Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC AT BAGHUABOL CHHAK PO HATATOTA TALCHER ANGUL ODISHA PIN 759100 | ANUGUL | ODISHA | 759100 | ₹2.8 L Quoted ₹2.4 L | L1 | Accepted-AOC On being L1 |
| 2 | L2₹2.6 LRejected-Finance PLOT NO 46 SUGANDHA VIHAR NEAR NEW ERA PROGRASSIVE SCHOOL RAMPUR DIST KORBA 495677 | KORBA | CHHATTISGARH | 495677 | ₹2.6 L | L2 | Rejected-Finance On being L2 |
| 3 | L3₹3.1 LRejected-Finance AT PO GURUDWAR NEAR UCO BANK SOUTH BALANDA TALCHER DIST ANGUL ODISHA PIN 759116 | TALCHER | ANGUL | ODISHA | 759116 | ₹3.1 L | L3 | Rejected-Finance On being L3 |
| Sl No | Description | Qty | Unit | Pioneer Enterprises L2 | M/s Evergreen Electrical Works L3 | M/S INDUSTRIAL ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Complete Checking & Overhauling/Repairing of mechanism with control circuit.
Scope of work: -
1. Checking, cleaning & repairing of mechanism with replacement of required spare parts on requirement basis from the below listed spares:
a) AUX. SWITCH 13NO + 13NC.
b) Magnet Assy
c) Close/trip Coil 110V DC
d) Spring charge Motor 220V AC
e) Tripping Spring Assy for OHB
f) Pole assy without vent valve
g) Basic Mechanism for OHB
h) MO2 assy (110V DC)
i) Operation Box Assembly.
j) Switch Element
2. Checking & rectification of control circuit.
3. Tools, tackles & consumables like cotton, grease CRC etc. from contractor's end.
(Note: Skilled & Semi-Skilled Manpower required for execution of the work.) | 1 | Job. | 86,100 ₹86,100 | 1,02,500 ₹1.0 L | 80,000 ₹80,000 |
| 2.00 | Detection of gas leakage and complete overhauling of pole R.Y.B Pole. Scope of work: -
1. Complete dismantling of three poles. 2. Cleaning & changing of oil seal, O-Ring / Gasket. 3. Assembling, vaccum of pole up to required level & refilling of SF6 4. CRM Timer & megger of poles.
5. Replacement of spare parts on requirement basis from the below listed spares:
a) Terminal
b) Insulating enclosure
c) Blasting Nozzle
d) Moving arc contact
e) Fixing arcing contact
f) Fixed contact
g) Insulating tie-rod
h) Cap with vent value
i) Moving Contact
6. Tools, tackles & consumables like cotton, grease CRC etc. from contractor's end.
(Note: Skilled & Semi-Skilled Manpower required for execution of the work.) | 1 | Job. | 89,250 ₹89,250 | 1,06,300 ₹1.1 L | 80,000 ₹80,000 |
| 3.00 | SF6 gas (3.5kg) | 2 | Cylinder | 30,975 ₹61,950 | 37,200 ₹74,400 | 29,000 ₹58,000 |
| 4.00 | Installation Charges for 33 KV CT 200-100/5-5
(Skilled & Semi-skilled Manpower required for execution of the work.) | 3 | Nos. | 7,350 ₹22,050 | 8,600 ₹25,800 | 6,500 ₹19,500 |
| 5.00 | Total impact of Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 2,593.5 ₹2,593.50 | 3,090 ₹3,090 | 2,375 ₹2,375 |
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
21 Nov 2025, 5:00 pmClosed
Pramod Swarnkar, Sr Manager (EnM)
Office of the Project Engineer (EnM), ILBL OCP, Lakhanpur Area, MCL
Repair of ABB make 36 kV SF6 Circuit breaker Sl. No. 30000766 installed at Main Substation of ILBL (South) OCP, Lakhanpur Area, MCL.
2025_MCL_347062_1
MCL/LKPA/ILBL/ePC-EM/25-26/34
Open Tender
Electrical and Maintenance Works
10 days
EnM Department, ILBL OCP, Lakhanpur Area, MCL
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,700
9 Apr 2026
11 Nov 2025
24 Nov 2025
11 Nov 2025
21 Nov 2025
11 Nov 2025
11 Nov 2025 - 14 Nov 2025
Amount
Complete Checking & Overhauling/Repairing of mechanism with control circuit. Scope of work: - 1. Checking, cleaning & repairing of mechanism with replacement of required spare parts on requirement basis from the below listed spares: a) AUX. SWITCH 13NO + 13NC. b) Magnet Assy c) Close/trip Coil 110V DC d) Spring charge Motor 220V AC e) Tripping Spring Assy for OHB f) Pole assy without vent valve g) Basic Mechanism for OHB h) MO2 assy (110V DC) i) Operation Box Assembly. j) Switch Element 2. Checking & rectification of control circuit. 3. Tools, tackles & consumables like cotton, grease CRC etc. from contractor's end. (Note: Skilled & Semi-Skilled Manpower required for execution of the work.)
Detection of gas leakage and complete overhauling of pole R.Y.B Pole. Scope of work: - 1. Complete dismantling of three poles. 2. Cleaning & changing of oil seal, O-Ring / Gasket. 3. Assembling, vaccum of pole up to required level & refilling of SF6 4. CRM Timer & megger of poles. 5. Replacement of spare parts on requirement basis from the below listed spares: a) Terminal b) Insulating enclosure c) Blasting Nozzle d) Moving arc contact e) Fixing arcing contact f) Fixed contact g) Insulating tie-rod h) Cap with vent value i) Moving Contact 6. Tools, tackles & consumables like cotton, grease CRC etc. from contractor's end. (Note: Skilled & Semi-Skilled Manpower required for execution of the work.)
SF6 gas (3.5kg)
Installation Charges for 33 KV CT 200-100/5-5 (Skilled & Semi-skilled Manpower required for execution of the work.)
Total impact of Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Pioneer Enterprises (BID ID -1196693)
M/s Evergreen Electrical Works (BID ID -1197366)
stage.html
html • 0.04 MB
techsummary_359757.pdf
BOQ Comparative Chart
xlsx
finsummary_359757.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 1.00 MB
BOQ_359757.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid