The Commissioner, Coimbatore Corporation
JNNURM Conference Hall, Coimbatore Corporation
Construction of sump 3 Lakh Litres Capacity at Kalveerampalayam of West Zone Coimbatore Corporation.
2024_MAWS_515347_3
e62/2024 Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹49,900
21 Mar 2025
30 Dec 2024
8 Jan 2025
30 Dec 2024
7 Jan 2025
30 Dec 2024
Amount
Dismanting the damaged RCC
Dismanting the damaged Brick work
Earth work excavation in all kinds of soil incluidng sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum.in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial elad and 2m initial lift as per the directiono f engineer in charge
Plain cement concrete 1:2:4 (one cement, two sand and four aggregates) using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing laying compacting and curing etc complete
Supplying and erecting SHUTTERING including necessary supports for plane surfaces such as vertical walls etc using mild steel sheets of size 90cmx60cm and BG 10 stiffened with welded mild steel angles for boarding supported by cauarinas props at suitable intervals etc complete complying with standard specification and as directed
Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for all RCC items of work excluding centering, shuttering and cost of reinforcemetn grill but including curing finshing, vibrator charges etc complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc complete
Supplying , fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification
Plastering with cement mortor 1:3 mix (1part cement and 3 part sand) using 20mm thick
Providing chemical treatment for the surfaces with two coats of polymer based cementious coating and then applying two coats of elastomeric coating on the surface including cleaning and crack filling etc complete
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .