| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹112.7 CrAccepted-AOC 8 481 FAFADIH NEAR RAILWAY CROSSING RAIPUR CHATTISGARH 492001 | RAIPUR | RAIPUR | CHHATTISGARH | 492001 | L1 | Accepted-AOC Award amount after deducting Schedule of credit 274218.00 | |
| 2 | L2₹113.6 Cr+₹84.9 L (0.75%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹114.2 Cr+₹1.4 Cr (1.27%)Rejected-Finance NO 52 R V ROAD BASAVANAGUDI BANGALORE 560004 | BANGALORE | BANGALORE URBAN | KARNATAKA | 560004 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹115.4 Cr+₹2.7 Cr (2.37%)Rejected-Finance CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹118.7 Cr+₹6.0 Cr (5.31%)Rejected-Finance ENKAY TOWN PLAZA B I BLOCK PALAM VIHAR GURUGRAM HR 122017 | GURUGRAM | GURUGRAM | HARYANA | 122017 | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | VISHAL INFRASTRUCTURE LTD L3 | Som Projects Pvt Ltd L7 | NSC Projects Pvt. Ltd. L5 | SHRI GURMUKHDAS CONTRACTORS PVT. LTD. L1 | Brahma Infra L6 | M M SHAWL Engineers and contractors pvt ltd L4 | CH GOWRI SHANKAR INFRA BUILD INDIA PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| .10Schedule "A" Part – I [BUILDINGS & STRUCTURES] | ||||||||||
| 1.00 | Construction of hangar of RCC framed structure with PEB structure complete all as specified and as shown on drawings and as directed. | 1 | Each | 39,95,10,381 ₹39,95,10,381 Lowest | 56,60,58,280.98 ₹56,60,58,280.98 | 49,04,59,080 ₹49,04,59,080 | 41,01,00,000 ₹41,01,00,000 | 48,00,00,000 ₹48,00,00,000 | 46,00,00,000 ₹46,00,00,000 | 40,00,72,920.58 ₹40,00,72,920.58 |
| 2.00 | Construction of operational centre & command control complex complete all as specified and as shown on drawings. | 1 | Each | 16,89,93,797 ₹16,89,93,797 | 33,42,10,644.8 ₹33,42,10,644.8 | 20,74,04,713 ₹20,74,04,713 | 13,43,00,000 ₹13,43,00,000 Lowest | 26,00,00,000 ₹26,00,00,000 | 24,00,00,000 ₹24,00,00,000 | 29,00,00,000 ₹29,00,00,000 |
| 3.00 | Construction of ware house/ technical complex complete all as specified and as shown on drawings. | 1 | Each | 12,13,70,796 ₹12,13,70,796 | 5,52,19,610 ₹5,52,19,610 Lowest | 9,59,57,030 ₹9,59,57,030 | 9,85,00,000 ₹9,85,00,000 | 9,52,00,000 ₹9,52,00,000 | 6,40,00,000 ₹6,40,00,000 | 8,08,80,000 ₹8,08,80,000 |
| 4.00 | Construction of POL store complete all as specified and as shown on drawings. | 1 | Each | 36,44,767 ₹36,44,767 | 21,67,726.08 ₹21,67,726.08 | 24,26,024 ₹24,26,024 | 41,00,000 ₹41,00,000 | 22,00,000 ₹22,00,000 | 25,00,000 ₹25,00,000 | 17,50,000 ₹17,50,000 Lowest |
| 5.00 | Construction of sub station building complete all as specified and as shown on drawings. | 1 | Each | 72,09,956 ₹72,09,956 | 53,84,033.2 ₹53,84,033.2 | 47,98,773 ₹47,98,773 | 65,00,000 ₹65,00,000 | 55,00,000 ₹55,00,000 | 40,00,000 ₹40,00,000 Lowest | 44,50,000 ₹44,50,000 |
| 6.00 | Construction of storage building complete all as specified and as shown on drawings. | 1 | Each | 1,01,91,160 ₹1,01,91,160 | 1,67,69,263.2 ₹1,67,69,263.2 | 1,68,61,639 ₹1,68,61,639 | 2,61,00,000 ₹2,61,00,000 | 1,70,00,000 ₹1,70,00,000 | 1,30,00,000 ₹1,30,00,000 | 79,00,000 ₹79,00,000 Lowest |
| 7.00 | Construction of Car parking shed complete all as specified and as shown on drawings. | 1 | Each | 60,86,514 ₹60,86,514 | 58,61,832.9 ₹58,61,832.9 | 37,00,607 ₹37,00,607 Lowest | 61,00,000 ₹61,00,000 | 42,00,000 ₹42,00,000 | 72,00,000 ₹72,00,000 | 47,00,000 ₹47,00,000 |
| 8.00 | Construction of RCC septic tank for 150 users complete all as specified and as shown on drawings. | 1 | Each | 5,29,431 ₹5,29,431 | 7,17,382.14 ₹7,17,382.14 | 10,71,670 ₹10,71,670 | 11,00,000 ₹11,00,000 | 16,00,000 ₹16,00,000 | 5,00,000 ₹5,00,000 Lowest | 7,50,000 ₹7,50,000 |
| 9.00 | Construction of 150 users RCC septic tank for carry sludge water, excavation in any type of soil, PCC 1:4:8 type D2 below foundation , vent shafts, connection etc., for conventional type complete all as specified and as shown on drawings. | 1 | Each | 5,29,431 ₹5,29,431 Lowest | 7,17,382.14 ₹7,17,382.14 | 10,71,670 ₹10,71,670 | 7,50,000 ₹7,50,000 | 16,00,000 ₹16,00,000 | 6,00,000 ₹6,00,000 | 5,85,000 ₹5,85,000 |
Tender Value
₹122 Cr
EMD Value
₹15 L
Closing Date
14 Jul 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER NAVY VISAKHAPATNAM
CHIEF ENGINEER NAVY STATION ROAD VISAKHAPATNAM
PROVISION OF TECHNICAL INFRASTRUCTURE AND ASSOCIATED FACILITIES FOR DAY ONE OPS OF HALE RPA AT INS RAJALI, ARAKKONAM
2025_MES_743972_1
88758
Open Tender
Civil Works
Lump-sum
730 days
RAJALI ARAKKONAM
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹3,000
GE M Arakkonam
₹15 L
Yes
31 Oct 2026
10 Dec 2025
21 Jul 2026
21 Apr 2026
14 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Schedule "A" Part – I to Schedule "A" Part – XXI:
NOTE: Schedule "A" Part – I to Part – XIX are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | - | - | - | - |
| 1 | Lumpsum price worked out by the contractor for "Buildings & Structures", as listed in Schedule "A" Part – I . | 1 | EACH JOB | 84,79,00,000 | ₹84,79,00,000 |
| - | Lumpsum price worked out by the contractor for "Site Clearance / Earthwork/ Excavation/ Area development", as listed in Schedule "A" Part – II . | 1 | EACH JOB | 3,88,48,832.65 | ₹3,88,48,832.65 |
| - | Lumpsum price worked out by the contractor for "Internal Electrification", as listed in Schedule "A" Part – III . | 1 | EACH JOB | 7,46,294.48 | ₹7,46,294.48 |
| - | Lumpsum price worked out by the contractor for "Internal Water Supply", as listed in Schedule "A" Part – IV . | 1 | EACH JOB | 1,75,109.07 | ₹1,75,109.07 |
| - | Lumpsum price worked out by the contractor for "Sewage Disposal ", as listed in Schedule "A" Part – V . | 1 | EACH JOB | 6,31,714.14 | ₹6,31,714.14 |
| - | Lumpsum price worked out by the contractor for "External Water Supply", as listed in Schedule "A" Part – VI | 1 | EACH JOB | 10,36,075.2 | ₹10,36,075.2 |
| - | Lumpsum price worked out by the contractor for "External Electrification", as listed in Schedule "A" Part – VII | 1 | EACH JOB | 2,09,85,508.07 | ₹2,09,85,508.07 |
| - | Lumpsum price worked out by the contractor for Roads/Culvert/concrete pad", as listed in Schedule "A" Part – VIII . | 1 | EACH JOB | 2,62,93,909.28 | ₹2,62,93,909.28 |
| - | Lumpsum price worked out by the contractor for "Area drainage", as listed in Schedule "A" Part – IX | 1 | EACH JOB | 86,69,020.86 | ₹86,69,020.86 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.98 MB
88758TENDER.pdf
Tender Documents • 2.81 MB
BOQ_833053.xls
BOQ • 0.41 MB
88758tech1.pdf
PDF • 0.70 MB
88758date17.pdf
PDF • 0.61 MB
88758DATE16.pdf
PDF • 0.61 MB
88758date15.pdf
PDF • 0.61 MB
88758date14.pdf
PDF • 0.61 MB
88758date13.pdf
PDF • 0.61 MB
88758DATE12.pdf
PDF • 0.61 MB
88758date11.pdf
PDF • 0.61 MB
DRGSHALERPA.rar
PDF • 35.37 MB
88758date10.pdf
PDF • 0.61 MB
88758date9.pdf
PDF • 0.61 MB
88758DATE8.pdf
PDF • 0.61 MB
88758date7.pdf
PDF • 0.63 MB
88758date6.pdf
PDF • 0.63 MB
88758date5.pdf
PDF • 0.64 MB
date488758.pdf
PDF • 0.64 MB
88758date3.pdf
PDF • 0.64 MB
88758date2.pdf
PDF • 0.64 MB
88758date1.pdf
PDF • 0.63 MB
88758Sch.pdf
PDF • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .