Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.7 LSame as L1Rejected-Finance | ₹7.7 LSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L3₹9.1 L+₹1.4 L (17.6%)Rejected-Finance | ₹9.1 L+₹1.4 L (17.6%) | L3 | Rejected-Finance l3 |
| 4 | L4₹9.1 L+₹1.4 L (17.6%)Rejected-Finance | ₹9.1 L+₹1.4 L (17.6%) | L4 | Rejected-Finance l4 |
| 5 | L5₹9.1 L+₹1.3 L (17.1%)Rejected-Finance | ₹9.1 L+₹1.3 L (17.1%) | L5 | Rejected-Finance l5 |
Tender Value
₹9.1 L
EMD Value
₹91,043
Closing Date
25 Feb 2026, 3:00 pmClosed
c.e office
c. eoffice kanpur nagar nigam
zone-01 ward-71 105/159 to 105/164 tak gali ka sudhar ka karaya
2026_NNKAN_1118086_1
219/AA-1/2025-26
Open Tender
Civil Works
Fixed-rate
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹91,043
Yes
4 Aug 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismentling of damage ce including stacking dismental material with in 60m distence etc all comp | 304 | sqm | 67 | ₹20,368 |
| 1.02 | Construction of G.S.B Etc all comp. | 30.4 | cum | 3,671 | ₹1,11,598.4 |
| 1.03 | M-150 h/w with 14 cement & Csand mortar ete all comp Super structure | 0.83 | cum | 6,600 | ₹5,478 |
| 1.04 | Cartage of earth and dismental material upto 3.00km including loading unloading etc all comp | 30.4 | cum | 116.96 | ₹3,555.58 |
| 1.05 | Providing & laying in position M-30 grade ready mixed plain cement concrete with cement content as per approved design mix and manufactured in fully automatic batching plant and transportes to site of in transit mixer, and manufacture as per mix design of specified grade for plain cement concrete work, including pumping of RMC from transit mixer to site of laying and cunning, including cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS 9103. DSR 16.43.2 | 55.5 | sqm | 8,538.55 | ₹4,73,889.52 |
| 1.06 | Earth work in excavation means (hydraulic )excavator/manual means in foundation trenches are drains (not exceeding 1.5 mtr in width or 10swm on plan), excavation soil and disposal off sarface exavated soil as directed, within lead of 50 m.including dressing of side and ramming of bottoms, lift up to 1.5 m, including getting out the all kinds of soil. | 15.3 | cum | 215 | ₹3,289.5 |
| 1.07 | Supply/fixing and Jointing RCC hume pipe 250mm dia etc all comp. | 15 | rmt | 673.6 | ₹10,104 |
| 1.08 | construction of Chamber internal size 60x.60x.90 with all charges etc all comp. | 3 | nos | 7,464 | ₹22,392 |
| 1.09 | 15 mm thick cement plaster in single coat on fair side of single of half brick wall with 1:4cement finish with a floating coat of neet cement etc all comp. | 18 | sqm | 232 | ₹4,176 |
| 1.1 | providing and laying in cement conc Concrete 1:4:8(1 Cement4 fine sand and 8cm. gauge stone Ballast)and curing comp including cost of form work in foundation and floors etc all comp. | 5.76 | sqm | 5,740 | ₹33,062.4 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2078028.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
BOQ_2078028.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .