Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
13 Jul 2026, 10:00 am5d left
Executive Engineer Division Kasumpti HPPWD Shimla-
Executive Engineer Division Kasumpti HPPWD Shimla-3
Regarding revised estimate of Construction work of additional two room classrooms in R/O Govt. Senior Secondary School
2026_PWD_138061_11
SD-I-CTR-Tender-26 11041 dated 02-07-2026
Open Tender
Civil Works
30 days
Shimla
As per SBD
12 documents required · 12 mandatory
₹500
₹30,000
4 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing form work with steel plates 3.15mm(three point fifteen milimetre) thick welded with angle iron in frame 30x30x5mm (thirty into thirty into five milimetre) so as to give a fair finish i/c centring, shuttering, strutting and propping etc. with wooden/steel battens and bailies in all heights or propping and centring, below supporting floor to ceiling and removal of the same for in situ- reinforced concrete and plain concrete work including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) Flat surfaces such as soffits of suspended floors, roofs, landings etc upto 200mm thickness. | 1 | Per Square Meter | 350 | ₹349.65 |
| 1.1 | Column Pillars | 1 | Per Square Meter | 350 | ₹349.65 |
| 1.2 | Beams | - | Per Square Meter | 350 | - |
| 1.3 | Edges of slab and break in floor and wall 20 cm wide. | 1 | Per Running Meter | 150 | ₹149.85 |
| 2 | Providing and laying cement concrete 1:1.5:3 (1 cement : 1.5 : sand : 3 graded stone aggregate 20 m nominal size and curing complete excluding cost of form work, lead as per direction of Engineer - in - charge. (i) Suspended floor, lintels ,beams , column girders bressumers and cantilevers upto floor two level . | 1 | Per Cubic Metre | 7,600 | ₹7,592.4 |
| 3 | Poviding mild steel / Torsteel reinforcement for R.C.C work including, bending , binding and placing in position complete upto floor two level: Tor steel, including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per kilograms | 115 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
SBD1462813.pdf
Tender Documents • 6.92 MB
BOQ_204463.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid