| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹1.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹1.4 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M CHELLAPPANDI L3 | P.MALAICHAMY L2 | VASANTHA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of Horizontal Soak Pit at Pandalgudi Village in Pandalgudi Panchayat | ||||||
| 1.01 | Earth work excavation in Hard Soil - Earth work excavating and Deposting with in initial Lead 0f 10m and lift of 2m (For roads,Supply Channels,Desting of MI Tanks,Pond & Kulam) - upto 0.30m depth | 24.86 | m3 | 261.14 ₹6,491.94 | 145.94 ₹3,628.07 Lowest | 245.32 ₹6,098.66 |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete | 3.05 | m3 | 5,545.21 ₹16,912.89 | 5,126.17 ₹15,634.82 Lowest | 5,209.13 ₹15,887.85 |
| 1.03 | Supplying and erection centering Shuttering inculding necessary Support for plane | 12.6 | m3 | 542.03 ₹6,829.58 | 504.68 ₹6,358.97 Lowest | 509.18 ₹6,415.67 |
| 1.04 | Cement concrete 1:3:6 mix usin 20 mm ISS metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete | 1.58 | m2 | 6,293.7 ₹9,944.05 | 6,214.88 ₹9,819.51 | 5,912.26 ₹9,341.37 Lowest |
| 1.05 | Brick work with cement mortar 1:5 mix using Country bricks 83/4"x41/4"x23/4" and conveyance of all materiales to Site and all labour chargesetc ,complete. | 6.24 | m3 | 6,152.86 ₹38,393.85 | 7,109.3 ₹44,362.03 | 5,779.96 ₹36,066.95 Lowest |
| 1.06 | Plastering with Cement Morter 1:5 mix 12 mm thick (Using M-Sand) inculding cost and conveyance of all materials to site and labour charges etc | 57.25 | m2 | 282.45 ₹16,170.26 | 194.02 ₹11,107.65 Lowest | 265.33 ₹15,190.14 |
| 1.07 | Supplying and Filling ISS HBG 20 mm metal inculding cost and conveyance of all materials to site and labour charges etc | 1.62 | m2 | 2,172.19 ₹3,518.95 | 1,104 ₹1,788.48 Lowest | 2,040.54 ₹3,305.67 |
| 1.08 | Supplying and Filling 4 to 8 mm Chips inculding cost and conveyance of all materials to site and labour charges etc | 4.46 | kg | 1,160.41 ₹5,175.43 | 884 ₹3,942.64 Lowest | 1,090.08 ₹4,861.76 |
| 1.09 | Supply of PVC pipes 110mm dia with all labour charges etc complete. | 24 | m2 | 141.17 ₹3,388.08 | 345 ₹8,280 | 132.62 ₹3,182.88 Lowest |
Tender Value
₹1.5 L
EMD Value
₹1,520
Closing Date
20 Aug 2026, 4:00 pmClosed
The Block Development Officer (V.P)
The Block Development Officer (V.P),Aruppukottai
Construction of Horizontal Soak Pit at Pandalgudi Village in Pandalgudi Panchayat
2026_RDTN_690588_1
ROC/SBM-C5/2862/2026 Dated 20.07.2026
Open Tender
Civil Works
Item Wise
Pandalgudi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,520
The Block Development Officer (V.P)
20 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Horizontal Soak Pit at Pandalgudi Village in Pandalgudi Panchayat | |||||
| 1.01 | Earth work excavation in Hard Soil - Earth work excavating and Deposting with in initial Lead 0f 10m and lift of 2m (For roads,Supply Channels,Desting of MI Tanks,Pond & Kulam) - upto 0.30m depth | 24.86 | m3 | - | - |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete | 3.05 | m3 | - | - |
| 1.03 | Supplying and erection centering Shuttering inculding necessary Support for plane | 12.6 | m3 | - | - |
| 1.04 | Cement concrete 1:3:6 mix usin 20 mm ISS metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete | 1.58 | m2 | - | - |
| 1.05 | Brick work with cement mortar 1:5 mix using Country bricks 83/4"x41/4"x23/4" and conveyance of all materiales to Site and all labour chargesetc ,complete. | 6.24 | m3 | - | - |
| 1.06 | Plastering with Cement Morter 1:5 mix 12 mm thick (Using M-Sand) inculding cost and conveyance of all materials to site and labour charges etc | 57.25 | m2 | - | - |
| 1.07 | Supplying and Filling ISS HBG 20 mm metal inculding cost and conveyance of all materials to site and labour charges etc | 1.62 | m2 | - | - |
| 1.08 | Supplying and Filling 4 to 8 mm Chips inculding cost and conveyance of all materials to site and labour charges etc | 4.46 | kg | - | - |
| 1.09 | Supply of PVC pipes 110mm dia with all labour charges etc complete. | 24 | m2 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_830260.xls
BOQ • 0.28 MB
Document.pdf
Tender Documents • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].