Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-Finance | ₹9.2 L | L1 | Accepted-Finance Lowest Quoted Amount. |
| 2 | L1₹9.2 LAccepted-Finance | ₹9.2 L | L1 | Accepted-Finance Lowest Quoted Amount. |
| 3 | L2₹10.7 L+₹1.5 L (16.3%)Accepted-Finance | ₹10.7 L+₹1.5 L (16.3%) | L2 | Accepted-Finance 2nd Lowest Quoted Amount. |
| 4 | L3₹11.0 L+₹1.8 L (19.7%)Accepted-Finance KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | ₹11.0 L+₹1.8 L (19.7%) | L3 | Accepted-Finance 3rd Lowest Quoted Amount. |
| Sl No | Description | Qty | Unit | DEBADUTTA BISOYI L1 | Rashmita Panda L3 | Ashok Dash L2 | Hrusikes Panda L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismentling and removing cement concrete including stacking the useful materials for reuse and removing the debries within 50 m. Lead etc. complete | 11.43 | cum | 754.36 ₹8,622.33 Lowest | 977.56 ₹11,173.51 | 877.16 ₹10,025.94 | 754.36 ₹8,622.33 Lowest |
| 2.00 | Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum. In volume within 50 m. initial lead and1.5 m. initial lift including rough dressing etc. complete. | 99.63 | cum | 379.41 ₹37,800.62 Lowest | 585.6 ₹58,343.33 | 441.17 ₹43,953.77 | 379.41 ₹37,800.62 Lowest |
| 3.00 | Cutting and disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials with in 50 mtr initial lead and 1.5 mtr initial lift including rough dressing etc. complete | 13.86 | cum | 953.41 ₹13,214.26 Lowest | 1,206.63 ₹16,723.89 | 1,108.62 ₹15,365.47 | 953.41 ₹13,214.26 Lowest |
| 4.00 | Cutting and disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials with in 50 mtr initial lead and 1.5 mtr initial lift including rough dressing etc. Complete | 8.31 | cum | 1,279.65 ₹10,633.89 Lowest | 1,490.52 ₹12,386.22 | 1,487.97 ₹12,365.03 | 1,279.65 ₹10,633.89 Lowest |
| 5.00 | Supplying & Laying of 5ft. (1.52mt.)x 1.00 ft. RCC ring including cost and transportation etc. complete. | 42 | No | 1,204 ₹50,568 Lowest | 1,450.5 ₹60,921 | 1,400 ₹58,800 | 1,204 ₹50,568 Lowest |
| 6.00 | Laying of stone boulders dry packing in apron and revetment with hard granite stone including spalls for filling and wedging cost, carriage etc. Complete. | 4.89 | cum | 1,819.61 ₹8,897.89 Lowest | 2,115.83 ₹10,346.41 | 2,115.83 ₹10,346.41 | 1,819.61 ₹8,897.89 Lowest |
| 7.00 | Cement Concrete (1:3:6) by using 4cm. Size H.B.G. (C.B.) metal including cost, conveyance etc. complete. | 1.89 | cum | 5,399.43 ₹10,204.92 Lowest | 6,585.41 ₹12,446.42 | 6,278.41 ₹11,866.19 | 5,399.43 ₹10,204.92 Lowest |
| 8.00 | Constuction of RCC (1:2:4) cover plate including cost and carriage etc. complete. | 7.47 | cum | 6,626.09 ₹49,496.89 Lowest | 7,740.46 ₹57,821.24 | 7,704.76 ₹57,554.56 | 6,626.09 ₹49,496.89 Lowest |
| 9.00 | Supplying,fitting & Placing of HYSD bar Reinforcement cover plate including cost and carriage etc. complete. (Steel ) | 1.08 | Qntl | 7,819.9 ₹8,445.49 Lowest | 9,093.54 ₹9,821.02 | 9,092.51 ₹9,819.91 | 7,819.9 ₹8,445.49 Lowest |
| 10.00 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentalingthen after casting including cost of materials complete. | 14.52 | sqm | 661.89 ₹9,610.64 Lowest | 817.2 ₹11,865.74 | 769.64 ₹11,175.17 | 661.89 ₹9,610.64 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,700
Closing Date
6 Jul 2026, 5:00 pmClosed
Hydrologist, GWD Div., Berhampur
Office of the Hydrologist, GWD Division, Berhampur, At-Bhabinarayanpur, Post-Rangeilunda, via-Bhanjavihar, Berhampur-760007
Construction of 3 no. of Roof Top Rain Water Harvesting Structure at Boys Hostel Building (Block-I), (Block -II) and Ladies Hostel Building of Govt. I.T.I. College in Hinjilicut Urban area under Ganjam District for the F.Y. 2026-27.
2026_GWSI_132754_1
04/GWDBAM/CHHATA/2026-27
Open Tender
Civil Works - Others
Item Rate
60 days
Hinjilicut
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,700
Yes
4 Aug 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling and removing cement concrete including stacking the useful materials for reuse and removing the debries within 50 m. Lead etc. complete | 1 | cum | 877.16 | ₹876.28 |
| 2 | Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum. In volume within 50 m. initial lead and1.5 m. initial lift including rough dressing etc. complete. | 1 | cum | 441.17 | ₹440.73 |
| 3 | Cutting and disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials with in 50 mtr initial lead and 1.5 mtr initial lift including rough dressing etc. complete | 1 | cum | 1,108.62 | ₹1,107.51 |
| 4 | Cutting and disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials with in 50 mtr initial lead and 1.5 mtr initial lift including rough dressing etc. Complete | - | cum | 1,487.97 | - |
| 5 | Supplying & Laying of 5ft. (1.52mt.)x 1.00 ft. RCC ring including cost and transportation etc. complete. | - | No | 1,400 | - |
| 6 | Laying of stone boulders dry packing in apron and revetment with hard granite stone including spalls for filling and wedging cost, carriage etc. Complete. | 1 | cum | 2,115.83 | ₹2,113.71 |
| 7 | Cement Concrete (1:3:6) by using 4cm. Size H.B.G. (C.B.) metal including cost, conveyance etc. complete. | 1 | cum | 6,278.41 | ₹6,272.13 |
| 8 | Constuction of RCC (1:2:4) cover plate including cost and carriage etc. complete. | 1 | cum | 7,704.76 | ₹7,697.06 |
| 9 | Supplying,fitting & Placing of HYSD bar Reinforcement cover plate including cost and carriage etc. complete. (Steel ) | - | Qntl | 9,092.51 | - |
| 10 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentalingthen after casting including cost of materials complete. | 1 | sqm | 769.64 | ₹768.87 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_597600.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.96 MB
BIDDOC04.pdf
Tender Documents • 1.54 MB
BOQ_597600.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .