Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹14.0 L
EMD Value
₹14,010
Closing Date
26 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Block Development Officer (BP)
Block Development Office, Nadimuthu Nagar, Pattukkottai
Thanjavur District Strengthening of Kuyavankulam Road (Anganwadi) in Othiyadikkadu Panchayat CC Pavement 110m-Wearing coat only Ch 0/0-0/110 Worn-out BT 302m Ch-0/110-0/412 MLACDS 2026-27
2026_RDTN_724510_1
2352/2026/A5
Open Tender
Civil Works - Roads
Item Rate
90 days
Block Development Office, Pattukkottai
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹14,010
Yes
10 Nov 2026
10 Nov 2026
26 Nov 2026
10 Nov 2026
26 Nov 2026
10 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strengthening of Kuyavankulam Road (Anganwadi) in Othiyadikkadu Panchayat (CC Pavement 110m-Wearing coat only Ch 0/0-0/110 ) & ( Worn-out BT 302m Ch-0/110-0/412) MLACDS 2026-27 | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 217.44 | sqm | - | - |
| 3 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A. | 81.54 | cum | - | - |
| 4 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 302 | sqm | - | - |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 113.25 | cum | - | - |
| 6 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 906 | sqm | - | - |
| 7 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 906 | sqm | - | - |
| 8 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 22.65 | cum | - | - |
| 9 | Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete. | 27.18 | cum | - | - |
| 10 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including 2.5mm glass bead @250 GMS per sqm area thickness of 2.5mm in uniform and free from streaks and holes etc complete as per MOTH&H specification No.803 | 60.4 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Price.pdf
Tender Documents • 0.55 MB
BOQ_869767.xls
BOQ • 0.32 MB
Technical.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .