Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.1 L+₹30,704.98 (3.47%)Admitted-Finance BUILDING NO FLAT NO 702 ROAD STREET GOHANA LOCALITY SUB LOCALITY NEAR GOVT BOYS SCHOOLS CITY TOWN VILLAGE BUTANA KHETLAN DISTRICT SONIPAT STATE HARYANA | BUTANA KHETLAN | SONIPAT | HARYANA | L2 | Admitted-Finance | |
| 3 | L3₹10.3 L+₹1.4 L (16.0%)Admitted-Finance VPO KALIYANA TEHSIL AND DISTT CHARKHI DADRI 127306 | KALIYANA | CHARKHI DADRI | HARYANA | 127306 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | THE KALIYANA SHRI SANWARIYA CO OP L AND C SOCIETY LTD L3 | PMV Buildcon Private Limited L1 | THE KK CO-OPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD L2 |
|---|---|---|---|---|---|---|
| 1.00 | [10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate] | 58.53 | Sqm | 199.1 ₹11,653.32 | 181 ₹10,593.93 Lowest | 203 ₹11,881.59 |
| 2.00 | [11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [Through Rate] | 208.47 | Sqm | 20.9 ₹4,357.02 | 19 ₹3,960.93 Lowest | 22 ₹4,586.34 |
| 3.00 | [11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate] | 268.26 | Sqm | 53.9 ₹14,459.21 Lowest | 55 ₹14,754.3 | 55 ₹14,754.3 |
| 4.00 | [11.9.1]15 mm cement plaster on rough side of single or half brick wall of mix: 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 530.22 | Sqm | 113.3 ₹60,073.93 | 90 ₹47,719.8 Lowest | 115 ₹60,975.3 |
| 5.00 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] | 530.2 | Sqm | 96.8 ₹51,323.36 | 70 ₹37,114 Lowest | 98 ₹51,959.6 |
| 6.00 | [13.18]Providing and fixing hard drawn steel wire fabric 75 mm X 25 mm rectangular mesh with 3.25 mm dia wire fixed on steel windows of standard rolled sections with 3 mm thick flat iron cover moulding of 12.5 mm width fixed with machine screws welded complete in all respect. [Through Rate] | 208.47 | Sqm | 983.4 ₹2,05,009.4 | 600 ₹1,25,082 Lowest | 800 ₹1,66,776 |
| 7.00 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 3,576.14 | Kg. | 91.3 ₹3,26,501.58 | 90 ₹3,21,852.6 | 89 ₹3,18,276.46 Lowest |
| 8.00 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 38.23 | cum | 91.3 ₹3,490.4 | 90 ₹3,440.7 Lowest | 93 ₹3,555.39 |
| 9.00 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 6.31 | cum | 3,823.6 ₹24,126.92 | 3,476 ₹21,933.56 Lowest | 3,500 ₹22,085 |
| 10.00 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | 12.74 | cum | 2,686.2 ₹34,222.19 | 2,442 ₹31,111.08 Lowest | 2,735 ₹34,843.9 |
Tender Value
₹9.3 L
EMD Value
₹18,640
Closing Date
18 Jun 2026, 3:00 pmClosed
JAGDISH SINGH DAHIYA
ENGG.CELL, MDU, Rohtak
Construction of boundary wall with grill near clay court and hurdle ground in sports complex, MDU, Rohtak.
2026_HRY_522337_1
20266AA3B0BA DE30 41ED BF81 7FA0CE9F5BDB817MDU
Open Tender
Civil Works
Works
45 days
Rohtak
Construction of boundary wall with grill near clay court and hurdle ground in sports complex, MDU, Rohtak.
2 documents required · 2 mandatory
₹1,000
₹18,640
Yes
8 Oct 2026
18 May 2026
19 Jun 2026
18 May 2026
18 Jun 2026
18 May 2026
18 May 2026 - 20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate] | 58.53 | Sqm | - | - |
| 2 | [11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [Through Rate] | 208.47 | Sqm | - | - |
| 3 | [11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate] | 268.26 | Sqm | - | - |
| 4 | [11.9.1]15 mm cement plaster on rough side of single or half brick wall of mix: 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 530.22 | Sqm | - | - |
| 5 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] | 530.2 | Sqm | - | - |
| 6 | [13.18]Providing and fixing hard drawn steel wire fabric 75 mm X 25 mm rectangular mesh with 3.25 mm dia wire fixed on steel windows of standard rolled sections with 3 mm thick flat iron cover moulding of 12.5 mm width fixed with machine screws welded complete in all respect. [Through Rate] | 208.47 | Sqm | - | - |
| 7 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 3,576.14 | Kg. | - | - |
| 8 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 38.23 | cum | - | - |
| 9 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 6.31 | cum | - | - |
| 10 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | 12.74 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_601256.xls
BOQ • 1.25 MB
AD0160035.pdf
Additional Documents • 2.39 MB
316-337.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .