| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.0 LAccepted-AOC | ₹12.0 L | 1 | Accepted-AOC Work Order |
| 2 | 2₹12.5 L+₹42,030.97 (3.49%)Rejected-Finance SATARA JILA SATARA 415002 | SATARA | MAHARASHTRA | 415002 | ₹12.5 L+₹42,030.97 (3.49%) | 2 | Rejected-Finance Reject |
| 3 | 3₹12.7 L+₹65,515.32 (5.44%)Rejected-AOC AT KAMTHI POST VELE TAL DIST SATARA SATARA 415022 | SATARA | SATARA | MAHARASHTRA | 415022 | ₹12.7 L+₹65,515.32 (5.44%) | 3 | Rejected-AOC Reject |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.0 L
EMD Value
₹14,191
Closing Date
24 Nov 2025, 5:00 pmClosed
Additional Chief Executive Officer Z P Satara
Additional Chief Executive Officer Z P Satara
Improvement to ODR 40 TO VAKANWADI TO ODR 40 Road V R 124 CH 0/600 to 1/000 Tal WAI Dist Satara
2025_SATAR_1246655_1
Works/North/A-8/3054/08/25-26
Open Tender
Civil Works
Percentage
180 days
Improvement to ODR 40 TO VAKANWADI TO ODR 40 Road
Registered Qualified unemployed Engineers
9 documents required · 9 mandatory
₹1,000
₹14,191
25 Aug 2026
17 Nov 2025
25 Nov 2025
17 Nov 2025
24 Nov 2025
17 Nov 2025
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. - By Mechanical Means - Grading II Using Screening type-B (11.2 milimetre Aggregate) Item / Page No : 20 / 29 Specification No : MORTH-401, 402, 404, 902, 112 Spec. Page No : 109-111, 112-116, 121-129, 417-421, 19-21
Providing and constructing 50 milimetre thick modified penetration macadam road surface including all materials, preparing the existing road surface, spreading 40 milimetre stone metal layers 30 percent crusher broken metal plus 70 percent hand broken (by breaking rubble obtained by blasting), heating and spraying the bitumen of specified grade at the rate of 1.75 kilogram per square metre, spreading 12 milimetre size chips, compacting with static roller having weight 8 to 10 metric tonnes to achive the desired degree of compaction as per technical specification Clause 506, excetra complete. Including picking of existing water bound macadam surface. (Using VG-30 bulk bitumen) Item / Page No : 37a / 32 Specification No : IRC-SP-20 Spec. Page No : 215
Providing and Laying open graded premix surfacing of 20 milimetre thickness composed of 13.2 milimetre to 5.6 milimetre aggregates premixed with bituminous binder, transported to site with vehicle tracking system, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction, excluding prime / tack coat and seal coat. For Bitumen VG-30 bulk (Grade 60/70) - Using drum mix type hot mix plant without Supervisory Control and Data Acquisition, Paver and vibratory roller. (Over modified penetration macadam surface) Item / Page No : 12 / 36 Specification No : MORTH-501, 510, 511, 902, 903, 112, MORTH-503 Spec. Page No : 149-162, 198-205, 205-207, 417-421, 421-436, 19-21, 168-170
Providing bituminous type-A liquid seal coat on bituminous surface including supplying all materials and bitumen of VG-30 grade, preparing existing road surface, heating and applying bitumen at the rate of 0.98 kilogram per square metre by mechanical means, spreading chips and rolling by static roller having weight 8 to 10 metric tonne, excetra complete. Item / Page No : 1 / 35 Specification No : MORTH-511 Spec. Page No : 149-162, 205-207, 198-205, 417-421, 19-21
Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. Item / Page No : 29a / 25 Specification No : MORTH-408 Spec. Page No : 139-142
Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete. Item / Page No : 30 / 25 Specification No : MORTH-408 Spec. Page No : 139-142
Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering, excetra complete. Item / Page No : 31 / 25 Specification No : MORTH-408 Spec. Page No : 139-142
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils. Item / Page No : 18 / 24 Specification No : MORTH-301, 309 Spec. Page No : 45-53, 85-89
Providing and fixing Name Board of Size 1.20 X 0.90 mtr. with two vertical angle of 40 X 40 X 5 mm of 2.25 mtr. height out of which 0.45 mtr. embedded in cement concrete 1:4:8 of trap metal and M.S. Angle 40 X 40 X 5 mm top and Bottom and 16 Gauge thick sheet including anticorrisive and oil paint coating and Lettering of text height 3 inches as white background and Letters in Black colours etc.complete Rate Abst No : Name Board 22-23 Additional Specifications : The work shall be carried out as per the instructions of Engineer in-charge.
Water Absorption, Specific Gravity, Impact Value, Crushing Value Test for Metal below 40 milimetre 1 Test per
Sieve Analysis Test for Hard Murrm 1 Test per 100.00
Liquid Limit and Plastic Limit for Hard Murum 1 Test per 250.00
Penetration, Softening Point, Flash and Fire Point, Specific Gravity for Asphalt VG-30 (Grade 60/70) 1 Test per 10.00
Sieve Analysis Test for Metal 40 milimetre and above (Hand Broken) 1 Test per 100.00
Water Absorption, Specific Gravity, Impact Value, Crushing Value Test for Metal 40 milimetre and above (Hand Broken) 1 Test per
Extraction Test for Mix Material (OGC) 2 Test per 500.00
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
b1.pdf
Tender Documents • 4.13 MB
BOQ_2149644.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .