Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-AOC | L1 | Accepted-AOC REASONABLE | |
| 2 | L2₹32.6 L+₹2.5 L (8.28%)Rejected-Finance 11 753 1 HABIBULLA STREET KADAPA CUDDAPAH ANDHRA PRADESH 516001 | Y S R | ANDHRA PRADESH | 516001 | L2 | Rejected-Finance HIGH RATE | |
| 3 | L3₹36.2 L+₹6.1 L (20.2%)Rejected-Finance 171 NARAYAN PETH PUNE PUNE MAHARASHTRA 411030 | PUNE | MAHARASHTRA | 411030 | L3 | Rejected-Finance HIGH RATE | |
| 4 | L4₹41.6 L+₹11.4 L (38.0%)Rejected-Finance | L4 | Rejected-Finance HIGH RATE |
| Sl No | Description | Qty | Unit | Deccan Enterprises L2 | KESARI AND SONS L3 | Sparkh Electricals & Works L1 | G V HAGAWANE L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Uninstalling and dismantling the pump ,descaling and cleaning of all parts for inspection and Carefully assembling the pumps by using existing serviceable parts including replacement of gasket packings, greasing etc and replacement of unserviceable parts as directed, installed at New Raw water Pump House, checking the serviceability. Make Kirloskar, Model DSM 150/45 (180HP).
Note : (i) Spare parts required for replacement shall be measured and paid separately under respective item 03 to 20 here-in-after and labour element included in this item for replacement in the BOQ.
(ii)Decoupling carefully the pumps from electric motor, taking out from foundation & transporting pump body to workshop for necessary machine works & re-installing the pump to its original position shall be measured & paid for separately under respective items in BOQ.
(iii) The job to be completed within 8 hrs from time of assignment to avoid interruption of Essential service on account of breakdown else contractor is liable for penalty as decided by Accepting Officer .
(iv) The rate of repairing of gland packing work is measured and paid separately under respective item in the BOQ.
(v) Transporting charge of Pump from pumping installation to Work Shop is measured and paid separately under item No 52 of BOQ. | 2 | Each Job | 2,500 ₹5,000 Lowest | 3,990 ₹7,980 | 4,500 ₹9,000 | 5,111 ₹10,222 |
| 2.00 | Lathe/ Machining works of any type at workshop required for balancing the impeller, fixing of new parts to existing shafts required for proper setting and smooth functioning to achieve desired discharge of the pump complete all as specified and directed. | 2 | Each | 5,000 ₹10,000 | 1,230 ₹2,460 Lowest | 1,620 ₹3,240 | 2,222 ₹4,444 |
| 3.00 | Supply only grease of suitable grade for spare parts of pumps complete all as specified and directed.
Make: INDIAN OIL SERVO MP-3 or equivalent in HP. | 10 | Kg | 20 ₹200 Lowest | 300 ₹3,000 | 120 ₹1,200 | 477 ₹4,770 |
| 4.00 | Supply only Polytetrafluoroethylene (PTFE) (Teflon) gland packing 6 to 24mm mm suitable for capacity 180 HP of pumps complete all as specified and directed. | 4 | KG | 240 ₹960 Lowest | 4,500 ₹18,000 | 520 ₹2,080 | 1,247 ₹4,988 |
| 5.00 | Supply only Brass Impeller, 1st stage suitable for DSM 150/46 Kirloskar pump (180 HP) under item No 1 above. | 1 | Each | 5,000 ₹5,000 | 2,450 ₹2,450 Lowest | 2,620 ₹2,620 | 9,999 ₹9,999 |
| 6.00 | Supply only Brass Impeller, 2nd stage, suitable for DSM 150/46 Kirloskar pump under item No 1 above. | 1 | Each | 5,000 ₹5,000 | 2,450 ₹2,450 Lowest | 3,500 ₹3,500 | 9,999 ₹9,999 |
| 7.00 | Supply only Ball bearing, DE, suitable for DSM 150/46 Kirloskar pump under item No 1 above. | 2 | Each | 2,200 ₹4,400 Lowest | 4,900 ₹9,800 | 3,500 ₹7,000 | 5,555 ₹11,110 |
| 8.00 | Supply only ball bearing, NDE, suitable for DSM 150/46 Kirloskar pump under item No 1 above. | 2 | Each | 2,500 ₹5,000 | 4,900 ₹9,800 | 2,400 ₹4,800 Lowest | 5,555 ₹11,110 |
| 9.00 | Supply only bearing cover suitable for DSM 150/46 Kirloskar pump under item No 1 above. | 1 | Each | 30 ₹30 Lowest | 350 ₹350 | 1,850 ₹1,850 | 2,555 ₹2,555 |
| 10.00 | Supply only bearing cap for DSM 150/46 Kirloskar pump under item No 1 above. | 2 | Each | 150 ₹300 Lowest | 350 ₹700 | 900 ₹1,800 | 2,555 ₹5,110 |
Tender Value
₹47.9 L
EMD Value
₹96,000
Closing Date
20 Oct 2025, 6:00 pmClosed
GE Khadakwasla
GE Khadakwasla
REPAIR / MAINT OF WATER PUMPS, MOTORS, PANELS, STARTER, CLEANING OF WATER FOUNTAINS AND SUMPS AND SEMI UNDER GROUND FILTERED WATER RESERVIORS INCL ALLIED WORKS AT NDA KHADAKWASLA
2025_MES_732016_1
8974/E8
Open Tender
Civil Works
Item Rate
270 days
GE Khadakwasla
As per tender documents
9 documents required · 9 mandatory
₹500
GE Khadakwasla
₹96,000
Yes
22 Nov 2025
22 Sept 2025
23 Oct 2025
22 Sept 2025
20 Oct 2025
7 Oct 2025
22 Sept 2025 - 7 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
8974.pdf
Tender Documents • 0.93 MB
BOQ_819562.xls
BOQ • 2.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .