| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.9 LAccepted-AOC | L-1 | Accepted-AOC Lowest qualified bidder. Hence being awarded | |
| 2 | L-2₹3.1 L+₹21,806.05 (7.47%)Rejected-AOC | L-2 | Rejected-AOC Not a qualified L-1 bidder | |
| 3 | L-3₹3.4 L+₹45,818.85 (15.7%)Rejected-AOC EKTA CHOWK WARD NO 2 DURGAPUR NEAR QURESHI MASJID CHANDRAPUR MAHARASHTRA 442404 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442404 | L-3 | Rejected-AOC Not a qualified L-1 bidder |
Tender Value
₹4.4 L
EMD Value
₹5,600
Closing Date
13 Aug 2024, 6:30 pmClosed
Shri. G. N. V. S. Sri Harsha
office of Gouri Sub Area, Rajura
Construction of drain from Z.P. Primary School, Babapur to Shri Santosh Parkhi farm towards culvert under CSR at Babapur village under Gouri Sub Area
2024_WCL_314212_1
wcl-ba3612-civ-e03/2024-25
Open Tender
Civil Works - Others
Item Rate
30 days
Gouri Pouni (A) OCM
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,600
17 Feb 2025
3 Aug 2024
14 Aug 2024
3 Aug 2024
13 Aug 2024
3 Aug 2024
3 Aug 2024 - 10 Aug 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Total impact of GST for the purpose of CTC
S S CONSTRUCTION
MANASVI ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .