| 1 | L1₹45.2 LAccepted-AOC NH 148 B NEAR BABA GHISARAM FILLING STATION VILLAGE PALI MAHENDERGARH 123029 | MAHENDERGARH | MAHENDERGARH | HARYANA | 123029 | L1 | Accepted-AOC L1 |
Tender Value
₹50.7 L
EMD Value
₹1.0 L
Closing Date
5 Nov 2024, 5:30 pmClosed
NAVIN KUMAR
ED - Gurgaon
Providing 25 KW Rooftop Grid Connected Solar Power Plant at Hodal, Hathin in District Palwal, Judicial Court Complex Sohna, Pataudi in District Gurugram and District Court Complex Faridabad under Electrical Division PWD BandR Br., Gurugram under eCou
2024_HRY_406306_1
2024911A4A78 70EC 4282 B0D7 39DD4C5D17AD664BAR
Open Tender
Electrical Works
Works
90 days
Pataudi
2 documents required · 2 mandatory
₹5,000
Yes
₹1.0 L
Yes
27 Dec 2024
24 Oct 2024
6 Nov 2024
24 Oct 2024
5 Nov 2024
24 Oct 2024
24 Oct 2024 - 25 Oct 2024
Amount
S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Mtr below ground level including diging and refilling of earth including cost of suitable size socket/cuppler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 63/50 mm outer dia/inner dia
Providing & erection/ laying of PVC/ XLPE insulated underground aluminium conductor underground cable loose in existing pipe or trenches complete in all respect with necessary connection upto the entire satisfaction of engineer in charge of the work. 16 Sq mm 4 core (Arm.)
Providing & erection/ laying of PVC/ XLPE insulated underground aluminium conductor underground cable on surface/ existing cable tray complete in all respect with necessary connection upto the entire satisfaction of engineer in charge of the work 16 Sq mm 4 core (Arm.)
Innovating Technologies, New Materials and Solar Panels NA SOLAR PANELS Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. other specifications as per DNIT in PDF.Above 100 kWp and up to 500 Kwp
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .