Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹93,000
Closing Date
20 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Providing Infrastructure facilities in Schools and construction of other public _ 11 nos. in AGAMT-II-2021-22 Village panchayats of Thirumangalam Block in Madurai District in Package no. TMG_04
2022_RDTN_238612_2
568/2022/D7 /Tmg04/24.06.22
Open Tender
Civil Works
Item Rate
180 days
THIRUMANGALAM
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹93,000
1 Aug 2022
6 Jul 2022
20 Jul 2022
6 Jul 2022
20 Jul 2022
6 Jul 2022
90 days
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Filling in well gravel with well rammed, watered and consolidated complying with standard specifications etc., complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Cupboard Cuddapah slab 40 mm tk inclding supply and fixing etc
Granolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding etc.,
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Door 1.10 x 2.10 m
Door 1.00 x 2.10 m
Door 0.75 x 2.10 m
Door 0.90 x 2.10 m
Fabrication and supply of mild steel window of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
window 1.20 x 1.30 m
ventilator 0.90 x 0.45 m
Cost and supply of RCC jolly including all cost & conveyance
RCC Jolly 0.60 x 0.45m
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc
Distembering two coats including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Labour charge for fixing Doors and windows
Window
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 36
Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 64
Supply and run of 2 X 1.5 sq.mm (22 / 0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade in 25 mm dia GI pipe ( Class ' B ' ) suitably bent at both ends with necessary angle iron upright and end supports for mains. SD 70
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 110
Supply and fixing of single box type Compact flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of Tube Light [SD 88 ]
Supply and Fixing of TNEB meter board suitable for 32A single phase service connection with 32A fuse unit on TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit SD125
Supply and fixing of WT bulk head fitting with guard for 11W CFL SD 83
Supply and fixing of 300 mm ( 12") sweep AC Exhaust fan complete with necessary wall opening and making good on the wall. SD 114
Supplying and fixing in position white / colour glazed European Water Closet of best quality and approved make with 100 mm "P" or "S" trap connecting with CI pipe of 100mm dia / PVC pipe
Supplying and fixing in Position best quality and approved make Indian Made white / colour glazd earthern eare wash hand basin of size 550 x 400mm (with pedestal / without )
Supply and fixing of CFL Bulb SD 82
Provision for Rain water pipe
Provision for PVC tank of 500 litres Capacity
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Filling in well gravel with well rammed, watered and consolidated complying with standard specifications etc., complete.
Collection and supply of M Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Paving the floor with Kotta Green tiles of size 60cm X 60cm X 1.8 to 2 cm thick in Cement mortar 1:3 etc., complete complying with standard specifications and as directed by the departmental officers.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick etc complete
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Plastering with CM 1 : 5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1 : 3, 10mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering two coats including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Fixing of Cuddapah slab for Shelf including cost and conveyace of allmaterials to site complete
Rolling shutterD RS (2.10x2.40)m (5.04x2150=10836)
Rolling shutterD RS (1.80x2.40)m (4.32x2150=9288)
Door 1.20m x 2.10m
Door 0.90m x 2.10m
Window (1.23x1.30)m
Ventilator (0.90x0.60)m
Labour charges for fixing door etc., complete
Labour charges for fixing Windows and Ventilator etc., complete
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.
Collection and supply of M Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Towards the Labour charges for fixing in position of Steel Dorrs
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing using 200x300 any colour glazed tiles fixed over 12mm thick cement plaster in CM 1:2including all charges et., complete
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
Gronolithic flooring 25mm thick using 10-12mm size chips including cost and conveyance and all labour charges etc complete.
Towards the cost and supply of EWC with foot rest and P-trap, EWC with 10lit tank including all charges etc., complete
Towards the cost and supply of IWC with foot rest and P-trap,including all charges etc., complete
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of M Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Basement filling for well gravel including cost and conveyance of all materials to site and all labour charges etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
cement concrete 1:2:4 mix using 10-12mm chips including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Distembering two coats with approved Distemper over one coat of Primaring coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Plastic emulsion paint two coats with approved Cement Paint over one coat of Primaring coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coats with ready mixed paint for new iron work including cost of all materials to site and all labour charges etc complete.
Supplying and fabrication of the following steel doors ,and Ventilators, including cost and conveyance and all charges etc
Steel door D of size 0.9x2.10m
Steel Window size 1.20 x 1.30m
Supply and Fixing of Cuddapah slab for Shelf including cost and conveyace of allmaterials to site complete
Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T W Clamps, Plug, Shoes, bend, Screws, nails etc., complete
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Filling in well gravel with well rammed, watered and consolidated complying with standard specifications etc., complete.
Collection and supply of M Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Paving the floor with Kotta Green tiles of size 60cm X 60cm X 1.8 to 2 cm thick in Cement mortar 1:3 etc., complete complying with standard specifications and as directed by the departmental officers.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick etc complete
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Plastering with CM 1 : 5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1 : 3, 10mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering two coats including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Fixing of Cuddapah slab for Shelf including cost and conveyace of allmaterials to site complete
Rolling shutterD RS (2.10x2.40)m (5.04x2150=10836)
Rolling shutterD RS (1.80x2.40)m (4.32x2150=9288)
Door 1.20m x 2.10m
Door 0.90m x 2.10m
Window (1.23x1.30)m
Ventilator (0.90x0.60)m
Labour charges for fixing door etc., complete
Labour charges for fixing Windows and Ventilator etc., complete
Provision for Water Supply & Sanitary Arrangements etc complete
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.
Collection and supply of M Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Towards the Labour charges for fixing in position of Steel Dorrs
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing using 200x300 any colour glazed tiles fixed over 12mm thick cement plaster in CM 1:2including all charges et., complete
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
Gronolithic flooring 25mm thick using 10-12mm size chips including cost and conveyance and all labour charges etc complete.
Towards the cost and supply of EWC with foot rest and P-trap, EWC with 10lit tank including all charges etc., complete
Towards the cost and supply of IWC with foot rest and P-trap,including all charges etc., complete
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.
Collection and supply of M Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Towards the Labour charges for fixing in position of Steel Dorrs
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing using 200x300 any colour glazed tiles fixed over 12mm thick cement plaster in CM 1:2including all charges et., complete
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
Gronolithic flooring 25mm thick using 10-12mm size chips including cost and conveyance and all labour charges etc complete.
Towards the cost and supply of EWC with foot rest and P-trap, EWC with 10lit tank including all charges etc., complete
Towards the cost and supply of IWC with foot rest and P-trap,including all charges etc., complete
Incinerator for Ladies Bathroom (For School Works) SI No 292
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Filling in well gravel with well rammed, watered and consolidated complying with standard specifications etc., complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Cupboard Cuddapah slab 40 mm tk inclding supply and fixing etc
Granolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding etc.,
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Door 1.10 x 2.10 m
Door 1.00 x 2.10 m
Door 0.75 x 2.10 m
Door 0.90 x 2.10 m
Fabrication and supply of mild steel window of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
window 1.20 x 1.30 m
ventilator 0.90 x 0.45 m
Cost and supply of RCC jolly including all cost & conveyance
RCC Jolly 0.60 x 0.45m
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc
Distembering two coats including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Labour charge for fixing Doors and windows
Window
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 36
Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 64
Supply and run of 2 X 1.5 sq.mm (22 / 0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade in 25 mm dia GI pipe ( Class ' B ' ) suitably bent at both ends with necessary angle iron upright and end supports for mains. SD 70
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 110
Supply and fixing of single box type Compact flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of Tube Light [SD 88 ]
Supply and Fixing of TNEB meter board suitable for 32A single phase service connection with 32A fuse unit on TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit SD125
Supply and fixing of WT bulk head fitting with guard for 11W CFL SD 83
Supply and fixing of 300 mm ( 12") sweep AC Exhaust fan complete with necessary wall opening and making good on the wall. SD 114
Supplying and fixing in position white / colour glazed European Water Closet of best quality and approved make with 100 mm "P" or "S" trap connecting with CI pipe of 100mm dia / PVC pipe
Supplying and fixing in Position best quality and approved make Indian Made white / colour glazd earthern eare wash hand basin of size 550 x 400mm (with pedestal / without )
Supply and fixing of CFL Bulb SD 82
Provision for Rain water pipe
Provision for PVC tank of 500 litres Capacity
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.
Collection and supply of M Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Towards the Labour charges for fixing in position of Steel Dorrs
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing using 200x300 any colour glazed tiles fixed over 12mm thick cement plaster in CM 1:2including all charges et., complete
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
Gronolithic flooring 25mm thick using 10-12mm size chips including cost and conveyance and all labour charges etc complete.
Towards the cost and supply of EWC with foot rest and P-trap, EWC with 10lit tank including all charges etc., complete
Towards the cost and supply of IWC with foot rest and P-trap,including all charges etc., complete
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of M Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Basement filling for well gravel including cost and conveyance of all materials to site and all labour charges etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
cement concrete 1:2:4 mix using 10-12mm chips including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Distembering two coats with approved Distemper over one coat of Primaring coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Plastic emulsion paint two coats with approved Cement Paint over one coat of Primaring coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coats with ready mixed paint for new iron work including cost of all materials to site and all labour charges etc complete.
Supplying and fabrication of the following steel doors ,and Ventilators, including cost and conveyance and all charges etc
Steel door D of size 0.9x2.10m
Steel Window size 1.20 x 1.30m
Supply and Fixing of Cuddapah slab for Shelf including cost and conveyace of allmaterials to site complete
Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T W Clamps, Plug, Shoes, bend, Screws, nails etc., complete
Provision for Exhaust fan
Provision for Name Board charges
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Filling in well gravel with well rammed, watered and consolidated complying with standard specifications etc., complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Cupboard Cuddapah slab 40 mm tk inclding supply and fixing etc
Granolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding etc.,
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Door 1.10 x 2.10 m
Door 1.00 x 2.10 m
Door 0.75 x 2.10 m
Door 0.90 x 2.10 m
Fabrication and supply of mild steel window of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
window 1.20 x 1.30 m
ventilator 0.90 x 0.45 m
Cost and supply of RCC jolly including all cost & conveyance
RCC Jolly 0.60 x 0.45m
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc
Distembering two coats including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Labour charge for fixing Doors and windows
Window
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 36
Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 64
Supply and run of 2 X 1.5 sq.mm (22 / 0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade in 25 mm dia GI pipe ( Class ' B ' ) suitably bent at both ends with necessary angle iron upright and end supports for mains. SD 70
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 110
Supply and fixing of single box type Compact flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of Tube Light [SD 88 ]
Supply and Fixing of TNEB meter board suitable for 32A single phase service connection with 32A fuse unit on TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit SD125
Supply and fixing of WT bulk head fitting with guard for 11W CFL SD 83
Supply and fixing of 300 mm ( 12") sweep AC Exhaust fan complete with necessary wall opening and making good on the wall. SD 114
Supplying and fixing in position white / colour glazed European Water Closet of best quality and approved make with 100 mm "P" or "S" trap connecting with CI pipe of 100mm dia / PVC pipe
Supplying and fixing in Position best quality and approved make Indian Made white / colour glazd earthern eare wash hand basin of size 550 x 400mm (with pedestal / without )
Supply and fixing of CFL Bulb SD 82
Provision for Rain water pipe
Provision for PVC tank of 500 litres Capacity
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K ELAMPARITHI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .