Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 0 DHULJI KI DHANI DESURIYAN VISHNOIYAN SURPURA JODHPUR JODHPUR RAJASTHAN 342304 | JODHPUR | RAJASTHAN | 342304 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | Admitted-Fee/PreQual/Technical |
Tender Value
₹13.9 L
EMD Value
₹35,000
Closing Date
19 Mar 2026, 3:00 pmClosed
SA,ASI, Trichy circle
O/o SA,ASI, Trichy circle, Trichy-620002
FIRST RECALL TENDER FOR EXECUTION OF WORK OF MC and EW(DRB) TO UPGRADATION OF HORTICULTURE OFFICE BUILDING AT THANJAVUR 2025-26
2026_ASI_901286_1
T-15/21/2026-TRICHY CIRCLE
Open Tender
Civil Works
Works
30 days
Brihadisvara temple
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹35,000
Yes
20 Apr 2026
5 Mar 2026
20 Mar 2026
5 Mar 2026
19 Mar 2026
5 Mar 2026
5 Mar 2026 - 19 Mar 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Archaeological Survey of India, Trichy Circle, MainGuard Gate,Trichy-2
Name of Work: FIRST RECALL FOR MC&EW (DRB) TO UPGRADATION OF HORTICULTURE OFFICE BUILDING AT THANJAVUR-2025-26
Contact No: 0431-2711258 (Rates should be quoted inclusive of GST )
Name of the Bidder/ Bidding Firm / Company :
Item No Description and specification of items of work to be executed Item Code / Make Specification / Quantities to be executed Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1.01 Carefully removing the heavy vegetation growth, thorny bushes, uprooting trees upto a height of 1mtr above and disposal the same to a far off place for neat and tidy condition including cost of all labours, materials and other charges etc., complete Item1 837.45 SQM Excess(+) Full Conversion INR
2.01 Restoration of damaged wooden Joists by removing of damaged wooden members and replacing with new teak wood joist including cutting, sawing, erecting and dismantling the scaffolding including the cost of all labours, materials and other wooden painting charges etc., complete Item2 20 NOS Excess(+) Full Conversion INR
3.01 Water tightening the roof using with single layer flat tiles with a size 15cm x 15cm on the brick jelly concrete of 10mm thickness and laying flat tiles and necessary cement plastering the above including cost of all materials, labour charges and other charges etc., Item3 38.5 SQM Excess(+) Full Conversion INR
4.01 Restoration of wooden doors by removing of damaged wooden members and replacing with new teak wood including cutting and sawing and other charges etc., complete Item4 2.42 SQM Excess(+) Full Conversion INR
5.01 Painting to the wooden doors and windows using with synthetic enamel paint after scrapping the old surface including cost of all labours, materials and other charges etc., complete Item5 30.03 SQM Excess(+) Full Conversion INR
6.01 Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth, Finishing walls with ready mixed Premium acrylic emulsion paint including all materials and labour charges etc. complete Item6 330.96 SQM Excess(+) Full Conversion INR
7.01 Removing the existing damaged CC flooring infront of the Horticultural office building and disposal the same to a far off place including cost of all labour charges, material charges and other charges etc., complete. Item7 11.78 SQM Excess(+) Full Conversion INR
8.01 Providing CC flooring 1:2:4 upto 40mm thickness at infront of the Horticultural office building for easy approach and to avoid rainy water stagnation including cost of all materials, labour charges etc., complete. Item8 35.65 SQM Excess(+) Full Conversion INR
9.01 Earthwork excavation by manually and disposal the debris to a far off place including cost of all materials, labour charges and other charges etc complete Item9 12.42 CUM Excess(+) Full Conversion INR
10.01 laying dry river sand for strengthening the base for providing Jelly concrete including cost of all materials, labour and other charges etc complete Item10 0.83 CUM Excess(+) Full Conversion INR
11.01 Laying stone jelly concrete 1:3:6 for fixing the kerb stone at Fort gateway area including cost of all materials, labour and other charges etc complete Item11 1.66 CUM Excess(+) Full Conversion INR
12.01 Construction of CR masonry wall using with cement mortar 1:6 with necessary curing by potable water including cost of all materials, labour charges and other Item12 14.92 CUM Excess(+) Full Conversion INR
13.01 Making, supplying and fixing of MS grill fencing by using with MS L angle 50x50x6mm as horizontal and vertical section end to end and the horizontal section of post 50x6mm MS flat and equal interval of 16mm dia MS round rods in vertical section each 10cm to 10cm and fixing the round emblem of ASI logo in the middle of the MS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc complete. Item13 31.98 SQM Excess(+) Full Conversion INR
14.01 Making, supplying and fixing the Sunlight passing roof (using transparent fibre sheet) t and fixing with MS square bars and tubes after removal of the damaged member at infront of the Horticulture office building including cost of all labour, material and other charges etc. complete Item14 1 NOS Excess(+) Full Conversion INR
15.01 Making, supplying and fixing of MS grill Gate by using with MS L angle 50x50x6mm as horizontal and vertical section end to end and the horizontal section of post 50x6mm MS flat and equal interval of 16mm dia MS round rods in vertical section each 10cm to 10cm and fixing the round emblem of ASI logo in the middle of the MS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc complete. Item15 7.6 SQM Excess(+) Full Conversion INR
16.01 Rearrangements of electrification and electrical materials including cost of all materials, labour charges and other charges etc., complete. Cost of PVC pipes for wiring 10Feet Item16 20 NOS Excess(+) Full Conversion INR
16.02 Cost of PVC bends Item17 25 NOS Excess(+) Full Conversion INR
16.03 Cost of PVC elbow Item18 25 NOS Excess(+) Full Conversion INR
16.04 4 way junction box Item19 10 NOS Excess(+) Full Conversion INR
16.05 2mm square copper wire for electrification each 90 RMT Item20 3 NOS Excess(+) Full Conversion INR
16.06 4mm square copper wire for electrification each 90 RMT Item21 2 NOS Excess(+) Full Conversion INR
16.07 Switch boards with necessary sockets and switches Item22 5 NOS Excess(+) Full Conversion INR
16.08 Cost of earth, wiring connection from main service board to internal connections Item23 1 NOS Excess(+) Full Conversion INR
16.09 Cost of street light 200 Watts with pole with necessary electrical connection Item24 4 NOS Excess(+) Full Conversion INR
16.1 Cost of ceiling fan Item25 2 NOS Excess(+) Full Conversion INR
16.11 Cost of wall mounted fan Item26 2 NOS Excess(+) Full Conversion INR
16.12 Cost of LED tube light set Item27 8 NOS Excess(+) Full Conversion INR
16.13 Cost of holders Item28 8 NOS Excess(+) Full Conversion INR
16.14 Skilled labour including EPF and ESI charges as per the minimum wage rate Item29 15 NOS Excess(+) Full Conversion INR
16.15 Un-Skilled labour including EPF and ESI charges as per the minimum wage rate Item30 10 NOS Excess(+) Full Conversion INR
17.01 Packing with brick jelly concrete at mangalore tiles roof top corner side open area for avoiding rainy water incoming including cost of all materials, labour charges and other charges etc., Item31 0.68 CUM Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
technical_947329.pdf
cancelled_1.pdf
pdf • 0.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
RFP.pdf
Tender Documents • 18.42 MB
BOQ_947329.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .