| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | ₹18.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹19.3 LRejected-AOC | ₹19.3 L | L2 | Rejected-AOC Accepted |
| 3 | L3₹20.3 LRejected-AOC | ₹20.3 L | L3 | Rejected-AOC Accepted |
| 4 | L4₹20.4 LRejected-AOC | ₹20.4 L | L4 | Rejected-AOC Accepted |
| 5 | L5₹23.0 LRejected-AOC | ₹23.0 L | L5 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | SAI SURYA CONSTRUCTION L5 | BEEMJI ENTERPRISE L1 | R DHARMAN L2 | M.D.SILAMBARASAN L3 | VELAN CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Vellore District Providing Deck Slab, Retaining wall For C.D Cheruvu Burail Ground Road in C.d Cheruvu Panchayat in Pernambut block General Fund 2025 -2026 Package no 01 | ||||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, as per SS 20B complete. | 42.12 | CUM | 463 ₹19,501.56 | 230 ₹9,687.60 | 222.89 ₹9,388.13 | 234.5 ₹9,877.14 | 235.82 ₹9,932.74 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 5.27 | CUM | 5,519 ₹29,085.13 | 4,000 ₹21,080 | 4,664.05 ₹24,579.54 | 4,906.92 ₹25,859.47 | 4,934.51 ₹26,004.87 |
| 4.00Supplying and erecting centring for sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | ||||||||
| 5.00 | Below GL | 40.95 | SQM | 599 ₹24,529.05 | 450 ₹18,427.50 | 462.64 ₹18,945.11 | 486.73 ₹19,931.59 | 489.47 ₹20,043.80 |
| 6.00 | Above GL | 97.5 | SQM | 1,099 ₹1.1 L | 550 ₹53,625 | 925.28 ₹90,214.80 | 973.46 ₹94,912.35 | 978.93 ₹95,445.68 |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 71.32 | CUM | 6,379 ₹4.5 L | 5,000 ₹3.6 L | 5,299.7 ₹3.8 L | 5,575.66 ₹4.0 L | 5,607.02 ₹4.0 L |
| 8.00 | Providing Weep Holes | 1 | LS | 500 ₹500 | 5,500 ₹5,500 | 422.5 ₹422.50 | 444.5 ₹444.50 | 447 ₹447 |
| 9.00Deck Slab | ||||||||
| 10.00 | Supplying and erecting centring for sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | 75 | SQM | 1,099 ₹82,425 | 900 ₹67,500 | 925.28 ₹69,396 | 973.46 ₹73,009.50 | 978.93 ₹73,419.75 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
4 Mar 2026, 3:00 pmClosed
The Block Developement Officer Pernambut
The Block Developement Office Pernambut
Vellore District Providing Deck Slab, Retaining wall For C.D Cheruvu Burail Ground Road in C.d Cheruvu Panchayat in Pernambut block General Fund 2025 -2026 Package no 01
2026_RDTN_666497_1
A3/1800/2025
Open Tender
Civil Works
180 days
The Block Developement Office Pernambut
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹46,000
21 May 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
Vellore District Providing Deck Slab, Retaining wall For C.D Cheruvu Burail Ground Road in C.d Cheruvu Panchayat in Pernambut block General Fund 2025 -2026 Package no 01
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, as per SS 20B complete.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centring for sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Below GL
Above GL
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Providing Weep Holes
Deck Slab
Supplying and erecting centring for sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Supply and fabrication of steel including cost and conveyance and all labour charges etc, complete.
Rainforcement Cement concrete 1:1-1/2:3 mix using 20mm ISS metal including cost and conveyance with labour charges etc.complete.
Towards Name Board Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_800611.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.29 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_800611.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid