Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | L1 | Accepted-AOC - | |
| 2 | L2₹10.1 L+₹32,269.54 (3.29%)Rejected-Finance | L2 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | Amirah Constructions L1 | Fathima Construction L2 |
|---|---|---|---|---|---|
| 1.00Construction of 10000 Litre capacity of OHT ,Bore,Motor & Construction of GLR Arrangements in Therkkukonarkottai AD Colony West Side at Chettikurichi Panchayat | |||||
| 2.00Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B and special specification. Hard stiff clay, stiff block cotton, hard red earth, shales, murrams, gravely stoney earth mixed with 50% small sized boulders and hard gravelly soil etc. complete as per standard specifications and as directed by the Engineer. | |||||
| 3.00 | First depth of 2m for column foundation | 23.34 | Cum | 261 ₹6,091.74 Lowest | 274 ₹6,395.16 |
| 4.00 | Second depth of 2m for column foundation | 0.58 | Cum | 262 ₹151.96 Lowest | 274 ₹158.92 |
| 5.00 | Sand filling for foundation with M sand including consolidation ramming etc. complete as per standard specifications and as directed by the Engineer-incharge | 1.16 | cum | 1,651 ₹1,915.16 Lowest | 1,704 ₹1,976.64 |
| 6.00 | Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level. | 1.73 | Cum | 5,342 ₹9,241.66 Lowest | 5,506 ₹9,525.38 |
| 7.00Reinforced cement concrete 1 : 1.5:3 using 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, but including cost of mixing, placing the concrete in position, vibrating, consolidating, finishing and curing the concrete etc., complete and as directed by the Engineer-in-charge. (The rates inclusive of testing the reservoir for the water tightness of the structure) | |||||
| 8.00 | (i) below 1.50m to 4.50m depth from G.L for Footing | 2 | Cum | 9,252 ₹18,504 Lowest | 9,440 ₹18,880 |
| 9.00 | Below G.L upto 1.50m depth for column & G.L brace | 1.03 | Cum | 9,383 ₹9,664.49 Lowest | 9,572 ₹9,859.16 |
| 10.00 | Above G.L upto 4.50m height for column & brace | 2.11 | Cum | 9,392 ₹19,817.12 Lowest | 9,771 ₹20,616.81 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
16 Sept 2025, 3:00 pmClosed
BDO(VP)
Panchayat Union Office,Kayathar
Construction of 10000 Litre capacity of OHT ,Bore,Motor and Construction of GLR Arrangements in Therkkukonarkottai AD Colony West Side at Chettikurichi Panchayat in Kayathar Panchayat Union
2025_RDTN_601269_1
01/2025
Open Tender
Civil Works
Item Rate
Kayathar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
Yes
15 Nov 2025
6 Sept 2025
16 Sept 2025
6 Sept 2025
16 Sept 2025
6 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .