Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹122.2 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹127.3 Cr+₹5.1 Cr (4.20%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹130.6 Cr+₹8.4 Cr (6.88%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹150.2 Cr+₹28.0 Cr (22.9%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹152.2 Cr+₹30.0 Cr (24.5%)Admitted-Finance INFINITY THINK TANK TOWER II 10TH FLOOR PLOT NO A3 BLOCK G SECTOR V SALT LAKE CITY KOLKATA 700091 WB | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Techno Power Enterprises Private Limited L5 | Sri Gopikrishna Infrastructure Pvt Ltd L4 | ELECTROKINGS PROJECTS PRIVATE LIMITED L1 | PADMAVATI INFRASTRUCTURE COMPANY L2 | OMBL INFRAPROJECTS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Conversion of existing 1-phase and 3- phase LT lines with bare conductor to AB XLPE cable as per technical specifications, scope of works and approved drawings | ||||||||
| 1.01 | Total Amount of Supply Price | 1 | Rs | 51,59,48,089.65 ₹60,88,18,745.88 | 45,73,75,416.19 ₹53,97,02,991.12 | 46,06,32,828.4 ₹54,35,46,737.56 | 51,76,41,555.25 ₹61,08,17,035.26 | 44,16,47,919.47 ₹52,11,44,545.06 Lowest |
| 1.02 | Total Amount of Installation/Erection charges | 1 | Rs | 12,88,46,631.07 ₹15,20,39,024.69 | 17,90,94,864.85 ₹21,13,31,940.51 | 5,71,22,280 ₹6,74,04,290.51 | 2,18,40,502.41 ₹2,57,71,792.93 Lowest | 11,17,38,545.49 ₹13,18,51,483.74 |
| 1.03 | Total of complete work | 1 | Rs | 64,47,94,720.72 ₹76,08,57,770.57 | 63,64,70,281.04 ₹75,10,34,931.63 | 51,77,55,108.4 ₹61,09,51,028.07 Lowest | 53,94,82,057.66 ₹63,65,88,828.19 | 55,33,86,464.96 ₹65,29,96,028.8 |
| 1.04 | Discount if any Offered by Bidder in % | 1 | Rs | - | - | - | - | - |
Tender Value
₹70.2 Cr
EMD Value
₹1.4 Cr
Closing Date
7 Sept 2022, 3:00 pmClosed
Chief General Manager PPnD APDCL
Office of CGM PPnD APDCL 6th floor Bijulee Bhawan Paltanbazar Guwahati 781001
Conversion of existing single phase and 3 phase LT lines on bare conductor to AB Cable within Dibrugarh Electrical Circle under RDSS
2022_APDCL_26037_3
RDSS/Loss Reduction/Dibrugarh/Pkg 1
Open Tender
Electrical Works
Turn-key
365 days
Dibrugarh Electrical Circle
Please refer Tender documents.
3 documents required · 3 mandatory
₹30,000
₹1.4 Cr
Yes
9 Nov 2022
30 Aug 2022
9 Sept 2022
30 Aug 2022
7 Sept 2022
31 Aug 2022
Conversion of existing 1-phase and 3- phase LT lines with bare conductor to AB XLPE cable as per technical specifications, scope of works and approved drawings
Total Amount of Supply Price
Total Amount of Installation/Erection charges
Total of complete work
Discount if any Offered by Bidder in %
PADMAVATI INFRASTRUCTURE COMPANY
OMBL INFRAPROJECTS PRIVATE LIMITED
Sri Gopikrishna Infrastructure Pvt Ltd
Techno Power Enterprises Private Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.68 MB
Dibrugarh_NIT_2.pdf
Additional Documents • 2.11 MB
Dibrugarh_rev2.pdf
Additional Documents • 0.07 MB
Corrigenda_merged.pdf
Tender Documents • 8.00 MB
minutes_compressed.pdf
Tender Documents • 2.89 MB
Part1_Dibrugarh.pdf
Tender Documents • 2.26 MB
Part2_Dibrugarh.pdf
Tender Documents • 3.11 MB
Part3_Dibrugarh.pdf
Tender Documents • 2.68 MB
BOQ_41333.xls
BOQ • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .