Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrRejected-Finance | ₹4.0 Cr | L1 | Rejected-Finance Rate quoted bidder are higher side which are not justified and rejected by the Competent Authority. |
| 2 | Rejected-Technical 1 MEHANDI KADAL ANANTNAG ANANTNAG ANANTHNAG JAMMU KASHMIR 192101 | ANANTNAG | JAMMU AND KASHMIR | 192101 | - | - | Rejected-Technical Document submitted by the bidder not as per NIT |
| 3 | Rejected-Technical | - | - | Rejected-Technical Document submitted by the bidder not as per NIT |
| 4 | Rejected-Technical 301 ASHIRVAD PARAS OPP PRAHLADNAGAR GARDEN SATELLITE AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | - | - | Rejected-Technical Document submitted by the bidder not as per NIT |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
14 Jun 2024, 12:00 pmClosed
SE ELECTRICAL
COMMANDANT/SE ELECTRICAL OFFICE CGO COMPLEX BSF NEW DELHI
Providing, installation, testing and commissioning of 25 KWp off Grid Solar Power Plant at 10 BOPs of 44 BN, 46 BN and 171 BN BSF, of SHQ Sunderbani under FTR HQ BSF Jammu
2024_BSF_808498_1
01/SE(E)/NIT/FTR-JMU/2024-25
Open Tender
Electrical Works
EPC Contract
365 days
BORDER BOPs OF SHQ SUNDERBANI
AS PER NIT
12 documents required · 12 mandatory
₹0
₹7.0 L
EE ELECT FTR BSF JAMMU OR AE ELECT SBN
23 Oct 2024
23 May 2024
19 Jun 2024
23 May 2024
14 Jun 2024
23 May 2024
29 May 2024
Amount
Providing, installation, testing and commissioning of Hybrid/off-grid ( with the provision to charge from main power source) Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, conc) Data Monitoring System complete with accessories.sisting of Mono Crystalline silicon solar cells, necessary protections, earthing, mounted on RCC structure of suitable strength with following components complete etc as required The rates quoted should be inclusive of all taxes, transportation charges, loading/unloading at site etc as reqd:- a) Solar Photovoltaic Module of capacity 350 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IEC 61730-Part-1, IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU/Inverter unit) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. c) Data Monitoring System complete with accessories. d)Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. g) Battery bank of required capacity of solar plant, VRLA 2 volts 750/800 AH - 120 nos batteries. (Total battery bank capacity 1,80,000/- VAH) / Full load battery backup must be up to 06 hrs as per MNRE standards, along-with battery rack and interconnections. h) Cost for construction of RCC structure as required for Battery bank / Control room shall be of size 150 sq. feet (minimum), with head room of minimum 2.9 meters & plinth height shall be minimum 1.8 meter (minimum) from natural ground level as per drawing to be approved by Engineer-in-charge. The flooring should be of RCC (must withstand the load of batteries and other equipment). Steel gate, window-02 nos (minimum) , opening for exhaust must be installed in control room. Roof of control room must be so designed to prevent water lodging and providing approach path of cement concrete from battery room to solar panels (120 sq MTR) of 40 MTR etc. complete as per Scope of Work & Technical Specifications .
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .