising and free transportation including loading / unloading etc complete as required. | 1 | Month | 4,00,000 ₹4 L | 1,50,000 ₹1.5 L | 4,48,500 ₹4.5 L |
| 5.00 | Hiring charges for operator of Spider lift (26 Working days) - 1 Month including allowances for minimum 10 hours per day. | 1 | Month | 51,000 ₹51,000 | 1,50,000 ₹1.5 L | 2,41,500 ₹2.4 L |
Updated dates
Tender Value
₹83.9 L
EMD Value
₹2.5 L
Closing Date
26 Feb 2026, 10:30 amClosed
DGM (Engg-E), AAI, Goa Airport
DGM (Engg-E), AAI, Goa International Airport, Goa
SITC of various LED lights at Goa International Airport. SH Replacement of LED light of concourse Arrival and Departure and Verandah Entry side.
2026_AAI_267807_1
AAI/GOA/DGME/LEDlight/NIT17/26
Open Tender
Electrical Works
60 days
Goa Airport
As per NIT
20 documents required · 20 mandatory
₹1,180
₹2.5 L
30 Mar 2026
18 Feb 2026
27 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
18 Feb 2026 - 20 Feb 2026
Supply of Hibay nor more than 150W with Epoxy powder coated die-cast aluminium housing in White finish, the colour of the housing must be supplied in White finish from the OEM end & with elegantly designed heat sink for efficient thermal management, sturdiness & excellent corrosion resistant. High efficiency long life LED module with SMD LED package mounted on MCPCB. Lumen efficacy of LED >175 lm/W and viewing angle of 120° to ensure better uniformity. PC Lens with distribution and PC Cover fixed to housing. Built-In Potted IP66 electronic CISPR15 Compliant LED driver with APFC,lower THD, Open Circuit Protection, OverVoltage Protection, Surge Voltage Protection upto 6KV & 10KV with SPD & other safety test as per IS 15885 Part-2/Sec 13, IEC60598- 1.System Lumens >21000 , CCT 4000K / 5700K, IK10, Led Life 50000 burning hours ( as per LM80 NABL Lab report ), THD <10%, PF > 0.95, Ingress Protection IP66, Ambient Temperature range Minimum -10 to 50 Degree C, Beam angle - Narrow Beam optics LM79 & LM80 reports to be submitted along with the bid. and as per AAI preferred Make (page no 208 to 217). The fixture must have dia 290MM and Height 180 MM, to retrofit the existing fitting opening in the false ceiling. ( equivalent products must comply with above specifications, LM79 & LM80 reports to be submitted along with the material) and warraty of 5 Yrs against any manufacturing defect and as per direction of EIC.
Installation testing & commissioning of Luminaire including all mounting and fixing accessories rod, bracket, wiring 1.5 mtr from connector to luminaire and designer acrylic which match the aesthetic & interior as per approved by engineering in charge, at a mounting height of approximate 22 Mtrs with arrangement of lift without disturbing of public movement and with all safety arrangements complete as required.
Dismantling of old Luminaires and deposit in stores at MLCP as required.
Hiring of Spider lift 25 Mtrs -height for replacement of fitting in Concourse and Verandah area including mobilising and demobilising and free transportation including loading / unloading etc complete as required.
Hiring charges for operator of Spider lift (26 Working days) - 1 Month including allowances for minimum 10 hours per day.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.63 MB
TenderdocLED.pdf
Tender Documents • 9.95 MB
BOQ_311509.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid