Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAccepted-AOC | ₹36.0 L | L1 | Accepted-AOC Found lowest one |
| 2 | L2₹37.3 L+₹1.2 L (3.39%)Rejected-Finance | ₹37.3 L+₹1.2 L (3.39%) | L2 | Rejected-Finance Quoted high rate as compare to L1 bidder |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
24 Dec 2020, 2:00 pmClosed
Executive Engineer
Rural Engineering Wing Leh
Const.of bridge at Shachan nallah at Stok
2020_RDD_1750_4
NIT 146 UTLeh REW of 2020-21
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer
₹80,000
Yes
19 Jan 2021
17 Dec 2020
26 Dec 2020
17 Dec 2020
24 Dec 2020
17 Dec 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil
Providing and laying dry stone in horizontal level, including the cost of stone.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Centring and shuttering including strutting propping etc and removal of form work for. Columns, piers, abutments, pillars, posts and struts.
Centring and shuttering including strutting propping etc and removal of form work for Suspended floors, roofs, landings, balconies and access platform.
Centring and shuttering including strutting propping etc and removal of form work for Edges of slabs and breaks in floors and walls. Above 20cms wide.
Centring and shuttering including strutting propping etc and removal of form work for Edges of slabs and breaks in floors and walls Under 20cms wide.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) Crushed
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 course sand 4 graded stone aggregate 20mm nominal size Crushed
Providing and laying of Ms pipe of diameter 300 mm , including loading , unloading, placing in position, carriage, complete job.
Steel work in built up tubular round, square or rectangular including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer including welding and bolting with special shaped washers etc.complete. Hot finished welded type tubes
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
Carriage of sand and course aggregate by mechanical transport for average lead upto 15 Km.
Carriage of Stone by mechanical transport for average lead upto 15 Km.
Carriage of Cement and steel by mechanical transport for average lead upto 20 Km.
M/S ABDUL REHMAN SHEIKH GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .